Livecareer-Resume

General Contractor Resume Example

Love this resume?

By clicking Build Your Own Now, you agree to our Terms of Use and Privacy Policy

Jessica Claire
Montgomery Street, San Francisco, CA 94105
Home: (555) 432-1000 - Cell: - resumesample@example.com - -
Professional Summary

Professional Construction Laborer with excellent interpersonal skills. Works in timely and efficient manner to see tough jobs through to completion.

Skills
  • Labor oversight
  • Project safety
  • Quality control
  • Construction site management
  • Carpentry and flooring skills
  • Interior and exterior renovation
  • OSHA compliance
  • Building, demolition and renovation
  • Equipment maintenance
  • Equipment setup and maintenance
  • Farm equipment operation
  • Forklift trained
Work History
05/2015 to 01/2018
General Contractor Aegion Corp Knoxville, TN,
  • Supervised labor, materials and equipment for large commercial projects with budgets in excess of $[100,000].
  • Monitored supply levels and identified cost-effective materials to reduce project expenses.
  • Determined project schedule, including sequencing all construction activities for optimal efficiency.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Coordinated with site personnel, clients and local government officials to ensure on-time project delivery.
  • Avoided construction delays by efficiently following through with all site inspections.
  • Guided and directed third-party inspectors through project construction, commissioning and closeout.
  • Scheduled utility service providers according to project timelines.
  • Improved process efficiency and workflow by implementing productivity initiatives and proactively identifying and resolving problems.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants and manufacturer's representatives.
  • Reduced process downtime by restructuring ongoing projects, ensuring quality and compliance.
  • Provided safety kits to all construction personnel, fully complying with job site safety protocols.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Conducted routine quality audits to verify progression against specifications and initiated corrective actions to remedy concerns.
  • Kept sites compliant with OSHA, federal, state and local regulations to prevent unnecessary delays.
  • Monitored, coached and supervised team of 3-5 employees from 2015-2018.
05/2014 to 11/2014
Mason Yale University West Haven, CT,
  • Mixed mortar to lay bricks, stones and concrete sidewalks.
  • Installed anchor bolts, steel plates and door sills in freshly poured concrete to provide decorative finish.
  • Applied hardening and sealing compounds to cure surface of concrete and waterproof or restore surfaces.
  • Operated drills, paving breakers and powered abrasive saws to cut or demolish bricks and concrete.
  • Followed blueprints or drawings to lay blocks and bricks in correct arrangement.
  • Molded expansion joints and edges using correct tools.
  • Used rakes and shovels to spread, level and smooth concrete.
  • Removed excess mortar and finished joints for uniform surface.
  • Prepared surfaces for work by smoothing imperfections on ground or with close structures.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Wore correct clothing and protective equipment for jobs.
01/2011 to 01/2014
Handyman 1-800-Sweeper/800Sweeper, Llc Wilsonville, OR,
  • Performed minor wall repair to maintain walls, including installing drywall and repairing and applying wallpaper.
  • Troubleshot and diagnosed problems with mechanical and electrical systems and equipment.
  • Provided facility inspection and maintenance to ensure superior levels of cleanliness and upkeep.
  • Performed basic electrical work and plumbing repairs such as installing new toilets, removing electrical wires, unclogging drains and maintaining gutters.
  • Troubleshot and repaired faulty heating, air conditioning and ventilation systems.
  • Reduced opportunities for theft and trespassers by securing all entrances and exits.
  • Sanitized restrooms using such chemicals as ammonia to reduce spread of germs.
  • Tossed all outdoor debris, including yard clippings into receptacles to properly maintain grounds.
  • Finalized work on building systems by completing basic carpentry and other finish work.
  • Prepared for new painting by removing previous materials with seam-cleaning, sandblasting, scraping and sanding.
  • Cleaned and maintained both interior and exterior of building.
  • Maintained inventory of supplies to complete various repairs on plumbing, lighting or other systems.
  • Removed and repaired carpet and wood flooring.
  • Used various equipment to remove snow and sprinkled rock salt on walkways to prevent falls.
  • Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
  • Properly refurbished furniture and ordered new pieces when needed.
  • Followed all work orders and specifications to determine which machines and equipment required replacement, repair or maintenance.
06/1990 to 01/2011
Auto Mechanic Seaworld Parks Chula Vista, CA,
  • Expertly utilized diagnostic equipment to evaluate mechanical problems in vehicles.
  • Maintained accurate records of time and materials required to perform repairs and service.
  • Produced comprehensive service records of all maintenance and repair tasks for customers.
  • Diagnosed and repaired mechanical issues on diesel.
  • Assembled machines and mechanics according to instructions.
  • Serviced vehicles according to OEM recommended maintenance schedules for oil changes, engine tune-ups and fluid changes.
  • Analyzed and located malfunctions in brakes, motors, switches, and control systems.
  • Maintained functionality and reliability of engines, machines and systems through regular diagnostic checks.
  • Replaced damaged, missing or defective parts with new and refurbished components.
  • Cleaned and maintained proper lubrication for machinery.
  • Ordered repair parts quickly to prevent delays in projects and repair work.
  • Kept equipment in good working order by following operating instructions, troubleshooting breakdowns, maintaining supplies, performing preventive maintenance and calling for repairs.
  • Examined new and replacement parts to uncover defects.
  • Performed diagnostic and troubleshooting procedures to find and identify root causes of mechanical issues.
  • Inspected and tested vehicles and completed preventive maintenance such as engine tune-ups, oil changes, tire rotations, wheel balancing and filter replacement.
  • Performed routine maintenance and repairs using hand and power tools to maximize reliability.
  • Completed full vehicle inspections to check for leaks, damage or other issues of concern.
  • Consulted manuals, technical documentation and repair tree charts for further information prior to conducting fixes.
  • Repaired brake, exhaust, electrical and other systems to optimal specifications.
  • Serviced air conditioning systems, changed and topped off fluids and completed maintenance inspections.
  • Maintained fleet vehicles in good working order with preventive and corrective maintenance expertise.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Repaired wiring, plumbing, equipment, and machinery.
  • Cleared drains and downspouts and cleaned gutters.
  • Manually carried roofing materials up ladders.
  • Completed tear-down of existing structures and prepared for new construction.
  • Used hand tools to change worn cutting tools.
  • Applied caulk, sealants and other agents to installed surfaces.
Education
Expected in 06/1981
High School Diploma:
Boonton High School - Boonton, NJ
GPA:

By clicking Build Your Own Now, you agree to our Terms of Use and Privacy Policy

Disclaimer
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

93Good

Resume Strength

  • Formatting
  • Length
  • Personalization
  • Strong Summary
  • Target Job
  • Typos
  • Word Choice

Resume Overview

School Attended
  • Boonton High School
Job Titles Held:
  • General Contractor
  • Mason
  • Handyman
  • Auto Mechanic
Degrees
  • High School Diploma

Similar Resume

View All
General Contractor
General Contractor
General Contractor