SP3D Piping SpecialistJul 2016 - Aug 2016Acciona S.A.Rio Hondo , TX
- Over 30 years experience in the design and engineering of Piping Systems and associated Equipment including pipe supports.
- Developed General Site Arrangements, 3D Piping and Equipment Modeling.
- Extensive experience in the design, review and checking of complex Systems and gravity piping Isometrics.
- Ability to identify, Analyze and Resolve design problems and interferences and coordinate with other disciplines.
- Proficient in PDS-3D Piping and Equipment Modeling, PDdraw, Isogen, Reporting Interference Manager, Smart Plant Review, Smart Plant 3D Piping and Equipment Modulus, Navisworks and MicroStation.
- Familiar with NRC 10CFR50, 55 ASME Codes and Standards Section II &III, B31.1, B31.3 and AWS D1.1.
- Assigned to the Uranium Processing Facility (UPF) project under the jurisdiction of the National Nuclear Security Administration (NNSA), Y-12 site office.
- Responsibilities cannot be disclosed for this project due to national security level classified.
- All design work accomplish in Smart Plant SP3D piping Modulus software.
Piping Engineer ModelerAug 2015 - Feb 2016Flatiron Construction Corp.Chino Hills , CA
- Assigned to the ESBWR Project, a 1575 Megawatts Natural Circulating Passive Boiler Water Reactor.
- Responsibilities included overseeing Piping and Equipment design activities in the Nuclear Island.
- Duties included the coordination of Equipment layout, engineering input, and final location of equipment.
- Respectively sharing with the piping group the liability of piping layout for all Systems in the Nuclear Island.
- Attended weekly project design review meetings in order to resolved design output and approvals.
- All design work accomplished in Smart Plant 3D Equipment and Piping Modulus and Smart Plant Review.
Procurement EngineerJan 2015 - Aug 2015Air Products And ChemicalsCincinnati
- Assigned to V.C.SUMMER 2&3 and VOGTLE 3&4 Nuclear Projects.
- Responsibilities included providing coordination of piping fabrication and procurement related activities for the Westinghouse AP1000 Nuclear Projects being constructed at the VOGTLE Nuclear Site (Southern Company) and the V.C. SUMMER Nuclear Site (SCANA).
- Work activities consisted of evaluation of fabricated pipe spools in regard to design change after fabrication and initiation/processing of Nonconforming disposition reports used to modify/correct pipe spool fabrication.Participated and completed training program for EPRI NUCLEAR UTILITY Commercial Grade Dedication Epri 3002002982 Rev.1 to EPRI NP-5652 and in accordance with NRC10CFR21.
Sr.PDS Piping Specialist/CheckerJul 2014 - Jan 2015Air Products And ChemicalsConvent , LA
- Assigned to Dow Chemical's LA-3 CME Project, performed piping layout and checking of the Ethylene expansion production project.
- Responsibilities including checking issued for construction isometric drawings for the entire project, systems included but not limited to (Blowdown, Benzene, Caustic, Condensate, Ethane, Fuel Gas, Fuel Oil, Methane, and Nitrogen Systems.
- Resolved Isometric extractions problems and Interference clashes.
- Interface with The stress analysis group in the resolution of assigned location for new pipe supports.
- All design work accomplished in PDS JD and Smart Plant Review 2010.
- Edwing Mantilla Page 2 WESTINGHOUSE NUCLEAR POWER PLANT DIVISION - Cranberry, P.A.
EQUIPMENT/PIPING PDS SPECIALISTMay 2009 - May 2014RtxBell , CA
- Assigned to the AP1000 CPP and APP Project, a two loop 1000 MWe Passive Pressurized Water Reactor.
- PWR).
- Responsibilities including the modeling of the reactor cooling pumps and associated piping loops Cold and Hot Legs, Fuel Handling Machine, Refueling Transfer Tubes, and Fuel Elevator.
- Lead and supervise a group of 12 people for the Certified for Construction Isometric Production Effort, Auxiliary Building, Containment Building, and Turbine Building.
- Attended project and design meetings in order to meet fast track schedules and project, resolutions and client requirements.
- All design work accomplished in PDS JD and Smart Plant Review 2010.
Sr.PDS Piping DesignerMay 2007 - Apr 2009Jones Lange Lasalle Inc.Hopkins , SC
- Calpine Otay Mesa Generating Project.
PDS Piping Specialist IIIFeb 2006 - May 2007Great Southwestern ConstructionAtlanta , GA
- General Electric (ESBWR).
- Smart Plant SP3D and Reliant Energy/Cheswick Power Station.
Sr.PDS Piping DesignerNov 2004 - Dec 2005
AppfolioSan Francisco , CA
Construction ManagerNov 2002 - Nov 2004
REDWING CONSTRUCTION L.L.CCity , STATE
Sr. PDS Piping DesignerFeb 2002 - Nov 2002
FRAMATOME/DUKE ENGINEERING SERVICES Meriden Gas Turbines, L.L.C Project.City , STATE
Lead PDS Piping DesignerAug 1999 - Feb 2002BURNS AND ROECity , STATE
- Entergy Power Group, Warren Project and Calpine Augusta and Baytown Projects.
Area Lead PDS Piping DesignerFeb 1997 - Jun 1999FLUOR DANIEL CORPORATION/TRS-TEKTONCity , STATE
- Area Lead PDS PipingDesigner.
- Ciba Specialty Chemicals and Sunoco Project.
Senior PDS Piping DesignerJun 1996 - Feb 1997
JOHN BROWN BASF PharmaceuticalCity , STATE
Senior Piping DesignerFeb 1996 - Jun 1996
MK FERGUSONCity , STATE
Senior Piping DesignerNov 1995 - Feb 1996
TENNESSEE EASTMANCity , STATE
Lead Designer Construction EngineerDec 1989 - Oct 1995
RAYTHEON ENGINEERS & CONSTRUCTORSCity , STATE
Senior Mechanical DesignerEBASCO SERVICES, INCCity , STATE
- Ebasco Division for Florida Power & Light.
- Stuart, FL- Procurement Engineer.
Lead EngineerJul 1985 - Dec 1989
Comanche Peak Power StationCity
Field EngineerJun 1984 - Jul 1985
ITT GRINELL INDUSTRIAL PIPING, INC. Nine-Mile PointCity , STATE
Quality Assurance EngineerFeb 1984 - Apr 1984
YANKEE ATOMIC ENERGY CORPORATION, INCCity
Piping/Mechanical Jr.DesignerJul 1979 - Feb 1984
EBASCO SERVICES, INC. II World Trade CenterCity