LiveCareer-Resume

Flooring Installer resume example with 20+ years of experience

JC
Jessica Claire
, , 100 Montgomery St. 10th Floor (555) 432-1000, resumesample@example.com
Summary

Results-driven Supervisor with experience steering and directing all aspects of operations. Practiced in orchestrating multiple projects with competing priorities involving process improvements, safety initiatives and quality control. Recognized and commended for collaborating with upper management to achieve organizational objectives. Versatile Supervisor with advanced personnel and inventory management experience. Maintains professional environments and takes lead in development of subordinates to create success. Polished in delivering comprehensive reports to facilitate site-wide improvements and continuity. Focused Supervisor brings strong background in policy and safety procedure development, implementation and enforcement. Quality-driven leader leveraging exceptional employee training and development capabilities. Brings 42 years of comprehensive experience supporting business leadership.

Skills
  • Excellent Work Ethic
  • Attentive to Detail
  • Reliable and Consistent
  • Strong Organization Skills
  • Safety Protocol Knowledge
  • Concise Time Management
  • Confident and Positive Attitude
  • Task Delegation
  • Tile, Hardwood, Carpet, LVT, Sheet Vinyl and Laminate
  • Maintenance & Repair
  • Training & Development
  • Active Listening
  • Supervision & Leadership
  • Team Building
  • First Aid/CPR
  • Critical Thinking
  • Problem Resolution
  • Friendly, Positive Attitude
  • Team Management
  • PPE Use
  • Customer Service
  • Conflict Resolution
  • Basic Math
  • Flexible Schedule
  • People Skills
  • Planning & Organizing
Experience
05/2016 to 06/2022 Flooring Installer 50 Floor | Orlando, FL,
  • Evaluated work areas before planning flooring layout for different projects.
  • Calculated floor area and estimated required materials before carpeting.
  • Repaired diverse flooring types using tools and equipment.
  • Installed quality floorings at client sites and followed set customer service standards during installation process.
  • Measured, marked and cut carpeting to size with hand-held and powered tools.
  • Trimmed and installed padding to specified dimensions to meet client requirements.
  • Used hand and power tools to install hardwood, vinyl, laminate and other types of flooring.
  • Educated clients on best methods and products to clean new flooring.
  • Removed existing flooring and discarded old material.
  • Inspected floor surface, assessed conditions and corrected potential imperfections affecting carpet and flooring installations.
  • Cut flooring material to fit around obstructions using hand tools, dies and special equipment.
  • Formed smooth flooring foundations by installing plywood or Masonite over support structures.
  • Prepared base surfaces by removing debris, correcting imperfections and applying treatments.
  • Rolled and pressed sheet wall and floor coverings onto cement bases to produce smooth and finished surfaces.
  • Removed excess cement and flooring materials to form tight joints and attractive finishes.
  • Applied waterproofing compounds and filled cracks with materials such as plaster, putty or grouting.
  • Evaluated sites to determine traffic patterns and select optimal seam locations.
  • Inspected surface to be covered to verify adequate support structures and dryness.
  • Installed shock-absorbing, sound-deadening or decorative coverings to floors, walls and cabinets with strict adherence to project specifications in order to meet design objectives.
  • Applied adhesive materials to flooring and wall materials to join foundation material.
05/2010 to 05/2016 Construction Foreman Weaver Consultants Group | Columbia, MO,
  • Supervised subcontractor progress and coordinated project meetings to discuss milestones and timelines.
  • Maintained quality standards and monitored work for corrective action.
  • Created weekly schedules and daily workflows to support adequate project coverage.
  • Communicated effectively with customers and workers alike, answering inquiries and questions and responding to complaints.
  • Inspected, serviced and repaired equipment to maintain functionality and project timelines.
  • Estimated time, employee expenses and material costs for projects.
  • Assisted electrical, plumbing and carpentry teams by completing basic and semi-skilled work.
  • Efficiently recorded and rejected incorrect deliveries of material to site.
  • Assessed usage of equipment by crews to prevent accidents, damage and safety violations.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Kept track of supplies and materials to prevent inventory losses.
  • Led weekly status meetings and reviewed daily staff reporting.
  • Performed work safely and effectively in high and precarious places.
  • Performed lock-out-tag-out procedures on equipment prior to service work to promote workplace safety.
  • Assigned projects and tasks to employees based on competencies and specialties.
  • Tracked material usage and contractor hours to align projects with budgets.
  • Oversaw plumbing, heating, ventilation and irrigation system projects, which included construction, maintenance and repair work.
  • Managed daily work assignments by delegating tasks and monitoring progress.
  • Facilitated construction team training on site-specific project specifications.
05/2006 to 05/2010 Walk in Bathtub Installer 50 Floor | Richmond, VA,
  • Performed pipe fabrication, installation and fitting according to proper specifications.
  • Prepared project bids and gathered parts, labor and equipment needed for projects.
  • Hoisted loads using slings, chains, shackles, hooks, cables and other rigging equipment.
  • Tested piping systems with water and air pressure to maintain balance and accuracy.
  • Identified and located required tools prior to starting each project.
  • Operated equipment and remained focused on safety at all times.
  • Coordinated schedules with various construction departments in plumbing works for new and existing buildings.
  • Installed and replaced water heaters, drain pipes and water supply lines.
  • Completed walk-throughs of completed systems to verify code adherence.
  • Supervised staff and evaluated work performance.
  • Followed relevant codes, regulations and safety techniques.
  • Cut and fit pipes to established measurements.
  • Cut and beveled piping using cutting torches, saws and threading machines.
  • Studied blueprints and inspected structures to assess material and equipment needs, pipe installation sequence and installation around possible obstructions.
  • Installed and repaired gas lines and hot and cold water lines.
05/1996 to 05/2004 Flooring Installer 50 Floor | Valley View, OH,
  • Evaluated work areas before planning flooring layout for different projects.
  • Calculated floor area and estimated required materials before carpeting.
  • Repaired diverse flooring types using tools and equipment.
  • Installed quality floorings at client sites and followed set customer service standards during installation process.
  • Measured, marked and cut carpeting to size with hand-held and powered tools.
  • Used adhesive to join seam edges together.
  • Trimmed and installed padding to specified dimensions to meet client requirements.
  • Used hand and power tools to install hardwood, vinyl, laminate and other types of flooring.
  • Educated clients on best methods and products to clean new flooring.
  • Removed existing flooring and discarded old material.
  • Inspected floor surface, assessed conditions and corrected potential imperfections affecting carpet and flooring installations.
  • Cut flooring material to fit around obstructions using hand tools, dies and special equipment.
  • Formed smooth flooring foundations by installing plywood or Masonite over support structures.
  • Prepared base surfaces by removing debris, correcting imperfections and applying treatments.
04/1993 to 04/1996 Flooring Installer Rain For Rent | Greeley, CO,
  • Evaluated work areas before planning flooring layout for different projects.
  • Calculated floor area and estimated required materials before carpeting.
  • Repaired diverse flooring types using tools and equipment.
  • Installed quality floorings at client sites and followed set customer service standards during installation process.
  • Measured, marked and cut carpeting to size with hand-held and powered tools.
  • Cut and trimmed flooring to suit specified areas before installation.
  • Used adhesive to join seam edges together.
  • Trimmed and installed padding to specified dimensions to meet client requirements.
  • Used hand and power tools to install hardwood, vinyl, laminate and other types of flooring.
  • Educated clients on best methods and products to clean new flooring.
  • Inspected floor surface, assessed conditions and corrected potential imperfections affecting carpet and flooring installations.
  • Cut flooring material to fit around obstructions using hand tools, dies and special equipment.
  • Formed smooth flooring foundations by installing plywood or Masonite over support structures.
  • Rolled and pressed sheet wall and floor coverings onto cement bases to produce smooth and finished surfaces.
  • Removed excess cement and flooring materials to form tight joints and attractive finishes.
  • Applied waterproofing compounds and filled cracks with materials such as plaster, putty or grouting.
  • Evaluated sites to determine traffic patterns and select optimal seam locations.
  • Inspected surface to be covered to verify adequate support structures and dryness.
  • Installed shock-absorbing, sound-deadening or decorative coverings to floors, walls and cabinets with strict adherence to project specifications in order to meet design objectives.
  • Applied adhesive materials to flooring and wall materials to join foundation material.
03/1985 to 03/1993 Installer S & G Siding And Window | City, STATE,
  • Maintained inventory of supplies, materials and tools to complete work on job sites.
  • Applied precut siding and manually cut material to size and shape at work sites.
  • Cut and trimmed material to shape to fit around windows and corners.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Worked productively as lead or helping team member and drove customer satisfaction.
  • Applied knowledge of carpentry and general construction to finish work.
  • Completed scheduled appointments on time to drive quality service.
  • Replaced defective siding components and securely connected new items to existing structures.
  • Conducted site surveys prior to installation to take measurements and determine needed materials for project completion.
  • Loaded and unloaded ladders, walk boards, latter jacks and other large tools and equipment to prepare for job tasks.
  • Used screws and nails to fasten wood or metal laths to surfaces.
Education and Training
Expected in 05/1984 High School Diploma | Ritenour Sr. High School, St Louis, MO GPA:
Certifications
  • osha 10 Training - 2005
  • osha 30 Training - 2016
  • home inspection Training - 2006

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Ritenour Sr. High School

Job Titles Held:

  • Flooring Installer
  • Construction Foreman
  • Walk in Bathtub Installer
  • Flooring Installer
  • Flooring Installer
  • Installer

Degrees

  • High School Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: