Enthusiastic Job Title eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of Task and Task and training in Skill. Motivated to learn, grow and excel in Industry.
|
|
Secured new or existing tack strips around flooring space to attach edges of new carpet.
Recorded measurements and devised plans to match installation specifications.
Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
Used Tool and Tool to provide accurate measurements and estimates for projects.
Pressed carpet into place over tack strips or utilized staples, tape, tacks or glue to secure carpet.
Installed sheeting on floor surfaces by applying adhesive and rolling with Type tool to form smoothest finish.
Spread adhesive cement over floor to prevent boardjoint wearing.
Swept, scraped and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
Maintained excellent communication, cleanliness and safety standards on work sites and projects, boosting customer satisfaction ratings Number%.
Assessed high-traffic areas and planned flooring layout and seam placement to suit expected traffic patterns.
Fastened metal treads across door openings or other divisions to secure carpet.
Performed preventive maintenance on already fitted tiles to guarantee longevity, including Type and Type preventive maintenance.
Secured carpets in place by fastening metal treads across door openings.
Used tape, glue and heated carpet irons to join edges of carpet.
Measured, cut and installed tack-free strips along baseboards or walls.
Followed floor sketches and verified extra allowances for final fitting.
Removed existing flooring to prepare Type and Type floor surfaces for new flooring.
Formed tight and secure joints by removing excess materials and connecting individual pieces.
Used compounds to waterproof areas, fill in cracks or produce special effects based on project demands.
Read and interpreted project specifications to properly prepare and install shock-absorbing, sound-deadening and decorative materials.
Unrolled, positioned and pressed Type coverings onto cement bases to create final surfaces.
Readied surfaces to accept coverings by sweeping away materials, correcting flows and applying special treatments.
Operated hand tools and machines to cut material and achieve proper fit around obstructions.
Installed Type and Type materials over support structures to form smooth subfloors for final coverings.
Conducted thorough inspections of installation areas to check for adequate supports and any moisture concerns.
Worked with different adhesives to join foundation, flooring and wall materials.
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
School Attended
Job Titles Held:
Degrees
© 2021, Bold Limited. All rights reserved.