- Daily communication with clients about projects that they wanted completed.
- Create estimates and take offs for projects using the Wave Program.
- Planned daily duties and goals for my crews to completed to stay on track with schedule to complete projects.
- Gather equipment to be used daily on projects (loading, serviceability of tools, and accountability of tools.
- Maintained vehicle and trailer maintenance daily.
- Planning on how much materials needed for projects and picked up materials for projects.
- Successfully led key projects which resulted in referral and more work.
- Also great with my hands. know how to handle power tools and hand tools to complete any project.
- Completed over 100 projects interior and exterior and commercial buildings with 100% satisfactory.
2016-2020
Performed field repair and maintenance through a contractor periodically.
- Interior and exterior Wall painting and drywall installation/ repair.
- Replacing and installation of floors (wood, laminate, tile).
- Door and window installation and adjustments.
- Bathroom remodeling and maintenance ( installation of toilets, sinks, showers, etc ).
- Ceiling work ( replacing ceiling tile, adding ceiling lighting as well as ceiling fans.
- Assembly of furniture and office equipment.
January 2020
Residential Interior Paint job.
- Prep area for paint.
- Repaired any defects on drywall, filled nails holes, and caulked all gaps between wall and baseboards.
- Cut in at ceiling and baseboards, and rolled all interior walls in house.
- Painted all doors, door frames, trim, and baseboards.
December 2019-January 2020
Layout and performed total construction carpentry including site demolition, flooring, wall, ceiling in commercial building.
- Demoed existing walls ,ceiling grid and tiles, and metal and wood doors and door frames.
- Established new take off for walls and doors.
- Built metal stud walls and installed drywall. install metal door frames and wood doors.
- Taped and floated new drywall, sanded and painted walls.
- Painted doors and door frames.
- Measure, cut, and install ceiling tile.
- Measure, leveled, and secured sink vanities and kitchen cabinets.
- Install sink faucets and bathroom faucets.
December 2019
Remodel bathroom to meet ADA regulation for Handicap
- Demoed and gutted existing bathroom.
- Redid floor joist because they where rotted out.
- Installed new subfloor
- Installed new floor pan, tiled up walls, installed grab bars and seat, installed all new plumbing and fixtures, and shower doors.
- Install new taller toilet
- Install new vinyl flooring
- Install new sink vanity , sink countertop and new plumbing and faucet.
- Install new mirror and light fixtures. Install new heat and ventilation box, wired to switch and ducted to exterior of house.
- Tape and floated drywall and painted wall, trim and door.
January 2018-June 2018
Performed total construction carpentry in multiple offices in medical building.
- Demoed walls, ceiling systems, doors, and flooring.
- Performed new takeoffs per blueprint design.
- Built walls, installed doors, ceiling systems, door closure, panic devices, folding doors, millwork, flooring.