McMaster Carr Elmhurst, IL
- demolition and equipment removal of kitchen and cafeteria
- demolition of ceramic floors, dropped ceiling and walls
- supervision of 6-12 man labor team
- delegated work load
- order and distribution of dumpsters
- order of materials and equipment
- coordination of safety plan with safety department
Sensia Hoffman Estates, IL- 3 floors of demolition
- demolition of VCT tile, ceramic tile, dropped ceiling, laboratory equipment, duct work, and all interior walls
- supervision of 10-15 man labor team
- delegated work load
- order and distribution of dumpsters (10-15 30yd. dumpsters per day)
Kraft Foods Northfield, IL- 2 floors of demolition
- demolition of carpet, dropped ceiling, and all interior walls
- hauling of HVAC demolition and electrical demolition
- supervision of 12 man labor team
- delegated work load
- order and distribution of dumpsters
Comcast Cable Chicago, IL- night shift supervisor
- demolition of carpet, VCT tile, hard wood flooring, dropped ceiling, mill work, all interior walls, glass walls, bathrooms, kitchen, and break room
- coordinated sprinkler shut down schedule with building engineers
- coordinated freight elevator schedule with building management
- supervision of 6 man labor team
- coordinated overnight dumpster schedules
- delegated work load
Macy's Chicago, IL
- 4 phase project
- demolition of carpet, ceramic tile, display units, mill work, and interior walls
- supervised 8-10 man labor team
- delegated work load
- coordinated freight elevator schedule with building management
- coordinated overnight dumpster schedule
Nieman Marcus Oak Brook, IL
- saw cut floor for new shaft openings
- break out concrete floor
- cut out pan decking
- use of negative air machines for dust control
- secure protection of store merchandise
- supervised 4 man labor team
Karcher Art Space Waukegan, IL
- 9 story demolition project
- demolition of 3 elevators including penthouse equipment and shaft (cutting torch)
- demolition of all plumbing and sewer lines (cutting torch)
- demolition of all interior walls
- demolition of exterior windows
- demolition of 3 staircases (cutting torch)
- demolition of 9 story fire escape (cutting torch, 2 electric hoists on roof)
- demolition of 9 story exterior flue (cutting torch, 1 electric hoist on roof)
- demolition of 9 floors for installation of new stairwell (saw cutting of existing floors)
- demolition of 9 floors for new bathrooms (floor openings approximately 10ft. x 40ft., saw cutting of existing floors)
- demolition of all exterior sidewalks (skid steer and jackhammer)
- demolition of brick walls
- demolition of existing store front
- co-supervised 8-15 man labor team
- daily dumpster traffic control (flagging)
- crane traffic control (flagging)
- enforced safety standards (fall protection, hand rails, and personal protective equipment)
- communicated with superintendent staffing, supply and equipment needs
- order and distribution of dumpsters
- delegated work load
Christ Hospital Oak Lawn, IL
- chiller and cooling tower project
- competent person for 4 separate excavations (critical dig)
- crane signalman for cooling tower lift and installation of cooling tower piping
- designated safety officer
- communicated with superintendent scheduling needs
- general laborer duties (cleaning, moving of materials, etc.)
- order and distribution of dumpsters