LiveCareer-Resume

ironworker foreman resume example with 1+ years of experience

JC J S S JS J S S JS J S S JS J S S JS J S S JS J S S JS
Jessica Claire
, , 100 Montgomery St. 10th Floor (555) 432-1000, resumesample@example.com
Summary

Professional Site Manager with proven proficiency in OSHA compliance, internal and external communications, crew supervision and cost control. Committed to on-time project completions, cost effective budgeting and superb work quality.

Skills
  • Active listening
  • Troubleshooting
  • Communication
  • Materials estimating
  • Work ethic
  • Coordination
  • Reliable and trustworthy
  • Blowtorches and equipment
  • MS Office
  • Basic math
  • Planning
  • Problem resolution
  • Accurate reporting
  • Plant design
  • Strategic planning
  • Piping design
  • Supervisory skills
  • Troubleshooting abilities
  • Electrical troubleshooting
  • Onboarding and coaching
  • Crew oversight
  • Antenna equipment
  • Waterproofing techniques
  • Employee training
  • Scaffolding set up
  • Tower crew management
  • Forklift operation
  • Blueprint analysis
  • Supply ordering
  • Managing supplies
  • Preventive maintenance
  • Scaffold building
  • Crew direction
  • Company safety procedures
  • Interpersonal and written communication
  • Documentation skills
  • Petrochemical management
  • Fall protection
  • Underground mining
  • Improved field methods
  • Cost control policies
  • Hand and power tools
  • Commercial roofing systems
  • Construction liaison
  • Construction safety
  • Job site management
  • Pipe plan sequencing
  • Roofing repair work
  • Report writing
  • Commercial plumbing
  • Blueprint reading
  • Construction management
  • Project deadlines
  • Company safety policies
  • Analytics
Experience
10/2019 to Current Ironworker Foreman General Dynamics | Hurlburt Field, FL,
  • Received structural steel and moved it to modular locations.
  • Performed layout and set up blocking in mod footprint.
  • Assessed blueprints and specifications to determine all aspects of the project before work started.
  • Safely used metal shears, hacksaws, bar cutters and other tools to cut metal components for installation.
  • Operated cranes appropriately to hoist metal components into required areas.
  • Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.
  • Supervised crew members in proper steel placement in [Type] locations.
  • Encouraged all workers to take precautions to prevent mishaps and injuries on job.
  • Identified problems that occurred on the job and took cost-saving measures to provide resolution.
  • Studied blueprints, drawings and specifications to determine the layout of work.
  • Removed and replaced existing grating and structural steel with [Type] and [Type] materials.
  • Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts using simple torque and [Type] tools.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Identified reinforcing rod quantities, sizes and locations from blueprints and informal instructions.
  • Trained [Number] apprentices on-the-job in every aspect of reinforcing ironwork.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
to Ironworker Foreman Core Industrial & Supply LLC | City, STATE,
  • Received structural steel and moved it to modular locations.
  • Performed layout and set up blocking in mod footprint.
  • Assessed blueprints and specifications to determine all aspects of the project before work started.
  • Safely used metal shears, hacksaws, bar cutters and other tools to cut metal components for installation.
  • Operated cranes appropriately to hoist metal components into required areas.
  • Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.
  • Supervised crew members in proper steel placement in [Type] locations.
  • Encouraged all workers to take precautions to prevent mishaps and injuries on job.
  • Identified problems that occurred on the job and took cost-saving measures to provide resolution.
  • Studied blueprints, drawings and specifications to determine the layout of work.
  • Removed and replaced existing grating and structural steel with [Type] and [Type] materials.
  • Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts using simple torque and [Type] tools.
  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Constructed, assembled and secured steel bars reinforcing concrete structures in [Number] buildings and [Number] bridges in [Number] states.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Reinforced concrete via cables and pre-and post-tensioning techniques on arenas and parking garages.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Identified reinforcing rod quantities, sizes and locations from blueprints and informal instructions.
  • Trained [Number] apprentices on-the-job in every aspect of reinforcing ironwork.
to Structural Foreman D&L Supply Company | City, STATE,
  • Recorded supplies, parts, equipment and employee work hours for every job.
  • Reported to [Job title]s each [Timeframe] with project updates and estimated completion dates, noting any delaying issues.
  • Created team member schedules and delegated individual assignments for work crew.
  • Reviewed project blueprints and specifications to determine number of [Job title]s needed to complete job.
  • Supported budget and project goals by keeping balanced inventory.
  • Maintained high standards of safety, productivity and quality for every job.
  • Reported to supervisors weekly regarding project progress, site problems and labor status.
  • Conferred with other managers, technical personnel and team leaders to coordinate efficient site work and maintain tight schedules.
  • Supervised material usage and contractor hours to keep projects in line with budgets.
  • Implemented onsite safety protocols and procedures and properly trained all team members on prevention measures, effectively reducing injuries [Number]%.
  • Complied with federal and company regulations to maintain high level of safety at all job sites.
  • Delegated duties to each employee based upon his or her skills set and monitored progress daily.
  • Estimated materials and labor requirements to complete jobs within budgetary and timeline requirements.
  • Determined optimal construction requirements and site plans.
  • Motivated and supported field workers completing work to increase work quality and efficiency.
  • Obtained specifications and directed work for multiple construction crews.
  • Analyzed job sites daily to mitigate risks for workers and visitors.
  • Mitigated project downtime by effectively managing, scheduling and dispatching technicians for on-site repairs.
  • Assigned work to employees based on project requirements and individual team member strengths.
  • Created [Timeframe] schedules and disseminated to employees, giving [Type] projects adequate coverage.
  • Mentored [Job title]s and implemented training in [Task] and [Task] improving productivity [Number]%.
  • Led worksite preparation and project planning for smoothly run jobs.
Education and Training
Expected in 08/2005 to to High School Diploma | Te Puke Higschool, New Zealand, GPA:

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Te Puke Higschool

Job Titles Held:

  • Ironworker Foreman
  • Ironworker Foreman
  • Structural Foreman

Degrees

  • High School Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: