LiveCareer-Resume

technician resume example with 20 years of experience

Jessica Claire
Montgomery Street, San Francisco, CA 94105 609 Johnson Ave., 49204, Tulsa, OK
Home: (555) 432-1000 - Cell: - resumesample@example.com - : - -
Summary

Acomplished and energetic Cleanroom Technician, with over 25+years of solid history of Robotic drives,actuators,and microcontrollers.Ability to read and interpret highly complex drawings and schematics.

Knowledge of electromechanical systems, Expertise include setups and operation, RF test equipment for sub assemblies

Skills
  • Equipment maintenance
  • Six Sigma Methodologies
  • Maintenance and repair
  • Quality control
  • Manufacturing processes
  • Dial/Digital/Vernier Calipers
  • RF Dummy Load (FECVD)
  • Equipment cleaning and maintenance
  • Mechanical equipment control
  • Customer service
  • Microsoft Office
  • Work ethic
  • Equipment inspection
  • Microcontroller expertise
  • Root cause analysis
  • Friendly, positive attitude
  • Critical thinking
  • Hardware analysis
Experience
06/2020 to Current
Technician Hyatt Hotels Corp. Charlotte, NC,
  • Set up and verified functionality and availability of safety equipment for Technician's
  • Managed quality control and maintained high level of customer satisfaction.
  • Inspected equipment and systems to identify issues and reported problems to repair technicians.
  • Set up, configured and monitored safety equipment for use by technical personnel.
  • Certified for Calibrating B.A.P.A
  • Monitor SPM Optics Test
  • Audit Chiller levels and reported results back to management
  • Audit Fixtures and Calibration tools for defects
01/2016 to 12/2018
CNC Technician Bay Photo Lab Santa Cruz, CA,
  • Completed job setups and documented set up information for production recordkeeping.
  • Helped with routine machine maintenance such as dressing wheels, rollers and blades.
  • Organized production and machine supplies for easy retrieval.
  • Kept machinery operating well to precisely drill, tap and shape steel or aluminum.
  • Supported operators with identifying, diagnosing and resolving machine failures.
  • Assisted production supervisor with handling problems, reducing downtime and troubleshooting mechanical problems.
  • Performed routine maintenance on machines and monitored usage to reduce parts breakdown.
  • Conducted equipment tests and inspections and made adjustments to maintain safety and functionality.
  • Worked from layout and work order, created programs and set up machines to produce required parts.
  • Adhered closely to equipment safety practices to reduce accidents.
  • Monitored and adjusted processes or equipment to improve quality and productivity.
  • Set up, adjusted or operated basic or specialized machine tools to support precision machining operations.
  • Set-up and operated lathes, mills and grinders to cut raw materials.
  • Handled all delegated tasks on night shift.
04/2010 to 10/2013
Sub-Assembly Technician Cryogenic Industries Murrieta, CA,

Displayed exceptional professionalism at all times, promoting positive representation of company and operations in every interaction.

  • Installed : Vector,Altus,Sabre, Chamber components as part of sub assembly
  • Inspected Chambers to verify proper functionality and applied strong mechanical and maintenance skills toward troubleshooting and resolving any encountered issues.
  • Conducted in-depth inspections of semiconductor equipment to verify functionality and identify maintenance and repair issues.
  • Used Helium to check for leaks within the system chamber and gas lines.
  • Smoothed surfaces to enhance alignment of parts and finishes.
  • Inspected and tested final products to verify conformance to established tolerances.
  • Checked parts against stock lists, blueprints and material specifications to verify compliance with standards.
  • Positioned and aligned Chamber Pedestals,actuators
  • Verified accurate assembly work.
  • Assisted assessment of finalized product development to maintain QC standards.
12/1994 to 08/2007
Mainframe Technician Sun Microsystems Inc. City, STATE,
  • Installed software and test équipement along with new and replacement parts.
  • Tested components, assemblies and systems to diagnose problems.
  • Installed and maintained control systems and other technical components to complete equipment installations.
  • Evaluated new engineering plans to check technical feasibility and conformance with applicable codes and standards.
  • Worked from complex and detailed manufacturing documentation and verbal instructions.
  • Interpreted equipment manuals and manufacturer instructions to install and troubleshoot devices.
  • Demonstrated excellent mechanical knowledge of machines and tools, including design, use, repair and maintenance.
  • Set up and operated production equipment in accordance with good manufacturing practices and SOPs.
  • Performed evauluations diagnostics,troubleshooting and evaluations
Education and Training
Expected in 05/1991 to to
High School Diploma:
Holtville High School - Holtville, CA
GPA:
Expected in to to
:
Monterey Penninsula College - Monterey , CA
GPA:

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Holtville High School
  • Monterey Penninsula College

Job Titles Held:

  • Technician
  • CNC Technician
  • Sub-Assembly Technician
  • Mainframe Technician

Degrees

  • High School Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: