LiveCareer-Resume

master scheduler utility coordinator swppp manager resume example with 20+ years of experience

Jessica Claire
  • , , 609 Johnson Ave., 49204, Tulsa, OK 100 Montgomery St. 10th Floor
  • H: (555) 432-1000
  • C:
  • resumesample@example.com
  • Date of Birth:
  • India:
  • :
  • single:
Summary

Offering excellent project management, multi-tasking and communication skills to coordinate multiple, concurrent projects with competing demands of construction, quality control, and changing Stormwater, Hazardous Materials, Underground Storage Tank, CERS / CUPA, and federal and local requirements. Ability to make sound decisions in high-pressure settings and utilize analytical problem-solving skills to troubleshoot and resolve issues. Articulate communicator.

Experience
Stormwater / Haz Mat / CERS/ CUPA Manager, 10/2020 - Current
Mckesson Corporation Usa, ID,
  • Trained foreman to be Certified "Qualified Stormwater Practitioners".
  • Maintain Haz Mat information on CERS / CUPA.
  • Insure Haz Mat program is in compliance.
  • Maintain Underground Storage Tanks / Certifications / Testing / Inspections.
  • Coordinate with County environmental, Stormwater, Corona Fire, Calfire, Haz Mat, and UST inspectors.
  • Obtain Stormwater permit(s) as needed for industrial sites.
  • Insure SWPPPs, WPCPs, and WPMPs are prepared, approved, implemented, and terminated corresponding to the site conditions.
  • Train field employees in proper BMP Implementation, inspection, monitoring, sampling and reporting.
Master Scheduler/Utility Coordinator/SWPPP Manager, 01/2018 - 10/2020
All American Asphalt City, STATE,

Master Scheduler

  • Schedule all construction projects in P6.
  • Schedule all concrete removals and concrete pours.
  • Schedule all asphalt grinding crews.

Underground Utility Coordinator

  • Instruct field employees about the rules and regulations of the Underground Service Alert system and its importance.
  • Initiated and maintain Underground Service Alert Tickets for all projects.
  • Coordinate with Utility owners and field staff regarding potential issues.
  • Record keeping of all current and past Dig Ticket utility locate status.

Stormwater Manager

  • Train field employees regarding proper B.M.P Implementation, site inspection, and reporting.
  • Insure SWPPPs, WPCPs, and ESPCPs are current and correct.
Project Coordinator / Assistant Superintendent, 10/2001 - 12/2017
All American Asphalt City, STATE,
  • Fill in for & Assist Superintendents Regularly.
  • Acquire and compare pricing for job site items.
  • Attend Pre-construction meetings.
  • Read and review all project plans and specifications.
  • Initiate Traffic Control Plan development, approval, and implementation.
  • Build and update schedules.
  • Schedule subcontractors & field employees.
  • Locate, obtain lease agreement, and set up field office and / or yard
  • Order Traffic Control devices per approved Traffic Control Plan
  • Set up "Project Information Signs", funding signs, construction area signs, & changeable message signs.
  • Procure City, County, Caltrans, Railroad, & other permits.
  • Public Notice creation, distribution, & management of inquiries & issues from the calls generated by the notice.
  • Submit for misc. materials to agency and order upon approval.
  • Delineate, Initiate, & update Underground Service Alert tickets.
  • Collect and verify monthly "Field Measurement Sheets" for billing.
  • Train field employees for SWPPP implementation and reporting.
  • Locate, obtain construction water supply.
  • Disseminate information to and from field to the project managers & superintendents.
  • Initiate, track, and implement RFI(s).
  • Weekly meetings with the agency to discuss project progression and potential issues.
  • Maintained project schedules by managing deadlines and adjusting workflow as needed, Updated construction schedules.
  • As-Build drawings / project closeout.
QC / QA Manager, 10/1997 - 10/2001
All American Asphalt City, STATE,
  • Established company wide QC / QA program to meet the State specification.
  • Managed 3rd party laboratory in the Mix Design preparation, field testing, and laboratory testing.
  • Coordinated with the company lab, the 3rd party lab, and the agency lab for the Test Strip placement, testing, and approval.
  • Coordinated with the company lab, the 3rd party lab, and the agency lab for the during and post production calculations of the "Reduced Payment Factors" yielding an average payment of just under 105%.
  • Record keeping of quality reports and statistical reviews.
  • Troubleshot issues, located and fixed problems.
Quality Control, 02/1993 - 10/1997
Company Name City, State,
  • Assessed quality and integrity of aggregate products against specifications and made rock plant adjustments, keeping the products within specification limits.
  • Assessed quality and integrity of asphalt products from both batch and continuous mix plants against project specifications, made adjustments at the asphalt plants to keep the products at optimum.
  • Created a program to calculate plant percentages of product required to produce the optimum mix to meet the specifications required (also stored in the program), the program is still being used to supply customers with "Mix Designs".
  • Create Asphalt Concrete Submittals for all projects.
  • Created the first "Dry Process" Rubberized Asphalt Concrete in California.
  • Established specific rolling patterns to achieve optimum density during the placement of asphalt.
  • Trained roller operators rolling patterns to achieve optimum density during the placement of asphalt.
  • Maintained "Radioactive Material License" as Assistant Radiation Safety Officer.
  • Trained and managed employees on the correct use, transportation, and documentation of the radioactive density gauge.
  • Directed employees on field quality control and daily density testing.
Education and Training
CPSWQ, Certified Professional in Storm Water Quality: , Expected in 03/2023
-
Envirocert International - ,
GPA:
Status -
SWPPP Developer, QSD: , Expected in 03/2023
-
Office of Water Programs - ,
GPA:
Status -
Certified Inspector of Sediment And Erosion Control: , Expected in 05/2021
-
CISEC - ,
GPA:
Status -
OSHA - 10: , Expected in 08/2019
-
OSHA - ,
GPA:
Status -
SWPPP Practitioner, QSP: , Expected in 05/2014
-
Office of Water Programs - ,
GPA:
Status -
CESSWI, Certified Erosion, Sediment and Stormwater Inspector: , Expected in 03/2014
-
Envirocert International - ,
GPA:
Status -
Primavera P6: , Expected in 01/2014
-
Oracle University - ,
GPA:
Status -
Primavera P3: , Expected in 02/2007
-
Oracle University - ,
GPA:
Status -
Sure Track: , Expected in 01/2002
-
Oracle University - ,
GPA:
Status -
Caltrans Storm Water Pollution Prevention Plan: , Expected in 05/2000
-
Global Environmental Network - ,
GPA:
Status -
Radiation Safety Officer: , Expected in 02/1995
-
Troxler Laboratories - ,
GPA:
Status -
Radiation Safety: , Expected in 08/1993
-
Troxler Laboratories - ,
GPA:
Status -
High School Diploma: , Expected in 06/1988
-
Huntington Beach High School - Huntington Beach, CA
GPA:
Status -
Studied At: , Expected in
-
Orange Coast College - Costa Mesa, CA
GPA:
Status -
Studied At: , Expected in
-
Golden West College - Huntington Beach, CA
GPA:
Status -
Skills
  • Team coordination
  • Schedule coordination / oversight
  • Documentation expertise
  • SWPPP Implementation
  • CISEC Trainer of Record
  • Data gathering and documentation
  • Advanced mathematical aptitude
  • Excel mastery
  • P6 mastery
  • Dig Alert mastery
  • Decision making
  • Schedules and milestones
  • CERS / CUPA trained
  • Familiar with local and federal UST requirements
  • Proficient in Word

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Envirocert International
  • Office of Water Programs
  • CISEC
  • OSHA
  • Office of Water Programs
  • Envirocert International
  • Oracle University
  • Oracle University
  • Oracle University
  • Global Environmental Network
  • Troxler Laboratories
  • Troxler Laboratories
  • Huntington Beach High School
  • Orange Coast College
  • Golden West College

Job Titles Held:

  • Stormwater / Haz Mat / CERS/ CUPA Manager
  • Master Scheduler/Utility Coordinator/SWPPP Manager
  • Project Coordinator / Assistant Superintendent
  • QC / QA Manager
  • Quality Control

Degrees

  • CPSWQ, Certified Professional in Storm Water Quality
  • SWPPP Developer, QSD
  • Certified Inspector of Sediment And Erosion Control
  • OSHA - 10
  • SWPPP Practitioner, QSP
  • CESSWI, Certified Erosion, Sediment and Stormwater Inspector
  • Primavera P6
  • Primavera P3
  • Sure Track
  • Caltrans Storm Water Pollution Prevention Plan
  • Radiation Safety Officer
  • Radiation Safety
  • High School Diploma
  • Studied At
  • Studied At

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: