Proficient in maintaining smooth and efficient mechanical systems. Systematic professional with keen eye for details, strong focus on performance improvement. Adept at working in government service situations. Dedicated to increasing effectiveness by streamlining workflows and maintenance procedures with knowledge of developing and enhancing best practices.
Skills
Efficiency Improvement
Multi-project coordination
Design implementation
Verbal and written communication
Conflict resolution
Leadership
Manufacturing process control
Test instrumentation
Education
University of Alabama At HuntsvilleHuntsville, ALExpected in 12/2006 ā āBachelor of Science:Business Administration - GPA:
Work History
Eaton Corporation - Engineering Technician Auburn, WA, 10/2016 - Current
Applied engineering principles to develop and operate electrical, mechanical and data processing systems.
Read and interpreted blueprints, technical drawings, schematics and computer-generated reports.
Investigated equipment function to diagnose faults and make recommendations to provide solutions.
Frequently diagnosed mechanical problems and determined how to correct issues.
Organized data archive of engineering specifications, drawings, and specifications and maintained traceability of documents by proper filing and indexing.
Installed strain gauges, thermocouples, pressure transducers, and accelerometers to numerous test articles for structural strength and structural dynamics testing.
Performed troubleshooting, diagnosis and repair of strain gauges, EDI/LVDT, fiber optic sensors and MDAS testing equipment.
Design and build EDI/LVDT structures and install in all locations needed in and around test article per engineer's drawings.
Inspected and tested equipment, machinery and components to diagnose issues, recognize defects and determine appropriate repairs.
Coordinated installation of systems, machinery and components.
Identified mechanical problems and determined best solutions for correction.
Worked closely with test engineers to maintain optimum levels of communication to effectively and efficiently complete projects.
Denim Group - Project Manager Austin, TX, 07/2014 - 10/2016
Developed and initiated projects, including managing costs, schedule and performance.
Developed implementation methodologies to rein in project costs while meeting key milestones.
Provided management for 15+ internal personnel, contractors and vendors.
Boosted revenues by coordinating and executing new offset printing projects and growing inventory diversity.
Interpret, apply and /or enforce all company policies, programs, rules, regulations and safety rules.
Achieve departmental, plant and corporate goals for safety, quality and productivity.
Modified and directed project plans to meet organizational needs.
Achieved project deadlines by coordinating with contractors to manage performance.
Managed all phases of $1.2 million project from procurement to commission.
Changeover large offset printing machine from one product to others, including retrofitting machine with new mandrel sets, new plate sets, adjusting timing of servo motors, site lasers, and feeding chutes
Machine modification and maintenance (reconfigured offset printing machine to further grow customers product line).
Highlighted critical issues and alternatives for project in early stages, and made recommendations and implementation of those plans.
Trusswalk, Inc - Operations Manager/ Production Manager City, STATE, 03/2003 - 07/2014
Directed manufacturing process and operational efficiency procedures to achieve goal of first run capability.
Drove daily production activities with effective communication and leadership.
Implemented scheduled maintenance, retooling production status sheets and driving all tasks to achieve scheduling effectiveness.
Successfully managed production activities to achieve on-time shipment of orders.
Sourced materials to keep up with production goals and meet customer demands.
Implemented performance, quality and efficiency measures to achieve aggressive production goals.
Completed and maintained accurate and organized records, documents and reports.
Calculated finances and production costs while managing cash flow.
Created streamlined production schedules and collaborated with production employees to communicate objectives and goals.
Implemented quality improvement changes to minimize product defect rates.
Trained in and certified in Alpine Design and Engineering software and MiTek Design and Engineering software to design roof trusses and roof truss packages for customers.
Designed roof trusses and engineered flooring systems using auto-cad and truss design software in order to ensure designs are accurate, optimized, and conform to standards.
Oversaw repair and maintenance staff caring for equipment, buildings and grounds.
Procured required manufacturing equipment and parts.
Supported machine operators in setup and operation of production equipment resulting in efficient runs.
Managed and worked alongside 15+ employees to ensure that design, production, and delivery processes are completed in timely and efficient manner while maintaining extremely high level of quality and safety.
Accomplishments
Supervised team of 10-25 staff members.
Used Microsoft Excel to develop inventory tracking spreadsheets.
Collaborated with team of 12-15 members in the setup and Modal test series of NASA's SLS green run core stage test.
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
How this resume score could be improved?
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume: