LiveCareer-Resume

mechanical foreman resume example with 19+ years of experience

Jessica Claire
  • Montgomery Street, San Francisco, CA 94105 609 Johnson Ave., 49204, Tulsa, OK
  • H: (555) 432-1000
  • C:
  • resumesample@example.com
  • Date of Birth:
  • India:
  • :
  • single:
Summary

Construction professional bringing valuable experience from many trades in large industrial construction work.

Highlights
  • Over 11 years Northern Virginia industrial construction experience
  • Blueprint and specifications proficiency
  • Exceptional math aptitude

  • Strong communication skills
  • Civil and mechanical installation
  • Vast knowledge of construction materials

Experience
Mechanical Foreman, 09/2012 - Current
Clark Construction Group Canton, GA,

Leading mechanical crew (multi-lingual) of 9 on installation of 67,000 gallon 16 tank FRP deep bed sand filtration system including associated air and sewer piping in accordance with plans and specifications. Completed demo of old 36 inch effluent piping and pumps and installed new. Adding new mechanical bar screening and conveyor system for grit and trash removal to filtration system. Performing system testing on pipes installed as required by engineering firm and third party quality control inspection agency.

Mechanical Foreman, 03/2011 - 09/2012
Clark Construction Group Dallas, TX,

Led mechanical team on installation of complete 125 foot radius Primary Clarifier system in accordance with manufacturers and engineers specifications and standards. Installed and tested multiple sluice gates for effluent discharge into holding ponds. Completed installation of 3 125 ft. radius Primary Clarifier aluminum covers and odor control system, including FRP piping to carbon air cleaning exhaust stacks. Re-routed and installed new CPVC pipelines in excess of 200 feet to chemical feeding system containing Sodium bisulfite and sodium hypochlorite.

SCP Foreman, 04/2008 - 09/2009
General Electric Saratoga Springs, NY,

Led mechanical crew in excess of 15 to successful installation of Fine Bubbler Aeration system and associated air piping. Managed subcontractor work in accordance with agreed scope and pricing and provided daily reports on their activities to my project manager. Led crew on installation of 3 125 ft. radius Secondary Clarifier mechanisms, including FRP weirs and baffles. Installed piping and valves in excess of 24in for 10 tank gravity filtration system.

Field Engineer, 04/2004 - 04/2008
Pizzagalli Construction (now PC) City, STATE,

Performed layout duties, as delineated by blueprints, vital to completion of concrete and piping systems needed to complete large lift stations and wastewater plant functions. Provided accurate line and leveling as sole field engineer for $11M Linton Hall Lift Station Gainesville, VA. Provided angle, direction and elevation for new 54in HDPE gravity sewer line from existing pipeline to new lift station totaling over 400 feet. Provided line, grade and layout duties for new Fuller Heights Lift Station, Quantico, VA. Performed layout, line and grade from excavation to archtectual brick of new Ultraviolet facility at HLMooney AWWTP, Woodbridge, VA.

Labor Lead, 04/2003 - 04/2005
Pizzagalli Construction (now PC) City, STATE,

Ran concrete crew of laborers and finishers in placing, finishing and curing structural concrete totaling more than 6,000 cubic yards. Placements included slabs on grade, walls, sidewalks, pipe encasements among others. Dismantled stick-built and gang form systems after concrete placements. Installed structural rebar as designed by engineer.

Concrete helper, 04/2000 - 04/2003
Pizzagalli Construction (now PC) City, STATE,

Placed, finished and cured structural concrete as required for walls, sidewalks, slabs on grade, etc. Placement methods involved crane and bucket and pump truck piping.

Education
High School Diploma: , Expected in 1999
-
Stafford Senior High School - Stafford, Va
GPA:
Status -
: , Expected in
-
- ,
GPA:
Status -
  • In-house education on scheduling program Primavera
  • In-house education on civil and mechanical estimating philosophies and take off nuances
  • 40 hour OSHA training completed with 10 hour OSHA refresher courses taken annually
  • Attended PC company Management Development Program in 2008, consisting of budgeting and forecasting seminars, customer satisfaction practices and managerial techniques in the field
Interests

Avid golfer, COED and men's softball player, astronomy

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Stafford Senior High School

Job Titles Held:

  • Mechanical Foreman
  • Mechanical Foreman
  • SCP Foreman
  • Field Engineer
  • Labor Lead
  • Concrete helper

Degrees

  • High School Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: