• Dashboard
  • Resumes
  • Cover Letters
  • Resumes
    • Resumes
    • Resume Builder
    • Resume Examples
      • Resume Examples
      • Nursing
      • Customer Service
      • Education
      • Sales
      • Manager
      • View All
    • Resume Search
    • Resume Templates
      • Resume Templates
      • Microsoft Word
      • Professional
      • Modern
      • Traditional
      • Creative
      • View All
    • Resume Services
    • Resume Formats
      • Resume Formats
      • Chronological
      • Functional
      • Combination
    • Resume Review
    • How to Write a Resume
      • How to Write a Resume
      • Summary
      • Experience
      • Education
      • Skills
        • Skills
        • Hard Skills
        • Soft Skills
    • Resume Objectives
  • CV
    • CV
    • CV Examples
    • CV Formats
    • CV Templates
    • How to Write a CV
  • Cover Letters
    • Cover Letters
    • Cover Letter Builder
    • Cover Letter Examples
      • Cover Letter Examples
      • Customer Service
      • Marketing
      • Sales
      • Education
      • Accounting
      • View All
    • Cover Letter Services
    • Cover Letter Templates
    • Cover Letter Formats
    • How to Write a Cover Letter
  • Questions
  • Resources
  • About
    • About
    • Reviews
  • Contact
  • jane
    • Settings
    • Help & Support
    • Sign Out
  • Sign In
Member Login
  • LiveCareer
  • Resume Search
  • Concrete Finisher
Please provide a type of job or location to search!
SEARCH

Concrete Finisher Resume Example

Love this resume?Build Your Own Now
CONCRETE FINISHER
Summary
  • Has own transportation,will travel flexible hours and overtime.
Skills
  • Magic Screed quality control
  • Site preparation
  • Power saws
  • Trowel machinery
  • Bull floats
  • Truck chute operation
  • Jointers and edgers
  • Leveling
  • Mixing
  • Surface finishing
Experience
Concrete Finisher02/2017 to 01/2018Olgoonik Development, LlcWainwright , AK
  • Used forklifts and other equipment to move materials and complete project work with construction team.
  • Prioritized tasks for each job after reading all project blueprints and documents.
  • Laid and repaired concrete to make level and long-lasting surfaces.
  • Used numerous types of power tools and other equipment daily.
  • Upheld all requirements for safe operations and reporting of incidents.
  • Maintained safety of work areas by adhering to strict regulations.
  • Mixed and poured concrete according to standard ratios.
  • Maintained inventory list of all items used on job sites to provide information needed for reordering.
  • Prepared concrete by hand mixing sand and cement.
  • Constructed forms to create various concrete structures.
  • Operated equipment and vehicles, including excavators and loaders to prepare site.
  • Removed debris and waste to clean site after completing work.
  • Calculated concrete quantities needed for jobs.
  • Inspected and maintained tools and equipment.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Loaded and unloaded necessary tools, materials and machines from trucks and trailers.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Poured concrete into forms using pump hose and leveled.
  • Reviewed blueprints and other drawings to identify correct grades.
  • Set up scaffolding, braces and other temporary structures to support crew during work.
  • Dismantled forms using [Tool].
  • Worked with teammates to move steel forms.
  • Placed steel pins using sledgehammer.
Concrete Finisher06/2016 to 06/2017Olgoonik Development, LlcSan Diego , CA
  • Prioritized tasks for each job after reading all project blueprints and documents.
  • Laid and repaired concrete to make level and long-lasting surfaces.
  • Troubleshot equipment issues and determined best courses of action for repairs.
  • Used numerous types of power tools and other equipment daily.
  • Upheld all requirements for safe operations and reporting of incidents.
  • Maintained safety of work areas by adhering to strict regulations.
  • Mixed and poured concrete according to standard ratios.
  • Prepared concrete by hand mixing sand and cement.
  • Constructed forms to create various concrete structures.
  • Operated equipment and vehicles, including excavators and loaders to prepare site.
  • Removed debris and waste to clean site after completing work.
  • Calculated concrete quantities needed for jobs.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Poured concrete into forms using pump hose and leveled.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Set up scaffolding, braces and other temporary structures to support crew during work.
  • Dismantled forms using [Tool].
  • Worked with teammates to move steel forms.
  • Maintained inventory list of all items used on job sites to provide information needed for reordering.
Concrete Finisher01/2015 to 06/2016Olgoonik Development, LlcColorado Springs , CO
  • Used forklifts and other equipment to move materials and complete project work with construction team.
  • Laid and repaired concrete to make level and long-lasting surfaces.
  • Used numerous types of power tools and other equipment daily.
  • Maintained safety of work areas by adhering to strict regulations.
  • Mixed and poured concrete according to standard ratios.
  • Maintained inventory list of all items used on job sites to provide information needed for reordering.
  • Prepared concrete by hand mixing sand and cement.
  • Constructed forms to create various concrete structures.
  • Operated equipment and vehicles, including excavators and loaders to prepare site.
  • Removed debris and waste to clean site after completing work.
  • Calculated concrete quantities needed for jobs.
  • Inspected and maintained tools and equipment.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Finished surfaces by troweling, floating and brushing following project requirements and specifications.
  • Loaded and unloaded necessary tools, materials and machines from trucks and trailers.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Poured concrete into forms using pump hose and leveled.
  • Reviewed blueprints and other drawings to identify correct grades.
  • Set up scaffolding, braces and other temporary structures to support crew during work.
  • Dismantled forms using [Tool].
  • Worked with teammates to move steel forms.
  • Placed steel pins using sledgehammer.
Education and Training
GED06/1990G.W. CarverCity, State
Build Your Own Now

DISCLAIMER

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

77Average
Resume Strength
  • Completeness
  • Formatting
  • Length
  • Strong summary

Resume Overview

School Attended

  • G.W. Carver

Job Titles Held:

  • Concrete Finisher

Degrees

  • GED 06/1990

Create a job alert for [job role title] at [location].

×

Advertisement

Similar Resumes

View All
Concrete-Finisher-resume-sample

Concrete Finisher

Olgoonik Development, Llc

Wichita , KS

Concrete-Finisher-resume-sample

Concrete Finisher

Olgoonik Development, Llc

Ventura , CA

Concrete-Laborer/Finisher-resume-sample

Concrete Laborer/Finisher

Mdu Resources Group, Inc.

Chandler , AZ

  • About Us
  • Privacy Policy
  • Terms of Use
  • Sitemap
  • Work Here
  • Contact Us
  • FAQs
  • Accessibility
  • EN
  • UK
  • ES
  • FR
  • IT
  • DE
  • NL
  • PT
  • PL
customerservice@livecareer.com
800-652-8430 Mon- Fri 8am - 8pm CST
Sat 8am - 5pm CST, Sun 10am - 6pm CST
  • Stay in touch with us
Site jabber winner award

© 2022, Bold Limited. All rights reserved.