Livecareer-Resume
Jessica
Claire
resumesample@example.com
(555) 432-1000,
Montgomery Street, San Francisco, CA 94105
:
Professional Summary
Highly effective management professional emphasizing innovation and creativity in solving complex problems. Energetic and results-focused with success in developing and leading diverse teams to achieve outstanding results. Proactive,highly organized,focus and self starter employee,productive as part of the team and always eager to assume new projects or responsibilities
Skills
  • Project planning and development
  • Budgeting and forecasting
  • Process improvement
  • Quality assurance and control
  • Organized
  • Advanced training in SAP
  • Unsurpassed work ethic
  • Results oriented
  • Dependable
  • Fluent inspanish
  • Startups and turnarounds background
  • Detail-oriented
  • Team Management
Education
Indiana State University Terre Haute, IN Expected in – – Master of Science : Industrial and Professional Technology - GPA :
Indiana State University Terre Haute, IN Expected in – – Bachelor of Science : Industrial and Professional Technology - GPA :
Work History
Interfor - New Hope Power Plant Maintenance Manager
Dequincy, LA, 04/1997 - Current
    Responsible to oversee all aspects of the Maintenance Department by prioritizing Safety/Environmental compliance. Managing efficient plans, schedule and logistics for reliable and continuous operation of biomass plant which includes 3 biomass boilers; 2 steam turbines/generators; material handling of biomass products; instrumentation, electrical; rotative equipment and civil.                                                                                                                                       Reported directly to the Plant manager.                                                                                                                Supervised a team of 4 area managers and 14 associates.                                                                                      Managed capital funding requests of up to $9.5million from project approval to project closeout. Established project control procedures such as project forecasts and cash flow projections.                                                                              Managed budget of $8.2 million for the repairs and daily maintenance, for outages, PM routine work and emergencies.                                   Coordination with engineering departments for ROI projects major replacements and additions.                                                                                       Directed the work of about 12 independent contractors during planned outages. 




  • Managed a [Number]-million square foot office space employing [Number] workers.
  • Managed a [Number]-million square foot office space employing [Number] workers.
  • Conducted [Analysis type] analysis and incorporated findings by [Action taken].

(P.D.V.S.A.) AMUAY OIL REFINERY - Maintenance Superintendent
, STATE, 1986 - 1997
Mechanical field execution supervisor, responsible for major unit turnarounds. Include monitoring and reporting, cost control, material control and contracts administration plus personnel administration in high intensity fast track environment. Other responsibilities included safety and quality improvement teamwork coordination. Mechanical field planning leader, responsible for supervision of planning and scheduling activities for major units in the plant. Monitor contractors and report turnarounds status to upper management. Senior planning and scheduling engineer, responsible for providing assistance in analysis and implementation of planning and control cost systems. Material planner, responsible for defining material needs, order processing and inventory levels for assigned projects. Contract administrator for turnaround repair contracts of mechanical, piping, rotary equipment and civil works; including bid estimating, documentation contract data analysis. QA/QC process engineer, involved in continued improvement processing of the Maintenance organization resulting in shutdown cost and time reduction.
Additional Information
Helped implement the use of SAP throughout the maintenance and planning department as well as the finance and accounting department for proper integration. High level of skills on MS Office (Word, Excel, Power Point)Safety and Environmental sensitive to perform excellency and help team members refocus to accomplish organizational goals as required.

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Disclaimer

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score
could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

78Average

resume Strength

  • Length
  • Personalization
  • Strong Summary
  • Target Job

Resume Overview

School Attended

  • Indiana State University
  • Indiana State University

Job Titles Held:

  • New Hope Power Plant Maintenance Manager
  • Maintenance Superintendent

Degrees

  • Master of Science
  • Bachelor of Science

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in: