Professional Summary

Senior Electrical Designer with over 39 years of experience in electrical design and instrumentation systems including offshore as well as onshore grass root projects in petrochemical, polymers, cryogenic, and power generation. Instrumental in completing many control systems up-grade projects in various refineries in the Gulf Coast region including hot cutover experience. I also have considerable field experience including contract coordination, technical assistance, QAQC, mechanical completion walk-downs and support of start-up commissioning activities and related procurement activities

Skills
  • MS Office
  • Basic math
  • Customer service
  • [Type] software proficiency
  • Organization and Time management
  • Responsible
  • Written Communication
  • Multitasking abilities
  • Self-motivated professional
  • Collaboration
  • Microsoft Office
  • Analytical skills
Education
North Harris County College , Expected in 04/1980 Associate of Science : General Studies - GPA :
Work History
Ariens - Senior Electrical Designer
Manitowoc, WI, 01/2020 - 04/2021

Husky Superior Refinery Rebuild Project

Superior, Wisconsin

Assist in developing the scope of work to replace the Crude Unit and partial FCC Unit in the Refinery. Provide and install PDC - Power Distribution Centre building to feed the Crude, FCC, OSBL and miscellaneous loads for other existing units in the overall plant. Develop installation details for power and control and grounding. Work with remote engineering office personnel to develop underground and above ground grounding plan drawing construction work packages. Develop motor schematic and wiring diagram drawing templates. Assist in developing Area Classification Plans for the Crude, FCCU and OSBL areas of the plant.

Ariens - Senior Electrical Designer
Oshkosh, WI, 01/2010 - 01/2019

2019 - 2019 Lotus Project – EOEG Production Unit, Shell, Senior Electrical Designer, Geismer. Lousiana

For short duration on the project, assisted in developing equipment arrangement plan for the Power Distribution Center building. Developed preliminary area classification plan drawing.

2018 - 2019 Zeus – HRPIB Highly Reactive Poly Isobutylene Production Unit, Lubrizol, Senior Electrical Designer, Deer Park, Texas

In the early stages of construction, provided assistance to planners to build construction work packages. Subsequently provided construction support for instrument and electrical disciplines answering any requests for Information. Provided oversight for any instrument and electrical material purchases which helped to minimize surplus material at mechanical completion. Provided assistance to test and commission the Profibus motor control system network. Coordinated with third party vendors to correct controls issues with various packaged equipment. Coordinated with and monitored subcontractors for heat tracing, security access, CCTV and electrical distribution equipment testing and commissioning. Assisted QAQC personnel for electrical and instrument installations. Performed systems completion walk-downs and participated in loop cClaires to accomplish final sign-off for mechanical completion.

2015 - 2018 Zeus – HRPIB Highly Reactive Poly Isobutylene Production Unit, Lubrizol, Senior Electrical Designer, Deer Park, Texas

Detailed engineering and design for EPCM contract to install a brown field HRPIB unit. Electrical work included two PDC (Power Distribution Center Buildings) for the new unit. Profibus and Modbus Networks to accomplish motor control and monitoring of switchgear protective relays. Specialty systems included security access and CCTV systems and limited although long run electrical heat tracing for inter plant product piping runs. Developed PIP based installation detail for grounding, power and control, lighting, cable tray and instrumentation that were to be used as the standard moving forward for the Lubrizol Deer park facility. Coordinated with multi-project execution team to complete and provide final cClaireing for all the engineering and design deliverables including grounding, lighting, cable tray, power and control and instrument plans as well as one-lines and schematic and wiring diagrams.

2014 - 2015 W. P. Water Treatment Electrical Power Distribution Improvement, Valero, Senior Electrical Designer, Corpus Christi, Texas

Tasked with developing engineering and design deliverables to install new tilt wall, built on site switchgear building including double ended 15kv switchgear and 480V switchgear to provide power to existing MCC’s in adjacent building. Scope included re-work of upstream 15kv underground power distribution feeders from other areas of the plant and to serve the new switchgear building.

2014 – 2014 Flare Gas Recovery and PDC-31, BP, Senior Electrical Designer, Whiting, India

Flare and related equipment installation in five existing process unit area. Scope included installation of a new power distribution center building and remote I/O building. The main intent of the project to achieve regulatory compliance. Tasked mainly with cClaireing out-sourced electrical deliverables including lighting, power, instrumentation and heat tracing drawings as well as interconnect wiring and schematic diagram drawings.

2013 – 2014 Multiple Gathering and Treating facilities Eagle Ford Shell Play, BHP Billiton, Senior Electrical Designer, Eagle Ford Shell Play, Texas

Seconded to BHP Billiton to inspect and report on multiple existing facilities throughout the Eagle Ford Shell Play for compliance to industry codes and standards. After inspection and follow up report completion, provided coordination and supervision to electrical contractor to make the needed corrective actions. At one facility, this included demo of existing starters, feeder breakers and variable speed drives and replacement with explosion proof equipment to meet the area classification for three existing local switch racks. This was done without requiring replacement of existing underground power and control cabling to the users. Work included specifying and directing contractor for procurement of replacement equipment. Designed and directed the installation of new underground duct back and switch rack to feed new thermal oxidizer and new flare installation.

2012 – 2013 Eagle Hawk and Black Hawk Central Gathering, Treating and Distribution Facilities, BHP Billiton, Senior Electrical Designer, Eagle Ford Shell Play, Texas

Responsible for engineering and design deliverables for the expansion of an existing central distribution facility and separate site grass roots central distribution facility. This included review of vendor drawings for main line compressors and Amine Treating Units. Developed area classification, grounding, lighting, power, instrument and cable tray drawings as well as interconnect wiring and schematic diagrams.

2011 – 2012 Bennet Ranch Re-Injection Compressor Facility, Oxy, Senior Electrical Designer, Post, Texas

Responsible for the design and development of associated power distribution deliverables including one lines, schematic and interconnect wiring drawings. The system included a combined power distribution and control room with 15kv double ended switchgear and double ended 480V switchgear with close coupled motor control centers. Held and integral position in the coordination and design of the interconnecting wiring to the separate high voltage relay panels and the associated interconnect wiring to the upstream 138kv switchyard as well as the upstream utility provided 138kv substation. Provided on-site construction coordination and cClaire-out assistance and performed process system safety review walk-down and documentation for Mechanical, Piping, Instrumentation and Electrical.

2010 – 2011 Mobil Bay Onshore Treating Facility, Exxon Mobil, Senior Electrical Designer, Theodore, Alabama

Associated with the installation of two medium voltage combustion air blowers and related auxiliary utility loads, responsible for producing the interconnect wiring diagrams, schematics, plan drawings, and installation detail drawings. Also tasked with cClaireing the balance of plant associated work.

Ariens - Senior Electrical Designer
Kenosha, WI, 01/2005 - 01/2009

2008 – 2009 LNG Receiving Terminal, Sempra Global Energy, Senior Electrical Designer, Hackberry, Louisiana

Assigned to the construction site to provide technical support to construction of grass roots LNG Terminal with three LNG tanks, two ship unloading docks, six train submerged combustion gasification units, connection to pipeline, control / office building, PDC building and tie-in to utility provided 69kV Substation. Provided oversight for testing and commissioning of the PDC building by third party contractor. Assisted construction management with oversight of I&E Subcontractor. Was instrumental in completing the design of the main power-house controls and interlocks as well as the standby generator transfer scheme. Provided assistance to commissioning to trouble shoot various packaged equipment issues and coordinated with vendors as necessary for resolution. Maintained as-built drawings for final systems turn-over.

2006 – 2008 Adriatic LNG Receiving Terminal, Exxon Mobil, Senior Electrical Designer, Venice, Italy

Project to install gravity-based LNG terminal in the Adriatic Sea off-shore Venice Italy, responsible for design associated with the various utility packaged equipment including three Nuovo Pignone gas turbine generators and one diesel generator. Other utility packages included plant and instrument air and Nitrogen packages. Mainly responsible for producing interconnect wiring drawings, schematics. Assisted with review of all powerhouse distribution equipment vendor drawings including high, medium and low voltage equipment as well as UPS and specialty offshore systems.

2005 – 2006 Magnolia Power Station, Magnolia Power, Senior Electrical Designer, Los Angeles, California

Assigned to construction site to assist construction management to provide support and over-sight to I&E contractor to achieve mechanical completion on schedule for combined cycle gas and steam turbine generators, heat recovery and water treatment units. Provided assistance to commissioning group to achieve start-up. Maintained and provided as-built drawings. Coordinated purchasing for any broken and or missing components. Was successful with the oversight of the I&E contractor to achieve the mechanical completion date.

2005 – 2005 Sable Island Compression Platform, Chevron, Senior Electrical Designer, Nova Scotia

Assigned with completing the design deliverables associated with the navigation aid package. Also responsible with review of the various packaged equipment vendor drawings and completing the related interconnect wiring and schematic diagram drawings.

Ariens - Senior Electrical Designer
Milwaukee, WI, 01/1995 - 01/2005

2004 – 2005 Thailand Copper Project, Thailand Copper, Senior Electrical Designer, Rayong, Thailand

Assigned to the construction site to achieve mechanical completion and pre-commissioning of copper smelter and refining unit. Tasked with reviewing and completing design deliverables, coordinate the I&E contractor and complete systems walk-downs and perform loop cClaire-out. Assisted commissioning and start-up group to refurbish and trouble shoot packaged equipment control systems and provide purchasing assistance for needed components and materials. Provided as-built documentation for turn-over systems packages. Reviewed packaged equipment vendor data available and completed the related interconnect wiring diagrams. Worked with direct hired I&E personnel to complete the installation / systems on schedule that were the responsibility of the main I&E contractor as systems walk-downs had revealed the work to date was significantly behind schedule.

2002 – 2004 Distrigas LNG Vaporization Plant Re-vamp Project, Distrigas, Senior Electrical Designer, Boston, Massachusetts

Assigned as the lead designer for the instrument and electrical design scope, which included the retrofit of larger in tank pumps to existing LNG tanks, two booster pump modules and four submerged combustion vaporizers to be added to the facility to boost capacity. Additional added scope included the installation of a new substation and related refurbishment of the existing substation to improve reliability of the plant power distribution system.

2000 – 2002 Alcoa Alliance Agreement, Alcoa, Senior Electrical Designer, Multiple Alcoa Aluminum Facilities

Assigned as the lead designer various small-caps electrical and instrument projects related to improvement of reliability of existing installations. Gained valuable experience completing turbine control and generator excitation systems upgrade projects on existing installations. Ultimately assigned to provide on-site I&E design services at the St. Croix, USVI facility coordinating the instrument and electrical maintenance departments. Successfully refurbished existing underground power distribution to restore redundant power feeds to various power distribution buildings around the site.

1999 – 2000 BPA Project, Bayer, Senior Electrical Designer, Baytown, Texas

Assigned as instrument and electrical lead designer for grass root BPA facility EPC project. Upon completion of detailed engineering and procurement phase was assigned to the construction site to provide technical assistance and maintain as built documentation for systems turn over packages.

1998 – 1999 EB1 Project, Lyondell, Senior Electrical Designer, Channelview, Texas

Assigned as electrical lead designer for grass root Ethyl Benzene Unit at Lyondell’s Channelview plant. Provided oversite and review of all design deliverables created by India office. Did material take-off and related purchasing activities for bulk materials. Followed the engineering phase to the construction site to provide technical assistance, maintain as-built documentation and assist in systems turnover packages.

1997 – 1998 Vespa Polyethylene Unit, Akzo, Senior Electrical Designer, Channelview, Texas

Assigned responsibility for the design and deliverables associated with the new 15kV distribution system to various units in the overall existing plant. Also responsible for design deliverables for the lighting of the new Vespa Plant as well as motor control schematics and wiring diagrams as well as packaged equipment interconnect wiring diagrams.

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Disclaimer

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score
could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

72Average

resume Strength

  • Length
  • Personalization
  • Target Job

Resume Overview

School Attended

  • North Harris County College

Job Titles Held:

  • Senior Electrical Designer
  • Senior Electrical Designer
  • Senior Electrical Designer
  • Senior Electrical Designer

Degrees

  • Associate of Science

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in: