Montgomery Street, San Francisco, CA 94105
Home: (555) 432-1000 - Cell: - resumesample@example.com - -
I have been working in construction my entire life and have been very fortunate in the opportunities I have been able to take advantage of. I have had the opportunity to work in various fields in many different trades. After living outside of ohio for the last six years, I have decided to move back home and try to find a job as a GIS Analyst or Engineering Technician in the Cleveland/Akron area.
- Laborer
- Surveyor
- General Contractor
- CADD Technician
- GIS Analyst
- Field collection and attribution
- Engineering Technician
| - Using AutoCAD, Microstation, Land Desktop, Geographics, ArcGIS.
- Using SurveyLab
IKE for data collection. - Surveying with construction Grade Total Station.
|
04/2012 to Current Laborer Stonemor Partners – Jamestown, NC,
- Asphalt laborer who assisted in paving roads, parking lots, driveways, walkways, etc.
10/2010 to 03/2012 Engineering Technician Eaton Corporation – Seattle, WA,
The purpose of the project was to locate and accurately document Fort Drum's communication system for future projects and maintenance of the existing system. The parts of the project I was responsible for were:
- Correct and update existing communication levels from field notes and construction drawings.
- Create and attribute a complete communications system from field surveys and as-builts.
- Import and correct shapefiles generated from a field survey team into ArcGIS and ensure they are SDSFIE complient as well as compatible with the rules of our local database.
08/2009 to 08/2010 Site Survey Team Stantec Inc. – Honolulu, HI,
For this Project, I was part of a four man team that surveyed US property on military bases in Iraq and Afghanistan.
- Collected real-property data in Iraq & Afghanistan.
- Extensive use of the IKE and ArcGIS.
- Data collection & feature attribution to send back to a field extraction team.
01/2009 to 08/2009 GIS Analyst Stonemor Partners – Joliet, IL,
- Data conversion from AutoCAD files to SDSFIE compliant files to be input into GIS.
- Feature Extraction from Imagery (SDSFIE compliant).
- Microstation & Geographics training.
- Image Syncing and compressing.
01/2007 to 10/2008 CADD Tech. Thomas & Hutton – City, STATE,
- Prepare computer-generated engineering drawings.
- Complete detailed drawings from sketches, plans, specifications, and written and verbal instructions using computer-aided drafting programs.
- Assist members of the design team with the preparation of construction plans, exhibits and other graphics and completed simple calculations with specific instructions.
- Understand and follow the company standard CADD procedures for layering and standard drawing procedures for sheet layout.
- Communicate with other team members regarding projects schedules and progress reports.
02/2002 to 01/2007 Laborer Pruitt Construction Co. – City, STATE,
- Organize and maintain jobsites to OSHA standards.
- Install drainage systems.
- Construct retaining walls.
- Layout building corners, bearing plates, light pole bases, curbs, etc.
- Managed three remodeling projects.
Expected in GED:
Stow-Munroe Falls High School - 3227 Graham Rd, Stow, OH 44224
GPA:
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
How this resume score
could be improved?
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:
- Formatting
- Length
- Personalization
- Target Job