• Dashboard
  • Resumes
  • Cover Letters
  • Resumes
    • Resumes
    • Resume Builder
    • Resume Examples
      • Resume Examples
      • Nursing
      • Customer Service
      • Education
      • Sales
      • Manager
      • View All
    • Resume Search
    • Resume Templates
      • Resume Templates
      • Microsoft Word
      • Professional
      • Modern
      • Traditional
      • Creative
      • View All
    • Resume Services
    • Resume Formats
      • Resume Formats
      • Chronological
      • Functional
      • Combination
    • Resume Review
    • How to Write a Resume
      • How to Write a Resume
      • Summary
      • Experience
      • Education
      • Skills
        • Skills
        • Hard Skills
        • Soft Skills
    • Resume Objectives
  • CV
    • CV
    • CV Examples
    • CV Formats
    • CV Templates
    • How to Write a CV
  • Cover Letters
    • Cover Letters
    • Cover Letter Builder
    • Cover Letter Examples
      • Cover Letter Examples
      • Customer Service
      • Marketing
      • Sales
      • Education
      • Accounting
      • View All
    • Cover Letter Services
    • Cover Letter Templates
    • Cover Letter Formats
    • How to Write a Cover Letter
  • Questions
  • Resources
  • About
    • About
    • Reviews
  • Contact
  • jane
    • Settings
    • Help & Support
    • Sign Out
  • Sign In
Member Login
  • LiveCareer
  • Resume Search
  • Asst. Project Manager
Please provide a type of job or location to search!
SEARCH

Asst. Project Manager Resume Example

Love this resume?Build Your Own Now
ASST. PROJECT MANAGER
Experience
Asst. Project Manager
November 2016 to Current
David Evans And Associates
  • Managed by Keppel Singapore), U.A.E Managing Design-Build Project -Self Elevating Fixed Platform.
  • Responsible for overall planning and execution of the project.
  • Responsible for identifying and continuously managing project risks and issues.
  • Managing project team to ensure that all milestones are achieved within the agreed timeframes.
  • Monitoring and managing all Subcontractors, Suppliers on various project activities.
  • Monitoring and maintaining the project schedule on weekly basis.
  • Reviewing weekly and monthly Project Progress Report.
  • Maintaining and enforcing good construction standards and quality control at site.
  • Single point of contact for all communication between the client, ABS and yard.
  • Assisting Commercial and Finance Team in preparation of project budget, change orders and cash flow.
  • Ensuring completion of and track all independent testing, commissioning and inspections as required.
  • Responsible for Health, Safety and Environment aspects of project and personnel involved on project.
  • Ensures successful project close out by managing subcontractor closeout, transfer of liabilities, customer training, punch list closeout and establishing warranties.
Project Engineer
June 2015 to November 2016
Elwyn
  • Managed by Keppel Singapore), U.A.E Prepared and updated project schedule in Primavera P6 based on the contract requirement.
  • Monitored critical activities based on the project schedule and advise project management.
  • Monitored day-to-day work progress (EPCC) and prepared the bi-weekly and monthly program and report.
  • Interacted daily with the clients to interpret their needs and requirements and represent them in the field.
  • Interacted with and assisted Project Manager to schedule works and coordinate assignments.
  • Expedited Purchasing for timely delivery of long lead equipment.
  • Managed and oversaw the day-to-day construction management of the project.
  • Defined Scope and Created WBS as related to construction and commissioning of the facilities in conformance with project specifications.
  • Monitored construction productivity and schedule performance and investigated reasons for less than satisfactory performance.
  • Chaired a daily VSCC Meeting (Vessel Safety Coordination Committee) to plan and co-ordinate all work that is to be carried out on board the ship so that such work is done safely and with due regard to the health of all persons working on the ship.
Site Coordinator
November 2012 to November 2014
Keppel Alpine - Tuas Yard
  • Liaised with vessel's in-charge regarding Job & Quality specification.
  • Collected necessary drawings and prepared construction schedule for all FPSO Conversion Projects.
  • Prepared & updated Cable Schedule, MTO for Electrical Materials.
  • Updated the progress of Electrical installations on daily basis.
  • Monitored and updated Punch-list & ITR status of all ongoing project and reported to Management.
  • Liaised with Contracting Department for opening and closing the SCR in iSRP System.
  • Monitored at site to ensure Quality Standard is being followed up.
  • Ensured that "as-built" drawings are prepared on an ongoing basis during the construction period and issued final close-outs to Engineering Department accordingly.
  • Involved in Manpower Estimation for the FPSO Conversion Projects.
  • Created manpower histogram with S-Curve and recorded actual manpower on weekly basis.
  • Involved in Installation & Commissioning of Electrical Systems.
Project Trainee
July 2012 to September 2012
Marico Limited
  • Involved in Six Sigma Project and increased availability of Pressure Leaf Filter.
  • Involved in Operation of 200 TPD edible oil extraction plant through advanced SCADA system with PLC- S7300.
  • Involved in Operation and maintenance of 1000 KVA transformers and substations.
  • Involved in Operation and maintenance of 725 KVA Diesel Generator (Caterpillar) Involved in Trouble shooting of 250 KW VFD.
MAJOR PROJECT EXECUTED
BUBIYAN FANAR For TOA CORPORATION
INTERNSHIP TRAININGS
The BUBIYAN FANAR
  • Self-elevated fixed offshore platform is designed for elevated operation in water depths of up to 9.4m for use as a Maritime Traffic Control Center (MTCC).
  • The MTCC is also designed to float on its own hull under restricted service transit to the site for installation.
  • The MTCC is designed for up to 54 m of leg length and to comply with the requirements of ABS for restricted service with the Class Notation: +A1, OFFSHORE INSTALLATION (OI).
  • Drilling Services of Rig, Oil & Natural Gas Corporation, Karaikal.
  • Electrical Equipment Installation for Hazardous Area in AS/NZS 4761.1 (Ex d, Ex e, Ex i, Ex n & Ex p) Special Maintenance in Electricity Department, Pondicherry.
  • Electrical Services and Communication, Neyveli Lignite Corporation, Neyveli.
  • Embedded Systems, VI Micro Systems Pvt.
  • Ltd, Chennai.
Accomplishments
  • D.O.B: 13 August 1991.
Education
Bachelor of Technology : Electrical & Electronics Engineering, May 2012Pondicherry UniversityIndiaElectrical & Electronics Engineering Specialized subjects include Electrical Safety and Quality Management, Industrial Management, Energy Engineering, Power system Analysis and Protection & Switchgears. *Elective: Transducers & Instrumentation, High Voltage Engineering & Special Electrical Machines.
Diploma : Electrical & Electronics Engineering, Mar 2009Karaikal Polytechnic CollegeIndiaElectrical & Electronics Engineering Semesters completed in all basic and elective Engineering subjects such as Electrical Machines, Electrical Circuit Theory, Electrical CAD's & Micro Controllers. *Elective: Control of Electrical Machines and Power Electronics.
Summary
Resourceful Project Manager skilled in streamlining operations and maintaining schedules to ensure maximum customer satisfaction and business revenue. Expertise in coordinating diverse teams and resources to complete objectives. Organized and detail-oriented with proactive and hard-working nature.
Certifications
Shipyard Safety Assessor (Hot Work Certification) course. * Shipyard Risk Assessment course.
Languages
Able to communicate in English &Tamil (Native).
Highlights
Familiar with the following software programs: *Project scheduling software Primavera P6 & MS Projects. *Engineering drawing software: AutoCAD, Autodesk Navisworks & Matlab. *Expert in using Microsoft office tools. (Excel, Word, Power point, Outlook)
Skills
AutoCAD, basic, Budget Management, budget, bi, Cable, CAD, cash flow, Change Management, closing, Construction Management, Conversion, Cost Control, client, clients, delivery, Electrical Systems, Electronics, Embedded Systems, English, Equipment Installation, fashion, Finance, Financial Management, drawing, Team Leadership, Managing, Materials, Matlab, Excel, Microsoft office, Outlook, Power point, Word, works, Natural Gas, Oil, personnel, PLC, Primavera, Progress, PROJECT MANAGEMENT, Project Planning, project plans, Purchasing, Quality, Quality Management, quality control, requirement, Risk Assessment, SAFETY, SCADA, Scheduling, Six Sigma, specification, S7300, system Analysis, transformers, Trouble shooting, VI
Additional Information
  • AWARDS &ACHIEVEMENTS Was Awarded the Safety Champion of the year-2013, Keppel Shipyard - SBM offshore & Marine. Involved in Six Sigma Project and increased availability of Pressure Leaf Filter. Marico Limited. Was Awarded the TSUNAMI Relief Operation, 2(P) Indep Coy NCC. Department level Second Rank in Engineering Third & Final Year. Achieved Centum of Attendance in Engineering, R.V.S College of Engineering & Technology.
Build Your Own Now

DISCLAIMER

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

67Fair
Resume Strength
  • Completeness
  • Formatting
  • Word choice
  • Length
  • Measurable results
  • Clear contact info
  • Typos

Resume Overview

School Attended

  • Pondicherry University
  • Karaikal Polytechnic College

Job Titles Held:

  • Asst. Project Manager
  • Project Engineer
  • Site Coordinator
  • Project Trainee
  • MAJOR PROJECT EXECUTED
  • INTERNSHIP TRAININGS

Degrees

  • Bachelor of Technology : Electrical & Electronics Engineering , May 2012
    Diploma : Electrical & Electronics Engineering , Mar 2009

Create a job alert for [job role title] at [location].

×

Advertisement

Similar Resumes

View All
Intern-Architect/Asst.-Project-Manager/Project-Manager-resume-sample

Intern Architect/Asst. Project Manager/Project Manager

Ward-Scott Architecture

City , STATE

Asst.-Vice-President,-Financial-Analyst-&-Project-Manager-resume-sample

Asst. Vice President, Financial Analyst & Project Manager

Lockheed Martin

Johnstown , PA

Asst-Project-Manager-and-Equal-Opportunity-Manager-resume-sample

Asst Project Manager and Equal Opportunity Manager

Naval Air Warfare Center Training Systems Division

City , STATE

  • About Us
  • Privacy Policy
  • Terms of Use
  • Sitemap
  • Work Here
  • Contact Us
  • FAQs
  • Accessibility
  • EN
  • UK
  • ES
  • FR
  • IT
  • DE
  • NL
  • PT
  • PL
customerservice@livecareer.com
800-652-8430 Mon- Fri 8am - 8pm CST
Sat 8am - 5pm CST, Sun 10am - 6pm CST
  • Stay in touch with us
Site jabber winner award

© 2022, Bold Limited. All rights reserved.