LiveCareer-Resume

academic projects resume example with 3+ years of experience

Jessica
Claire
resumesample@example.com
(555) 432-1000,
Montgomery Street, San Francisco, CA 94105
:
Summary
Pursuing Automotive System Engineering from University of Michigan Dearborn. *Highly motivated person who believes in team work. *Keen interest in automotive field, looking forward to work with a big automotive giant.
Highlights
  • Guest services
  • Inventory control procedures
  • Merchandising expertise
  • Loss prevention
  • Cash register operations
  • Product promotions
Education
University of Michigan , Expected in Dec' 2016 M. S : Automotive Systems Engineering - GPA : Automotive Systems Engineering
, Expected in Auto Assembly Systems *Automotive Manufacturing Process Internal Combustion Engines *Automotive: An Integrated Process FEM in Auto Structure Design *Actuators and Sensors Active Automotive Safety Systems *Energy Storage Systems Project Management & Control GLA Institute of Technology and Management, Mathura (UP) : - GPA :
, Expected in June, 2011 Bachelor of Technology : Mechanical Engineering - GPA : GPA: 64.66 Mechanical Engineering GPA: 64.66
Experience
Abbott Laboratories - ACADEMIC PROJECTS
, , 01/1 -
  • Optimization of Naturally Aspirated and Downsized Turbocharged PFI SI-Engine for Knocking Characteristics" The model was based on MATLAB Simulink and it simulates single cylinder combustion of PFI SI-engine.
  • Change in knocking tendency and MBT (Minimum Advance for Best Torque) timings were determined by varying the engine parameters such as spark timing, EGR rate and Compression Ratio for both Naturally Aspirated and Downsized Turbocharged engines.
  • The extracted data were compared and parameters for the best engine performance was determined.
  • Active Automotive Safety Systems: (July'15) Simulation of Airbag deployment using LS Dyna" Designing of an airbag first in LS Dyna, then using the basic keyword "AIRBAG_SIMPLE_AIRBAG_MODEL", also understanding the kind of material used and the keyword for the same.
  • Then using Pre Solver and Post solver for Simulation of the said airbag.
  • Analyzing the simulated results, understanding the major constraints and challenges in real environment.
  • How the deployment time could be reduced and what effects it.
  • Automotive: An Integrated Process (Sep'15) Benchmarking and Preliminary Design Specification" Benchmarking study of competitor vehicles with the reference vehicle (Chrysler 200 LX)for the project work New specifications for the Target Vehicle, implementing new features and technologies for the target vehicle in year 2021 Pugh diagram showing comparison between target and benchmarked vehicles.
  • Understanding the customer needs and requirements and implementing the same in target vehicle.
  • QFD, Interface Matrix and Cascading Requirements" (Oct'15) To Study the development of new product specification on the basis of consumer demands with the help of tool known as QFD (Quality Function Deployment).
  • To understand automotive systems, subsystems, interfaces between systems and their requirements To cascade vehicle attributes and sub-attributes to system and sub-system requirements Co-ordination in system design tasks between different design and engineering activities and issues associated with Trade-offs Business Plan Development of Chrysler 200 2021 model" (Nov'15) To present the Business Plan for the 2021 Chrysler 200 development program Conceptual Design of the Proposed Vehicle and Technology Plan of 2021 Chrysler 200" (Dec'15) Search for additional information from benchmarking and trends in design and technologies and refine your vehicle definition Illustrate vehicle configuration and preliminary packaging with key interior and exterior dimensions and details of the vehicle concept Present a technology plan for selected technologies and features Automotive Manufacturing Process (Dec'15) Selection of Alternative Materials and Processing Techniques for Automotive Exhaust System Components " The project aimed at studying and substituting new material and manufacturing processes for traditional exhaust system components.
  • Worked under substituting the current material & manufacturing process used in the industry for making tail pipes.
  • Substituted the current material and used aluminized 409 and 439 Steels.
  • Automotive Assembly Systems (April'16) This project focused on applying DFA principles to the "Driver Seat" assembly line for designing an optimum and efficient assembly line.
  • By exploring the current production methodologies and collecting data from the existing system we evaluated the efficiency of the assembly line.
  • Furthermore, it is observed that there is scope of improvement for assembly time of Driver Seat, which can be achieved by applying Design of Assembly principles.
  • The project implements the Boothroyd Dewhurst principles of assembly, Kilbridge and Wester Method of Line Balancing to obtain optimum time and cost.
Circle K Stores, Inc. - Procurement Specialist
, , 01/1 - 01/1
  • Took the course Active Automotive Safety Systems and worked on simulation of Airbag model using a default model in the LS Dyna.
  • Learnt about Automotive Integration, and worked on Projects: Benchmarking and Preliminary Design Specification, QFD, Interface Matrix and Cascading Requirements, Business Plan Development of Chrysler 200 2021 model and Conceptual Design of the Proposed Vehicle and Technology Plan of 2021 Chrysler 200.
  • In Automotive manufacturing worked on the project Selection of Alternative Materials and Processing Techniques for Automotive Exhaust System Components.
  • In Automotive Assembly Systems worked on the project Analysis and Design of assembly line for driver seat.
  • The work experience accounts for the experience in Procurement and Supply Chain Management for a duration of 3.5 years in two different industry types.
  • Worked extensively with project sites and subsidiaries throughout my work.
  • Worked on SAP MM Module as a Super User with almost every knowledge as an end user.
  • Worked with vendors, for vendor management, and also negotiated on a great scale for orders.
  • Worked in two different sector of industries in Supply Chain , utilizing industries widely used ERP's SAP and Microsoft Navision Dynamics.
Oriental Structural Engineers Pvt. Limited - Assistant Manager
City, , 08/2011 - 01/1
  • SAP Version ECC 6.0 Procurement: All the procurement machinery related to Capex such as Crusher, Graders, Concrete Plants, and Tipper, Loaders etc.
  • Procurement of other tools and machinery needed for Plant and Machinery.
  • Procurement of IT related products at Head office.
  • Making PCC (Price Comparison Charts) and negotiating with the suppliers.
  • Maintaining Vendor database and working for Vendor Management.
  • Maintaining rate contracts annually or Half Year with the Vendors.
  • Coordinating with the end user at the sites for deliveries and also keeping track with the suppliers.
  • Maintaining monthly database of the procurement and planning of future material requirements Also experience of the department with varied kind of material purchase such as Steel, Oil and other building materials.
  • Strong negotiation skills for the cost saving.
- SAP MM Super User Coordinator
, , -
  • Interacting with Cross function team and helping them by clarifying their day to day doubts in SAP system Attending Service Desk issues and to provide L1 support to end users Preparing and imparting training on SAP MM, modules to cross function, Internal IT and new joiners.
  • Review the training needs of end users, prepare training plan, and coordinate with User department to implement/impart.
  • Understand new developments in system & update respective users about the change.
  • Interact with SAP L2 team on all technical requirements of the system.
  • Testing the system when a new process introduced and any process change attempted.
  • Handling issues related to integration of other Modules.(FI , CO & PP) Working for new sites (Projects) and implementing SIT's (System Integration Testing) for errors and developing new system for report generation (MIS) which are not auto generated , with more innovation and strategy.
Affiliations
Skills
Automotive, basic, Benchmarking, Business Plan, Business Plan Development, Charts, concept, Conceptual Design, contracts, database, Dec, Designing, dimensions, engineering activities, ERP, features, innovation, Machinery, Managing, Manufacturing Process, manufacturing processes, Materials, MATLAB, office, PP, MIS, Navision, negotiating, negotiation, Oct, Oil, Optimization, packaging, Procurement, project Analysis and Design, Project Management, Quality, reporting, Safety, SAP MM, SAP, Simulation, Specification, strategy, Supply Chain, Supply Chain Management, system design, System Integration, Vendor Management
Additional Information
  • AWARDS AND SKILLS University of Michigan- Dearborn's Non -Resident Graduate Tuition Scholarship Programming Skill: Basic knowledge of C,C++ and Java Operating System: Windows Seven/8/10, LINUX Design Software's: Auto Cad ,Catia V5 and basic knowledge of HYPERMESH and LS Dyna Basic knowledge of MATLAB. Languages: English, Hindi and German (A1 and A2- Goethe Institute, Max Mueller Bhavan, New Delhi -India.

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • University of Michigan

Job Titles Held:

  • ACADEMIC PROJECTS
  • Procurement Specialist
  • Assistant Manager
  • SAP MM Super User Coordinator

Degrees

  • M. S
  • Auto Assembly Systems *Automotive Manufacturing Process Internal Combustion Engines *Automotive: An Integrated Process FEM in Auto Structure Design *Actuators and Sensors Active Automotive Safety Systems *Energy Storage Systems Project Management & Control GLA Institute of Technology and Management, Mathura (UP)
  • Bachelor of Technology

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: