LiveCareer
LiveCareer
  • Dashboard
  • Jobs
  • Resumes
  • Cover Letters
  • Resumes
    • Resumes
    • Resume Builder
    • Resume Examples
      • Resume Examples
      • Nursing
      • Education
      • Administrative
      • Medical
      • Human Resources
      • View All
    • Resume Search
    • Resume Templates
      • Resume Templates
      • Nursing
      • Education
      • Medical
      • Human Resources
      • Customer Service
      • View All
    • Resume Services
    • Resume Formats
    • Resume Review
    • How to Write a Resume
    • CV Examples
    • CV Formats
    • CV Templates
    • Resume Objectives
  • Cover Letters
    • Cover Letters
    • Cover Letter Builder
    • Cover Letter Examples
      • Cover Letter Examples
      • Education
      • Medical
      • Human Resources
      • Customer Service
      • Business Operations
      • View All
    • Cover Letter Services
    • Cover Letter Templates
    • Cover Letter Formats
    • How to Write a Cover Letter
  • Jobs
    • Mobile App
    • Job Search
    • Job Apply Tool
    • Business Letters
    • Job Descriptions
  • Questions
  • Resources
  • About
  • Contact
  • 0Notifications
    • Notifications

      0 New
  • jane
    • Settings
    • Help & Support
    • Sign Out
  • Sign In
Member Login
  • LiveCareer
  • Resume Search
  • Research Associate
Please provide a type of job or location to search!
SEARCH

Research Associate Resume Example

Resume Score: 90%

Love this resume?Build Your Own Now
RESEARCH ASSOCIATE
Summary
Highly meticulous and resourceful Entry Level Civil Engineer with an exceptionally strong engineering knowledge base and work ethic. Adept at explaining complicated engineering concepts and practices to both lay and professional audiences in a clear and accessible manner. Able to function well as an independent worker or as a member of a professional engineering and construction team.
Highlights
Navisworks Manage with Timeliner Microsoft Office Suite D4Cost Strong communication skills Dprofiler Client relations Synchro Public relations Construction site management Cost estimates LEED principles
Accomplishments
  • Scheduling and coordination of Construction work for HSBC building Scheduling by using Navisworks manage as a tool for 4D modelling to better assist for visualization, easy retrieval of information, time reduction, coordination and clash detection.
  • Simulation of Kalamazoo-Portage Commute Traffic Used Micro Simulation to investigate the intersection of West Centre Avenue and South 12th street Conduct Delay Analysis of the Southbound Left Turn movement to reduce excessive delays and queue formation Found out the traffic volumes from Kalamazoo Area Transportation Study website Modeled Stadium Drive in Synchro according to its old geometry The traffic volumes are converted to Peak hour traffic volumes For finding out the Peak hour traffic volumes, multiplied the annual traffic volumes with 10 percent.
  • Adjusted the options such as Turn Type, Protected Phase, Permitted Phase, and Lead/Lag to provide the best fit to the real world case.
  • Optimized the green split and cycle length of the signal by choosing Optimize Intersection Splits and Optimize Intersection Cycle Length.
  • Used Synchro 9 and Vissim software for this project Significance of Estimation and its role in Construction Industry In order to systematize estimation for construction projects, we developed the model consisting by four main stages: project information and knowledge gathering, knowledge acquisition, best practice knowledge data base creation and knowledge based decision support for projects implementation.
  • Improvements on a rural divided four-lane highway in Michigan Our highway design team has been assigned to plan improvements on a rural divided four-lane highway in Michigan.
  • The upgrades will be installed in 2020 but they must be designed to accommodate traffic into the year 2040.
  • The highway is located on rolling terrain and the speed limit is 55 mph.
  • It has 11 foot lane width and 5 feet of lateral clearance.
  • The section we are working on is 3.5 miles long and there are 10 access points for traffic to enter.
  • Our goal is to make changes to the highway that will improve the future level of service up to LOS B in 2040 as effectively as possible without altering the location of the existing road.
  • Estimation on developing and designing of the AZO commercial building Using D4Cost as the approximate estimating tool & preparing a statement of probable cost of the AZO commercial building project and using DProfiler making designs of the shape of the building, proposing different cladding options and structural frames to be cost-effective Solving Site-work schedule using Critical Path Method (C.P.M) and Program Evaluation and Review Technique (P.E.R.T) by Linear Programming with Lingo as a tool Study of Planning and Construction work of HYDERABAD METRO RAIL through L&T METRO RAIL HYDERABAD The Hyderabad Metro Rail project is undertaken by Larsen and Toubro (L&T Ltd).
  • The Metro Rail System has a length of approximately 71.16 kilometers consisting of three corridors.
  • Work consisted of detailed schedule, sequence of construction, resources, organization, productivity norms and preparedness Mix Design & Construction Procedure of Flexible Pavement Worked for State Highways Development Project (SHDP) on construction of four-lane (212.5km) of the existing two-lane stretch road on State Highway.
  • Objective was to acquire retrospective events, prospective events, analyze, compare, test and make a report of the project.
Experience
04/2013 to 09/2013
Research AssociateCompany Name - City
  • Quality In charge.
  • Monitoring all the site activities on daily basis coordinating with the contractors.
  • During this project I was exposed to Construction of Roads and Structures, QualityControl, Laboratory.
  • Tests, Design concepts and Method statements.
  • Developed cost estimates ensuring adherence to budget for construction, renovation and remediation projects.
  • Estimated quantities of concrete and re-bar required for the project based on drawings provided by Structural team.
  • Prepared, monitored and updated schedules at beginning of the project.
  • Assigned targets to Sub-Contractors based on Schedule, and prepared weekly & monthly progress reports.
  • for internal review.
  • Created presentations, agendas, correspondences for internal and external executives.
  • Conducted regular meetings with vendors and sub-contractors for smooth progress of the project.
  • Coordinated with Construction Managers to review projects, maintained estimates, tracked invoices and change orders.
  • Assisted Construction Manager to resolve concerns, issues and conflicts encountered during construction process.
  • Used AutoCAD, BIM mainly in this project.
01/2013 to 05/2013
Site EngineerCompany Name - City
  • Execution of site construction activities as per the drawings and specification as part of daily work.
  • Working here has helped me a lot; Punctuality, Discipline and Practical Outlook are some areas I improved in.
04/2012 to 09/2012
InternCompany Name - City
  • Inspected project sites to monitor progress and adherence to design specifications, safety protocols and state sanitation standards.
  • Gained knowledge in various constructional activities at the metro rail depot i.e.
  • Traffic Management, Quality Control, surveying, piers, viaduct, retaining wall, batching plant, safety and Environment.
  • Worked on construction of a commercial building and gained knowledge about Fabrication and erection work, Concreting and Re-bar calculations, Detail study of drawings, Scaffolding and Form work.
Trainee Engineer
  • in the project "Villa Onyx".
  • During Internship I have gained valuable experience related to design and practical issues encountered during execution phase.
  • Worked on erection and fabrication of segments.
  • Supervised construction sites regularly with Construction manager to review work progress and compliance to standards of quality, cost, schedules and safety.
  • Prepared work scope for construction, renovation and remediation of Units.
  • Produced project status reports for production meetings between construction team and management.
  • Reports included: status update, budget, schedule and risks.
Education
2016
Master of Science: Civil EngineeringWESTERN MICHIGAN UNIVERSITY - City, StateCivil Engineering
Coursework includes Automation in Construction Management, Construction Project Control, Risk Management in Construction, LEED and Sustainability. Advance Design Project on Automation in Scheduling using 4D and 5D techniques.: Transportation EngineeringTransportation Engineering
Advanced AutoCAD courses, Autodesk Navisworks, Solibri Model Checker, Synchro Professional .
2014
Bachelor of Science: CIVIL ENGINEERINGSRM UNIVERSITY - CityINDIACIVIL ENGINEERING I worked on my major project Experimental Study on Cellular Lightweight Concrete Blocks and was implemented in the construction of our university building. Mini project on "Analysis and Design of Multi-Purpose Building" using Auto Cad and STAAD Pro
Certifications
AutoCAD 2012 Certified Associate by Autodesk. Revit Architecture 2012 certified by Autodesk. STAAD Pro certified by KKM Soft.
Skills
4D, Auto Cad, AutoCAD, Automation, budget, Strong communication skills, Construction Manager, Construction Management, Client relations, Laboratory Tests, meetings, Microsoft Office Suite, Outlook, Onyx, presentations, progress, protocols, Public relations, Quality, Quality Control, renovation, Revit, Risk Management, safety, Scheduling, specification
Build Your Own Now

DISCLAIMER

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

Resume Overview

School Attended

  • WESTERN MICHIGAN UNIVERSITY
  • SRM UNIVERSITY

Job Titles Held:

  • Research Associate
  • Site Engineer
  • Intern
  • Trainee Engineer

Degrees

  • Master of Science : Civil Engineering
    Coursework includes Automation in Construction Management, Construction Project Control, Risk Management in Construction, LEED and Sustainability. Advance Design Project on Automation in Scheduling using 4D and 5D techniques. : Transportation Engineering
    Advanced AutoCAD courses, Autodesk Navisworks, Solibri Model Checker, Synchro Professional .
    Bachelor of Science : CIVIL ENGINEERING

Create a job alert for [job role title] at [location].

×

Advertisement

Similar Resumes

View All
Research-Associate-resume-sample

Research Associate

Dublin, California

Research-Associate-resume-sample

Research Associate

Lebanon, New Hampshire

Research-Associate-resume-sample

Research Associate

Wilmington, Delaware

About
  • About Us
  • Privacy Policy
  • Terms of Use
  • Sitemap
Help & Support
  • Work Here
  • Contact Us
  • FAQs
Languages
  • EN
  • UK
  • ES
  • FR
  • IT
  • DE
  • NL
  • PT
  • PL
Customer Service
customerservice@livecareer.com
800-652-8430 Mon- Fri 8am - 8pm CST
Sat 8am - 5pm CST, Sun 10am - 6pm CST
  • Stay in touch with us
Site jabber winner award

© 2021, Bold Limited. All rights reserved.