LiveCareer-Resume

electrical general foreman resume example with 20+ years of experience

Jessica Claire
Montgomery Street, San Francisco, CA 94105 609 Johnson Ave., 49204, Tulsa, OK
Home: (555) 432-1000 - Cell: - resumesample@example.com - : - -
Professional Summary

Looking to secure a position as Electrical Superintendent, Construction Safety manager, or Construction Superintendent. Successful at building fast pace jobs efficiently and meeting deadlines while not jeopardizing safety. Eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Motivated to grow and excel in the Electrical world.

Skills
  • Run Crews with 20+
  • OSHPD-3 Clinics
  • OSHA-30 certified
  • Bilingual reading and writing (Spanish)
  • Active Data center conscious
  • Pharmaceutical structuring
  • Customer service
  • Team building
  • Supervision
  • Electrical installation, repair, maintenance
  • New construction, renovation, TI
  • Preventive and reparative maintenance
  • NEC code regulations
  • Knowledge of National Electric Code (NFPA 70)
  • Construction management
  • State and local electrical codes
  • Blueprints and schematics
  • T24 Knowledgeable
  • Job walks and takeoffs
  • LOTO certified
  • Arch flash training
Work History
06/2006 to Current
Electrical General Foreman Worleyparsons Ltd Columbus, NE,
  • Responded to emergencies and outages that required additional labor and assistance for repairs, and backed up team to support job as well as keeping a professional composure to communicate with customer while keeping them calm through the unforeseen and unwanted present circumstance.
  • Assisted with root cause analysis to identify faults of problems in failed electrical installs and/or incidents.
  • Ability to fully understand and read prints. Familiar with Architectural, M.E.P, Millwork, equipment matrix, F/A, Security Drawings.
  • Observed and implemented company safety rules and regulations to minimize workplace accidents and reduce electrical hazards.
  • Ability to develop an MOP for job site safety and customer coordination of electrical install for critical work, environment, hazards, and planning.
  • Ability to work alone as well as run crews from 20+
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Worked with various customers to understand needs and provide electrical service.
  • Implemented and approved design control procedures for electrical development in accordance with regulatory guidelines.
  • Drove operational improvements which resulted in savings and improved profit margins.
  • Attended weekly on-site meetings with subcontractors and clients.
  • Ensured projects were completed according to approved time, quality and cost estimates in a safe and efficient manner.
  • Meticulously tracked all parts and equipment used on each job site.
  • Evaluated incoming materials for quality and amounts ordered.
  • Established clear priorities and production quality standards.
  • Oversaw employee attendance record, man hours and ordered new materials for Job sites.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Arranged beneficial deals with suppliers for materials to stay within budget limitations.
  • Evaluated production schedules and orders to arrange required materials and plan staffing needs.
01/2010 to 05/2010
General Superintendent Burns & Mcdonnell Richmond, VA,
  • Current OSHA-30- April 2020
  • Management and supervisorial skills.
  • Bilingual, fluent in reading and speaking Spanish.
  • Electrical installations
  • Working knowledge as superintendent managing and directing various trades.
  • Coordinated OAC meetings.
  • Jobsite site planning.
  • Onsite orientations for all trades.
  • Familiar with blue prints
  • Maintain records and files, preparing reports and ordering supply's and equipment.
  • Made sure to keep site clean and orderly while directing labor assistance to protect elevators and existing corridors and lobby.
  • Complied with all safety protocols in plan coordination, eliminating potential risks.
  • Scheduled subcontractors, consultants and vendors to coordinate completion of jobs and tasks.
  • Enhanced company development initiatives by solving complex issues and suggesting corrective action.
06/1996 to 06/2006
Electrical Apprentice Avidex Fremont, CA,
  • Moved equipment, supplies and tools to work locations to assist Foreman in completing skilled work.
  • Incharge of shop cleaning, organizing, ordering materials needed for stock.
  • Used equipment forklift, scissor lift, boom lift.
  • Kept all shelves as well as trucks stocked and cleaned.
  • Filed Buckles and smith price sheets every first of the month.
  • Took apart switchgear and Panels.
  • Inspected and tested electrical systems to identify connection issues and other faults affecting system performance.
  • Boosted job efficiency and customer satisfaction by maintaining organized and clean job sites.
  • Worked under supervision of Foreman to learn trade and develop electrical knowledge.
  • Followed direction of senior electrical professionals to complete safe, efficient tasks.
  • Measured and cut required supplies such as wire and conduit.
  • Maintained cleanliness and organization of work areas.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Worked closely with foreman, adhering to electrical and building codes while utilizing wide range of power tools and diagnostic equipment, including multimeter, megger, infrared heat thermometer.
Education
Expected in to to
GED:
Adrian Wilcox High School - Santa Clara, CA
GPA:
Expected in to to
Electrical Apprenticeship: Electrician
CCTC - 26200 Industrial Blvd, Hayward, CA 94545,
GPA:
Accomplishments

PROJECTS

  • Robinhood, 275 Menlo Park, CA 94026

This project was a TI design build. 41,505 SF with floor cores for cubicles, linear lights at 45 deg slant in open ceiling with complete wattstoper DLM system for office and open area lighting. A/V coordination for conference rooms. break room and Kitchen area with ansul system. Server room with split system and 4000 wiremold for above rack L6-30 with dedicated Emergency power for PDU's. This was an occupied three story building diligent coordination and planning needed as to not to disturb tenants.

  • Digital realty, 2220 Reed st, Santa Clara CA 95050

Install 600v 225A circuit and electrical equipment in Shredder secured room for customer. Shut down coordination with critical emergency power and down time without compromising efficiency. Data center

  • Bloom Energy Corporate headquarters , 4353 N. 1st San Jose CA 95134

This build consisted of 4th through 6th floor for Bloom Energy with 3rd floor market ready built simultaneously for building owner. These were 35,000 SF each floor. Open corridor lighting and custom wooden ceilings. Cloud ceilings in open area with linear lights, T-24 compliant. One of the first projects to use wireless bridge networking for Wattstoper DLM system. IT rooms on each floor and main server room with 150KW UPS. Bus duct riser through floors consisted of ordering and installing buss plugs and complete install of New electrical Rooms per each floor with 150kva transfer for 400A panel and 75kva x-frmr for 225A panels. Engineered stacked transformer built stands. Open area consisted of floor cores through out, circuit and placement coordination with furniture vendor. Executive board room, central control station power coordination and install. Assisted sub contractors with DAS system, security, F/A, A/V, Data raceways. Full commercial Kitchen install.

  • Teleperformance 4655 Great America Parkway Santa Clara CA 95050

This project was 20,073 SF built with open ceilings, custom cloud ceilings, custom wood ceilings with custom lighting and feature walls with acclaim DMX flex tube lighting. We-ef special lighting interface for presentation training room systems. DMX lighting and pixel controls integrated system. Power, Data and A/V rough install coordination for Video walls and TV's. Office and conference room floor box data power coordination and break room install.

Satellite Healthcare Dialysis( San Leandro, San Jose, Merced, Modesto, South Gate, Laguna hills, Larkspur, Vallejo, Soquel,and others)

These projects consist of 25 to 40 patient chair dialysis stations nurses stations, Nurses call system rough in, F/A, TV, Von duprin automatic control wiring, water treatment room control's. Class A lighting install. OSHPD-3 compliance. Most of these building are serviced and maintained after construction. TI, Demo and New construction, PG&E coordination for new service. And coordination for sitework.

  • Satellite Healthcare Dialysis Corporate, 300 Santana Row San Jose CA
  • Stanford Byers eye institute, 2452 Watson ct. Palo Alto 94308

This was a complete build of 31,500 SF first and second floors OSHPD-3 Spec job. LPCH audiology, and Byers eye institute area. Electrical installation and management. F/A raceway install and management. Installation of Data cabling tray. IDF room build out and installation of emergency power. Management of sub contractors. project management. Exam rooms and audiometric hearing booth installation.

  • Bank Of America/ Merrill Lynch, 560 S. Winchester San Jose

This project consisted of Conference and open office area with break rooms. 1st, 3rd, 5th, and 6th floor were completed simultaneously. with10- EV charging stations at parking garage. DLM wattstoper lighting control's with lay in linear lights and bridge network install. Coordinated with national lighting account for customer and designed lighting control's map for device coordination. office, conference, training rms, and open area power coordination for floor box and poke through.

  • Pearl Therapeutics (Aztrazenica) 200 Cardinal way, Redwood City CA 94063

This build was a total of 60,000 SF for 1st, 2nd and 3rd floors built simultaneously. Upgraded Electrical systems cGMP commissioning. Large general purpose labs, spray dry labs, aerosol labs, six Manufacturing suites, support labs, large open office area, private offices, conference rooms, break rooms, Board rooms. ISO/Class 3 manufacturing areas. Pharmaceutical Grade stainless steel light fixtures in pressurized rooms. Building service entrance upgrade. Toxic gas monitoring system, 277v HEPA panel power install.

  • HP Clinic Building 6, 1550 Pagemill, Palo Alto
  • Switch and Data 534 Stockton ave, San Jose
  • Stanford Medical, 7600 Gateway Blvd Newark CA
  • Stanford Medical, 7676 Gateway Blvd Newark CA
  • Microchip 2180 Fortune dr, San Jose CA

and many more.

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Adrian Wilcox High School
  • CCTC

Job Titles Held:

  • Electrical General Foreman
  • General Superintendent
  • Electrical Apprentice

Degrees

  • GED
  • Electrical Apprenticeship

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: