Summary
Mechanical) with 19 years' experience in Steel Fabrication and Erection in Large volume of steel for construction of Steel Structure for Oil Refinery and Petrochemical Plants, Steel Bridges, Steel Buildings, Plants structures, Tunnels' structures, Offshore Oil and Gas services, Offshore Containers and Cargo carrying units Objective: Seeking assignments in Steel Structures Project Planning / Construction Management / Project Management / Fabrication and Erection Engineering & Management / QA, QC Management / Estimation Management with an organization of repute preferably in Construction / Oil & Gas / Thermal Power industry / Any Civil Contracting Company dealing with structural steel fabrication and erection Location Preference: Mumbai / Karnataka / GCC Profile Summary A competent professional with 19 years of experience in: Project Execution Fabrication Operations Team Management Testing & Inspection Erection & Commissioning Site Management Liaison & Coordination Vendor Development Process Improvement Estimation Management Health, Safety and Environment Management Planning & Scheduling Adroit in review and checking that includes supervision, conceptual layout, fabrication drawings, material take-off and troubleshooting in construction, Quantity survey, estimation and tendering Capable of Independently handling all the activities of large projects which involves structural steel fabrication, painting and erection Effectively plan manpower category combination for maximum output; effectively plan for Plant & Machineries Expertise in Welding, Piping & NDT Inspection, Hydro & Pneumatic Test Inspection, conducting Witness Welding Procedure Qualification Test (WPQR) and implementing Quality Control Procedures Skilled in preparation of QAP (Quality Assurance Plan), ITP (Inspection Test Plan), WPS (Welding Procedure Specification), WPQR (Welding Procedure Qualification Records) as per IS (Indian Standards), ASME (American Society of Mechanical Engineers) and AWS (American Welding Society) & European Standards Successfully completed more than 1.5 Lakh Metric tons of structural steel fabrication and erection Capability of managing 3000 workforce for monthly production of 5000 metric tons of fabrication of Light/Medium/Heavy/Extra Heavy Steel Structure and erection / installation of same quantity Excellent relationship management and communication skills with the ability to network with consummate ease
Highlights
  • MS Word, MS Excel, MS Project
  • ERP, USE of SAP
Experience
Senior Estimation Engineer, 03/2015 to Current
Hd SupplyDecatur, GA,
  • Trained by Welding Research Institute (WRI), Bharat Heavy Electricals Ltd., India on Precautions to be taken for Steel Structure Fabrication to Avoid Welding Defects & Weld Distortion.
  • Trained by M/s DuPont, Canada, US for the subject of Health Safety and Environment and Topic ' Hazard Identification and Risk Assessment, Job Safety Analysis and safety Task Assessment' in construction Projects.
Senior Manager- Structural Steel Fabrication Workshop, 02/2014 to 03/2015
Oshkosh Corp.Pittsburgh, PA,
  • Fabrication Shop.
  • Project: Construction of expansion project, drive J3, the third phase of expansion of the world's largest refinery complex that Reliance Industries Limited operates at Jamnagar in Gujarat, India.
  • Role: Steel Structure Fabrication and Erection.
Workshop Engineer / Project Engineer - steel fabrication, 01/2014 to 01/2014
Venture Gulf Engineering W.L.LCity, STATE,
  • Doha, Qatar as Workshop Engineer.
  • Project: Fabrication of steel structure for Offshore Oil & Gas facilities for the clients Qatar Petroleum, Maersk Oil Qatar, Qatar General Electricity etc.
Manager- Fabrication, 11/2011 to 2013
Hindustan Construction Company LimitedCity, STATE, India
  • Fabrication, Assembly & Launching of Superstructure for Rail-cum-Road Bridge of Span Arrangement 32.0 MTR X 1 No.
  • 125.0 MTR X 39 Nos.
  • 32.0 MTR X 1 No.
  • in Bogibeel, Assam, India.
  • The total quantity of steel superstructure is 65000 tonnes to be completed within four years.
  • Role:.
  • Looking after fabrication, painting, assembly & launching of superstructure for rail-cum-road bridge.
Senior Manager- steel fabrication and erection, 09/2010 to 10/2011
Imperial Trading And Contracting Company W.L.L. At DohaCity, STATE, Qatar
  • Ensured timely completion of the projects with quality, safety and customer satisfaction including management of manpower and resources.
Assistant Manager- Fabrication, 08/2008 to 09/2010
Consolidated Construction Consortium LtdCity, STATE,
  • Fabrication) in Structural Steel Fabrication and Erection works Project: Construction of Industrial Buildings for Vehicle Manufacturing Plant of Mahindra Automotive Ltd.
  • at Chakkan in Pune Project: Construction of Steel Structures for Petro Fluidized Catalytic Cracker Unit (PFCCU) of Mangalore Refinery and Petrochemicals Ltd." at Mangalore in the state of Karnataka in the LSTK project of Engineers India Ltd., Delhi Project: Construction of Pipe Rack structures for offsite piping of Phase-III MRPL Refinery project Role: Handled technical, commercial, operational & administrative functions of the project which involves fabrication & erection of structural steel including preparation of fabrication drawing and supply of material Acted as Single Point Contact for coordinating with client, vendors, subordinates & the company for project operations Involved in resolving various issues related to drawing, material, work planning, work progress, quality of work and billing against work with the team as well as client & vendors Liaising with designer for drawing, client for necessary work-front & technical clarification and Head Office team for required material to execute the work Coordinating with vendors for their action against supply, sub-contractors for work progress & resolving their issues and subordinates for getting required output from them.
Deputy Manager- Mechanical, 11/2005 to 07/2008
Soma Enterprise LtdCity, STATE,
  • Construction of DAM for Hydro-Electric Project in Subansiri in the Dhemaji District in Assam Role: Oversaw construction of: Steel structures for crushing & screening plants of stone aggregates required for construction of Dam Steel bridge, steel structures for building, overall planning of material, manpower & other resources for the work.
Site Engineer (Mechanical), 01/1998 to 11/2005
North East Engineering & ConstructionCity, STATE,
  • North East Engineering & Construction, Guwahati, Assam as Engineer (Mechanical) Project: Construction of Pipeline, Steel Structure & Oil Storage Tanks at Numaligarh Refinery and Guwahati Refinery in Assam Role: Looked after site and planned, monitored & controlled site activities Updated client on work progress and other technical & commercial issues.
Project Engineer (Mechanical), 01/1996 to 01/1998
Blue Star LtdCity, STATE,
  • Kolkata as Engineer (Mechanical) Project: "Fire Water System" under Engineers India Ltd., Delhi at Numaligarh Refinery Ltd.
  • in Assam Role: Looked after site and planned, monitored & controlled site activities Updated client on work progress and other technical & commercial issues Supervised pipeline fabrication and installation works.
Education
B.E: Mechanical Engineering, Expected in 1995
Jorhat Engineering College Dibrugarh University - Jorhat, Dibrugarh, Assam
GPA:

Mechanical Engineering

Affiliations

Welding Research Institute, Trichy, India

DuPONT CANADA

Venture Gulf Training Center , Doha, Qatar

Additional Information
  • Personal Details Date of Birth: 30th April, 1972 Languages Known: English, Hindi, Assamese and Bengali Passport Details: Passport No.: H5467885; Date of Issue: 28/04/2010; Date of Expiry: 27/04/2020 Driving License Details: GCC Driving License; Date of Issue: 07-04-2011; Valid Up To: 06-04-2016 (Issued by MOI-Qatar)
Skills

MS-Office (Word, PowerPoint & Excel), MS Project, Windows and Internet Applications, AutoCAD (Read & check drawing)

By clicking Build Your Own Now, you agree to our Terms of Use and Privacy Policy

Disclaimer
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

64Fair

Resume Strength

  • Personalization
  • Target Job

Resume Overview

School Attended
  • Jorhat Engineering College Dibrugarh University
Job Titles Held:
  • Senior Estimation Engineer
  • Senior Manager- Structural Steel Fabrication Workshop
  • Workshop Engineer / Project Engineer - steel fabrication
  • Manager- Fabrication
  • Senior Manager- steel fabrication and erection
  • Assistant Manager- Fabrication
  • Deputy Manager- Mechanical
  • Site Engineer (Mechanical)
  • Project Engineer (Mechanical)
Degrees
  • B.E