Montgomery Street, San Francisco, CA 94105
Home: (555) 432-1000 - Cell: - resumesample@example.com - -
Plumber driven to provide customer satisfaction at affordable price. Versed in residential and industrial plumbing.
- Materials estimating
- Fall protection
|
- Construction management
- Quality production
|
06/2015 to 09/2020 Foreman,plumber Jet Industries – Bristow, VA,
- Installed and repaired gas lines and hot and cold water lines.
- Installed and replaced water heaters, drain pipes and water supply lines.
- Created and submitted daily reports on progress of all plumbing projects.
- Cut and beveled piping using cutting torches, saws and threading machines.
- Identified and located required tools prior to starting each project.
- Communicated positively with employees, demonstrating high company standards and mitigating issues immediately.
- Coordinated schedules with various construction departments in plumbing works for new and existing buildings.
07/2007 to 09/2016 Foreman, Concrete Finisher Zachry Holdings, Inc. – Saint James, LA,
- Prioritized tasks for each job after reading all project blueprints and documents.
- Mixed and poured concrete according to standard ratios.
- Used numerous types of power tools and other equipment daily.
- Used forklifts and other equipment to move materials and complete project work with construction team.
- Inspected production, quality control and maintenance reports to detect and address production problems.
- Maintained high standards of safety, productivity and quality for every job.
- Developed and administered budgets covering inventory, labor hours and overhead expenses.
- Finished surfaces by troweling, floating and brushing following project requirements and specifications.
- Dismantled forms using [Tool].
- Operated equipment and vehicles, including excavators and loaders to prepare site.
- Recorded supplies, parts, equipment and employee work hours for every job.
- Estimated time, employee needs and material costs for projects.
- Removed debris and waste to clean site after completing work.
- Loaded and unloaded necessary tools, materials and machines from trucks and trailers.
- Delegated duties to each employee based upon his or her skills set and monitored progress daily.
- Constructed forms to create various concrete structures.
- Analyzed job sites daily to mitigate risks for workers and visitors.
- Led worksite preparation and project planning for smoothly run jobs.
- Compacted grade using jumping jack or plate compactor equipment.
- Positioned wire mesh and rebar to reinforce concrete.
- Upheld schedule requirements and quality demands with hands-on project supervision.
- Calculated concrete quantities needed for jobs.
- Poured concrete into forms using pump hose and leveled.
- Improved efficiency [Number]% by minimizing worker downtime and [Action].
- Monitored parts and equipment used at job sites.
- Supervised material usage and contractor hours to keep projects in line with budgets.
- Set up scaffolding, braces and other temporary structures to support crew during work.
- Authored and updated production reports and personnel records for use by senior managers in making accurate operational decisions.
- Reported to supervisors weekly regarding project progress, site problems and labor status.
- Assessed production schedules and orders to plan material requirements and activities of workers.
09/2012 to 07/2015 Concrete Finsher, Carpenter Mongomery Construction – City, STATE,
- Selected lumber based on particular species, characteristics, size, applications and applicable adhesives.
- Shaped materials to exact measurements for job requirements using hand tools and power equipment.
- Built [Type] structure on previously poured foundation.
- Used forklifts and other equipment to move materials and complete project work with construction team.
- Constructed custom wall storage units for residential home office areas with [Number]% customer satisfaction.
- Protected flooring installations by covering subfloors with [Type] material to prevent moisture buildup.
- Laid and repaired concrete to make level and long-lasting surfaces.
- Cut and installed tile and hardwood flooring for over [Number] residential and commercial buildings.
- Mixed and poured concrete according to standard ratios.
- Calculated accurate material estimates to create quotes for clients with [Number]% accuracy.
- Set windows and layouts for stairs and common rafters.
- Poured concrete into forms using pump hose and leveled.
- Compacted grade using jumping jack or plate compactor equipment.
- Framed new construction of single-family homes and townhomes.
- Installed floor joists, trusses and rafters.
- Positioned wire mesh and rebar to reinforce concrete.
- Ordered materials and made material stock recommendations.
- Safely used band, circular, jig, reciprocating, chop and compound miter saws.
- Operated terrain telescoping forklift, backhoe, skid steer and tractor.
- Reviewed blueprints and other drawings to identify correct grades.
- Removed debris and waste to clean site after completing work.
- Planned work based on blueprints and individual project specifications.
- Operated equipment and vehicles, including excavators and loaders to prepare site.
Expected in 05/2005 Associate of Science: Fire Science
Utah Valley University - Orem, UT
GPA:
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
How this resume score
could be improved?
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:
- Formatting
- Measurable Results
- Personalization
- Target Job
- Typos