ECDP/ Internship Program Involvement.
- Acting as manager/mentor forĀ 2017Ā internship program.
- Acted as mentor for 2016 internship program.
- Frequently act as peer mentor for ECDP and nternship participants.
- Involved with campus recruitment at UW-Platteville.
Ignition 2 Expansion- Engineering Lead
- Lead engineering efforts to design a seating expansion for Ignition 2.
- Manage the testing and engineering needs of product from prototype to production.
- Work closely with operations to develop a process that will meet the needs of our Design firm while also allowing for success at the production cell.
- Manage and review designs from suppliers and design firm.
- Prototype backs in preparation for tooling.
- Assume full engineering responsibility once tooling has begun
- Bring all chairs through full BIFMA testing and manage any changes that are needed.
- Complete all specification sheets, BFIMA certifications, environmental certifications prior to launch.
- Leverage lessons learned from Solve Reactiv.
Ignition 2 Development/Launch: Engineering Lead
- Set aggressive timeliness to meet key dates/milestones within project life cycle.
- Developed a deep knowledge of plastic part design, design for manufacturing, and tooling capabilities of injection molding.Ā
- Worked continuously with supplier to design a product that not only meets theĀ aestheticĀ needs of our design team but also eases complication for tooling and production.
- Deepened knowledge about the life cycle of a new product, pilot testing, design for tooling, Creo surface modeling, Creo simulate, and BIFMA test requirements.
'Build' Tables Development/Launch: Engineering Lead
- Engineering lead for Build tables launch.
- Led engineering efforts for design, development, and implementation of Build tables.
- Total time from development to launch was 5 months.
- Leveraged design and packaging from existing product lines.
- Broadened knowledge of BIFMA 5.5 test requirements.Ā
Motivate Flexzone CQR
- Utilized Creo Simulate to evaluate cause of CQR data and update part design accordingly.
- dramatically reduced flexzone quality complaints.
PurposeĀ UpholsteryĀ Attachment
- Designed a solution to a major CQR issue.
- Led a 3P event and rapid prototyping to arrive at a creative solution.
Seating New Product Team Responsibilities
- Work directly with suppliers and manufacturing to implement solutions that satisfy both internal and external customers.
- Manage multiple projects while maintaining aggressive deadlines.āā
Smartlink Product Relocation
- Assigned as product engineer on team to move Smartlink production from Florence AL to the Muscatine Campus.
- Implemented design changes to accommodate manufacturing capabilities.
- Leveraged existing parts used at new production facility to alleviate plant complexity. ā