- , , 100 Montgomery St. 10th Floor
- H: (555) 432-1000
- C:
- resumesample@example.com
- Date of Birth:
- India:
- :
- single:
Hardworking Maintenance Technician brings expertise in installation, repair and maintenance of complex building systems. Well-versed in regulatory and organizational expectations governing performance over more than 9 years. Resourceful understanding of intricate inspections and process assessments.
- Understanding schematics
- Diagnostics Certification
- Power and hand tool use
- Mechanical Repair
- Equipment repair
- Landscaping and groundskeeping
|
- General plumbing
- Building maintenance
- Heavy equipment maintenance
- Mechanical aptitude
- Light carpentry
|
Maintenance Technician, 04/2012 - Current
Brady Corporation – Dallas, TX, and pipe fittings.
- Identified and located required tools prior to starting each project.
- Cut and beveled piping using cutting torches, saws and threading machines.
- Installed and extended underground storm, sanitation and water piping systems to connect fixtures and plumbing.
- Installed and inspected new and existing plumbing lines up to 2 inches in diameter.
- Assembled and installed PVC and metal pipes and fixtures through building and apartment.
- Hoisted loads using slings, chains, shackles, hooks, cables and other rigging equipment.
- Performed maintenance inspections, tune-ups, oil changes and other key services.
- Performed troubleshooting and diagnostic procedures to locate source of malfunctions.
- Conducted test drives before and after repair services.
- Snowplowing
Automotive Mechanic, 12/1998 - Current
Department Of Defense – Luke Air Force Base, AZ,
- Checked vehicle mileage and determined necessary belts, fluids flushing or gasket replacements.
- Conducted test drives before and after repair services.
- Reviewed brakes and assessed whether pads needed replacement, discs should be turned or other service requirements.
- Completed standard inspections to assess wear and damage to vehicles.
- Monitored shop equipment to maintain safe working condition.
- Removed old oil, replace filters and added correct amount of new fluids
- Used technical manuals and repair documentation to plan and implement high-quality corrections to various owner issues.
- Kept detailed records of repairs, labor involved and parts used.
- Conveyed troubleshooting diagnosis to customer and outlined proposed repair plan and associated costs.
- Connected electrical wiring to control panels and electric motors.
- Helped customers achieve even wear on tires with timely rotation and balancing.
- Interpreted drawings and schematics to pinpoint sources of mechanical issues.
- Wire and stick welding.
- Fabrication
- Small engine repair.
Subcontractor, 10/2007 - 04/2012
Assemblers, Inc. – Stow, MA,
- Followed safety protocols to avoid job site accidents and damage to property.
- Installed windows, doors and siding.
- Painted interiors and exteriors.
- Did concrete setup.
- Landscaping
- Snowplowing
Construction Laborer, 06/1996 - 08/2007
Mccarthy Building Companies, Inc. – Atlanta, GA,
- Maintained clean, safe working environment by removing waste from job site prior to shift completion.
- Collected and removed debris from work sites to maintain team productivity and minimize safety hazards.
- Used picks and shovels to dig, spread and level dirt and gravel.
- Assisted electrical, plumbing and carpentry teams by completing basic and semi-skilled work.
- Met company and OSHA safety guidelines for work site operations to minimize worker risk.
- Prepared sites for concrete work by breaking up damaged concrete and leveling or contouring ground.
- Operated overhead lifts to move heavy and bulky work materials.
- Read and understood specifications, drawings and blueprints to complete accurate, high-quality work.
- Built and disassembled scaffolds, bracing and barricades to assist in vertical construction activities.
- Coordinated communication between equipment operators via two-way radios and hand signals.
- Assisted project planning by using laser measuring equipment and marking paint for project element placement.
- Reduced wasteful spending by accurately cutting materials according to specifications.
- Advised officials regarding traffic-control measures to protect work site integrity, crew safety and general public welfare.
- Collaborated with craft teams to complete large-scale construction projects.
- Used drills and other power tools safely to complete job tasks.
- Maintained orderly work environment by removing trash and sweeping up debris.
- Loaded materials, equipment and tools onto trucks and secured for transport to job sites.
- Sustained safety protocols to maintain secure, proper handling of equipment and materials.
- Assembled and secured ladders and scaffolding on job sites.
- Applied caulking materials to windows and doors to seal against water and air.
- Assisted roofers with repair work, including nailing insulation and shingles and pouring asphalt.
- Addressed and resolved on-site problems to keep teams on-task and avoid development of larger concerns.
- Identified safety issues and immediately notified foreman for remediation action.
- Dug trenches using backhoes to prepare ground for construction projects.
- Directed traffic around construction areas and obstacles to keep road crews safe.
- Assessed malfunctioning equipment and repaired parts to keep machinery operational.
- Repaired skid loader and mini excavator equipment to keep machines operating efficiently.
- Sewer and water work.
- Foundation repairs.
High School Diploma: , Expected in 05/1992
-
Wisconsin Lutheran High School - Wauwatosa, WI,
GPA:
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
How this resume score
could be improved?
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:
- Length
- Personalization
- Strong Summary
- Target Job
- Typos
- Word Choice