Qualified Civil Engineer who stays current with public safety and security standards. Safely operates and maneuvers a diverse range of heavy duty construction equipment.Physically fit and effective at completing difficult projects and tasks on schedule. Consistently follows through with all orders and instructions. Works well in a team setting. Civil Engineer committed to safety and the creation of solid infrastructure that will be of lasting value.
|
Lead the Segmental Box Girder Team Launching&Casting for LRT Klj Extension Package B during Junior executive level and managed to complete the project within the time line given.
Completion of Mass Rapid Transit Facilities Works for MRT Corp KVMRT SBK Pckg V4 (Contract Value: RM 1.1 Billion)
Planning and monitoring works during the Erection of Segmental Box Girder using "Launching Girder”, Pre-Stressing Works and Traffic Management at site.
Co-ordinate and direct with all parties involved and responsible for the daily operation of the project. Preparation and submission of Method Statements, Traffic Management Schemes, Works Procedures, QA/QC documentation etc. for approval by Authorities/Client. Prepare and install tie bars for the erection works. Monitoring and coordinating design for fabrication and installation of temporary works (Temporary props, scaffolding etc.).
Liaison with the client and Consultants (Design/Supervision consultants and Shop Drawing Consultant) and all sub-contractor in related works. Co-ordinate and monitoring work done by appointed sub-contractors for the respective specialist jobs (Hercules Engineering Sdn Bhd (Mechanical Pot Bearing), SGS Mega (Launching Girder Operator) and BBR Sdn Bhd (Pre-Stressing Works). Coordinating for heavy lifting procedure with crane supervisor in ensuring all lifting works done in proper and safe manner. Coordinating with crane supplier/transport supplier for daily erection operations. Coordinate and monitor all aspects (design/method statement/jacks arrangement/safety) been adhered during segment adjustments at site. Ensuring safety matters being implemented and complied by all riggers/workers at site at all times.
Construction of 11 Blocks Ministerial Building Complex at Parcel F.
(Contract Value: RM 1.8Billion)
Preparation of Master Planning Programme and all the temporary works at site. Lead a small team for the temporary works and client liaison (Putrajaya Holdings). Attending progress , safety and authority meeting on behalf of the project PIC and directly report to the Project Director on the daily site progress.
Project Experience: LRT Kelana Jaya Line Extension Pkg B (Contract Value: RM 569 Million)
Directly involved in negotiation with all suppliers and sub-contractors related to Segmental Box Girders Launching Works (i.e. Hydraulic Jacks Supplier – Power Team (Durajack & ENERPAC), Crane suppliers, Steel Girder Fabricator (WAIKO ENG Sdn Bhd), Bearing Fabricator - Hercules Engineering Sdn Bhd & MIN Rubber Sdn Bhd (Expansion Joint), Cement Grout suppliers: MAPEI, SIKA, Fosroc, etc.)
Co-ordinate with all parties involved and responsible for the daily operation of the project. Preparation and submission of Method Statements, Traffic Management Schemes, Works Procedures, QA/QC documentation etc. for approval by Authorities. Co-ordinate and monitoring work done at precast factory for casting of Segmental Box Girder by NSC (Nominated Sub Contractor) as per approved construction drawings, method statements and control the quality of work as per stipulated in the project specifications. Liaising with Authorities/Design Consultant, particularly in relation to the submission and approval of construction/shop drawings and as-built drawings.
Supervise the erection of Segmental Box Girder at site and to ensure that all procedures comply with the approved Construction Drawings and Specifications. Ensure temporary works are properly designed, checked and safely erected and that all certification and checks have been completed. Responsible for quality and safety associated with the construction of the works and general compliance with the contract document, current legislature and defined project procedures.
Scope of Work:
Direct and co-ordinate with plant and subordinate to meet the required concrete quality. Preparations and submissions of Concrete design Mix to Clients. Liaising with consultant and client on the required concrete specification.
Co-ordinate on site technician & materials allocation to the supplied site. Working almost independently for the region of PUTRAJAYA and CYBERJAYA for concrete quality control issues and complaints. Troubleshoot any issue arise accordingly.
Statistically analysed the quality of raw materials received (i.e; Sieve Analysis, Moisture content test, etc.) on daily basis to ensure the end products is well mix and in the level of acceptance by clients. Preparation of QA/QC Documentations for SIRIM ISO certification audit by SIRIM.
Project Experience: Pembinaan Masjid di Mukim Puncak Alam Untuk Tetuan Puncak Alam Holdings (RM42 Million)
Directly involved in the daily related activities at site and site coordination between all related parties (i.e; client, suppliers, authority, etc.). Preparation of method statement, request for inspections form, request for information, site diary and any related QA/QA documentation for SIRIM audit.
Supervise the construction of structure and piling activities at site to ensure all the procedures complies to the approved method statement and safety regulations. Co-ordinate the plants and manpower at site to ensure the targeted progress achieved.
Report directly to the Construction Manager and discuss if any issues arise accordingly. Preparation of Materials order and projection for the targeted duration to ensure the activities at site runs smoothly without any interruption from shortage of materials.
Preparation of Shop Drawing
Heavy Lifting Preparations&Planning
Heavy Lifting Equipments and Gears
Lifting Plan Preparations
Heavy Machineries Coordination
Used to Segmental Box Girder Erection Procedures
Post Tensioning Procedures and Issues
Familiar with Segment Casting Procedures
Authority Liaison and Presentation
Clients PR
Short Term Program Preparation
Coordination of Interfacing Works
CGPA: 2.95
CGPA: 3.11
5A&5B
Bilingual Malay/English
By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:
resume Strength
By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy