Construction professional bringing valuable experience from many trades in large industrial construction work.
|
|
Leading mechanical crew (multi-lingual) of 9 on installation of 67,000 gallon 16 tank FRP deep bed sand filtration system including associated air and sewer piping in accordance with plans and specifications. Completed demo of old 36 inch effluent piping and pumps and installed new. Adding new mechanical bar screening and conveyor system for grit and trash removal to filtration system. Performing system testing on pipes installed as required by engineering firm and third party quality control inspection agency.
Led mechanical team on installation of complete 125 foot radius Primary Clarifier system in accordance with manufacturers and engineers specifications and standards. Installed and tested multiple sluice gates for effluent discharge into holding ponds. Completed installation of 3 125 ft. radius Primary Clarifier aluminum covers and odor control system, including FRP piping to carbon air cleaning exhaust stacks. Re-routed and installed new CPVC pipelines in excess of 200 feet to chemical feeding system containing Sodium bisulfite and sodium hypochlorite.
Led mechanical crew in excess of 15 to successful installation of Fine Bubbler Aeration system and associated air piping. Managed subcontractor work in accordance with agreed scope and pricing and provided daily reports on their activities to my project manager. Led crew on installation of 3 125 ft. radius Secondary Clarifier mechanisms, including FRP weirs and baffles. Installed piping and valves in excess of 24in for 10 tank gravity filtration system.
Performed layout duties, as delineated by blueprints, vital to completion of concrete and piping systems needed to complete large lift stations and wastewater plant functions. Provided accurate line and leveling as sole field engineer for $11M Linton Hall Lift Station Gainesville, VA. Provided angle, direction and elevation for new 54in HDPE gravity sewer line from existing pipeline to new lift station totaling over 400 feet. Provided line, grade and layout duties for new Fuller Heights Lift Station, Quantico, VA. Performed layout, line and grade from excavation to archtectual brick of new Ultraviolet facility at HLMooney AWWTP, Woodbridge, VA.
Ran concrete crew of laborers and finishers in placing, finishing and curing structural concrete totaling more than 6,000 cubic yards. Placements included slabs on grade, walls, sidewalks, pipe encasements among others. Dismantled stick-built and gang form systems after concrete placements. Installed structural rebar as designed by engineer.
Placed, finished and cured structural concrete as required for walls, sidewalks, slabs on grade, etc. Placement methods involved crane and bucket and pump truck piping.
Avid golfer, COED and men's softball player, astronomy
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
Companies Worked For:
School Attended
Job Titles Held:
Degrees
© 2021, Bold Limited. All rights reserved.