Test technician with over 6 years of successful experience in electrical and mechanical rigging and testing. Recognized consistently for performance excellence and contributions to success in manufacturing industry. Strengths in mechanical and electrical maintenance and repair. Backed by training in electronics and troubleshooting.
Skills
Mechanical and electrical systems Testing
Strong communication
Mechanical and electrical systems troubleshooting
Customer service
MS Office
Extremely quick learner
Familiarity with hydraulic repair
Project Management
Work History
02/2016 to CurrentAircraft Test TechnicianBoeing | Everett, WA,
Maintained excellent attendance record, consistently arriving to work on time.
Analyzed engineering drawings and schematics to troubleshoot systems and diagnose solutions.
Operated power tools, gauges and testing equipment to adjust, repair and replace faulty components in aircraft.
Serviced aircraft systems, including electrical, pumps and air handling.
Removed components such as landing gear, engines and flight control.
Lubricated shafts, bearings and gears to maintain optimal performance.
Diagnosed faults and developed resolution plans.
Removed and installed aircraft subsystem assemblies such as engines, rotors, gearboxes, transmissions and mechanical flight controls.
Performed thorough visual and physical inspections of all electrical parts.
Utilized testing equipment such as oscilloscopes, ammeters and ohmmeters.
Maintained numerous technical certifications, including hydraulic and electrical.
Conducted tests on electronic components, products, assemblies and systems to determine functional performance.
02/2020 to 06/2020Manufacturing ManagerJohnson & Johnson | Lawrenceville, GA,
Worked with senior leadership to complete under-budget management on complex issues.
Coordinated company projects and programs that supported manufacturing function.
Managed personnel by implementing company policies, procedures, work rules and disciplinary action.
Anticipated and addressed production problems, material shortages, equipment malfunctions and unavoidable delays.
Analyzed and determined resolutions to multi-faceted issues that affected management and business objectives.
Coordinated procedures for facility and equipment maintenance or modification, including replacement of machines.
Applied lean principles to improve workflow and quality and reduce waste.
Minimized resource and time losses by addressing employee or production issue directly and implementing timely solutions.
Maintained clean and well-organized production areas to avoid violations or unnecessary work delays due to hazards or inefficient layouts.
Evaluated employee skills and knowledge regularly, providing hands-on training and mentoring to individuals with lagging skills.
Wrote process, employee and production schedules.
Supervised team of 18 Test Technicians, keeping production schedules on track to meet tight deadlines.
03/2014 to 02/2016Factory Service AttendantBoeing | Hazelwood, MO,
Mixed, used and properly stored hazardous chemical cleaners to reduce risk of injury or illness.
Followed procedures for use of chemical cleaners and power equipment to prevent damage to floors.
Responded immediately to calls from personnel to clean up spills and wet floors resulting from ceiling leaks and plumbing problems.
Operated street sweeper and scrubber equipment in largest factory in world using all manufacturer safeguards.
Cleaned, vacuumed and dusted all areas of building to maintain organized, professional appearance for employees and clients.
Worked with building managers to assess ongoing needs and plan preventive maintenance and cleaning schedules.
Promoted building security by locking doors and checking electrical appliances for safety hazards.
Carried linens, towels, toilet items and cleaning supplies using wheeled cart for maximum efficiency.
Checked in and stocked inventory throughout facility.
Sanitized 8 bathrooms, showers and locker rooms
05/2012 to 03/2014Deburr Technician Lead.Aerospace Manufacturing Tech | City, STATE,
Followed technical documentation, including tooling instructions and product specifications to determine and implement operational sequences.
Maintained equipment performance by completing routine maintenance actions such as lubricating and cleaning components.
Used work instructions and measuring tools to check specifications of finished items.
Developed and trained team members by leveraging industry experience to achieve optimal project strategy.
Provided team with coaching and direction.
Updated operational methods, oversaw accounting procedures, tracked information and compiled data to improve efficiency.
Leveraged Lean Six Sigma expertise to reduce waste and enhance productivity.
Planned, scheduled and delegated deburr daily work to team of over 3 employees.
Education
Expected in 06/2015Certificate | CATIA 3D Design SoftwareCity University of Seattle, Seattle, WAGPA:
Expected in 10/2014Certificate | Electronics And TroubleshootingEverett Community College, Everett, WAGPA:
Expected in 06/2011High School Diploma | General StudiesClaire Homeschool, Arlington, WA, GPA:
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.
How this resume score could be improved?
Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume: