Livecareer-Resume

Home Improvement Sub Contractor Resume Example

Love this resume?

By clicking Build Your Own Now, you agree to our Terms of Use and Privacy Policy

Jessica Claire
Montgomery Street, San Francisco, CA 94105
Home: (555) 432-1000 - Cell: - resumesample@example.com - -
Professional Summary

Currently a licensed home Improvement contractor. But skilled in many areas of construction and engineering. I am Highly ambitious and hardworking with strong background in management, supervision, training sales, payroll, marketing and advertising and excellent customer service.

Skills
  • Subcontractor management
  • Knowledgeable in construction safety
  • Best building practices
  • Built my company's construction website www.tmconstruction06.com
  • Project management skills
  • Driving commercial vehicles
  • Industry safety equipment
  • Project scheduling
  • Power and hand tools
  • Knowledge of manufacturing standards/regulations
  • Proficiency at reading blueprints
  • Works well independently
  • Safety management
  • Extensive experience with customer service and sales
  • Troubleshooting expert
  • Basic computer skills
  • Interior and exterior renovation
  • Scaffolding
  • Fall Protection Plan (FPP)
  • Good multitasker
  • Building systems and services
  • Engineering drawings/standards
  • Efficient with all painting tools
  • Safety procedures knowledge
  • Start to finish home construction
Work History
01/2012 to Current
Home Improvement Sub Contractor American Security, L.L.C. Inver Grove Heights, MN,
  • Roofing Installations and repairs- Asphalt Installation process install water resistant felt paper and ice and water shield, run start shingles around perimeter of roof and valleys, Make sure seams are always staggered 6 inches at minimum, install metal in valleys or California cut shingles in valleys. install metal step and counter flashing, install hat vents, pipe boots and ridge vent
  • Trim installation- Engineered Wood Fiber, Pvc trim, Fiber cement trim, crown molding, base trim, window and door casings. Installation process use trim nails and or glue
  • Doors Installation/ repairs- pre-hung doors, pocket door, french doors and sliding glass doors. Interior and exterior doors. Installation process caulk or foam all gaps and proper installation of tape on exterior
  • Windows Installation and repairs- vinyl, wood replacement windows. Installation process caulk or foam all gaps and proper installation of tape on exterior
  • Siding Installation and repairs- vinyl, wood, cedar shake, hardy plank. Installation process make sure seams are staggered at least 16 inches, make sure the laps cant be seen, make sure all panels are level and corners are plum.
03/2006 to Current
Owner/ Operator TM Construction City, STATE,
  • Renovations-
  • Framing- built to blue print drafts with joist and wall studs set 16 inches or 2 foot on center and built to scale, we pull tape on walls to ensure walls are square and plum, Install proper micro lamb beams to building code to support all load bearing points
  • Roofing Installations and repairs- Asphalt Installation process install water reisitant felt paper and ice and water sheild, run start shingles around perimeter of roof and valleys, Make sure seams are always staggered 6 inches at minimum, install metal in valleys or California cut shingles in valleys. install metal step and counter flashing, install hat vents, pipe boots and ridge vent
  • Metal- Installation process panels can be used in both new construction andre-roofing applications. It is recommended that the metalpanels be installed over plywood, wood decking , or intermittentsupports (wood or metal purlins).For installation over plywood or wood decking, cover theentire roof with a minimum of 30 lb felt paper. Begin atthe eave and roll the felt horizontally (parallel to theeave). Allow each consecutive course to overlap theprevious one by 3 inches. Overlap the end a minimum of6” when starting new roll of felt. Replace or repair areasof the felt paper that have been torn or cut.
  • Rubber roofing
  • Fencing Installation and repairs- Wood - privacy or split rail or picket, vinyl - privacy or split rail or picket, metal - chain link, iron rod. Installation process install post at minimum of 2ft in ground secured with a bag of concrete per hole, String all posts to ensure straight line and measure distance for each post, install panels with 6 screws per panel to ensure proper hold. make custom or install pre-fab gates and install all hardware such as hinges and mounting brackets and locks and latches.
  • Flooring- install vinyl, wood, tile, marble, laminate,
  • Drywall Installation/ finishing and texturing ceilings. Installation process glue to studs and screw to each stud
  • Painting and staining on interior and exterior of homes,
  • Trim installation- Engineered Wood Fiber, Pvc trim, Fiber cement trim, crown molding, base trim, window and door casings. Installation process use trim nails and or glue
  • Doors Installation/ repairs- pre-hung doors, pocket door, french doors and sliding glass doors. Interior and exterior doors. Installation process caulk or foam all gaps and proper installation of tape on exterior,
  • Windows Installation and repairs- vinyl, wood replacement windows. Installation process caulk or foam all gaps and proper installation of tape on exterior,
  • Siding Installation and repairs- vinyl, wood, cedar shake, hardy plank. Installation process make sure seams are staggered at least 16 inches, make sure the laps cant be seen, make sure all panels are level and corners are plum,
  • Cabinets Installation and repairs- pre-finished and unfinished cabinet. Installation process and make sure to level and shim properly
  • Counters top installations- of marble, granite, laminate. Installation process glue and shim to level and weight to secure a proper seal
  • Black splash Installation- marble, granite. Installation process glue or grout to secure hold
  • Vanities- Installation process screw and glue to studs and then caulk around exteriors on wall
  • Toilets- Installation process make sure wax ring has a good seal and toilet bolts are secure and then install cold water line to toilet tank
  • Light fixtures- Installation process make sure you have good connections with hot/ natural/ground wires and all wall mounts or ceiling mounts are secure
  • Reviewed plans and specs during the schematic design of pre-construction
  • Coordinated utility service providers according to project schedules
  • Obtained building and specialty permits from local jurisdictional agencies
  • Scheduled all contractors and materials deliveries

Our website www.tmconstruction06.com

02/2004 to 08/2008
Site Supervisor U.S. Security Associates, Inc. City, STATE,
  • Managed safety and security of location to prevent intrusion, criminal activity, vandalism and injuries to workers
  • Delivered accurate verbal and written reports to company personnel
  • Patrolled commercial property and the associated parking garage
  • Trained all new hire security officers
  • Managed hours and scheduling of each officer on my site
  • Responded quickly and effectively to all security violations and duress alarms
  • Checked all baggage using X-ray machines, metal detectors and Garrett wands
  • Collected and organized all surveillance data and information to protect client possessions and workspaces
  • Verified each individual’s right to enter restricted areas and denied access to unauthorized persons
  • Monitored alarm systems to detect any unauthorized entries into protected areas
  • Noted and followed up on any unusual behavior
  • Detected and apprehended any unauthorized personnel
  • Monitored building access and identified all officials and employees before authorizing their entrance
  • Investigated all security and safety violations
  • Monitored security camera system day and night to protect lives and property
  • Responded to calls in both routine and emergency situations
05/2003 to 08/2005
Trainer/Lead Expander Superior Fibers LLC City, STATE,
  • I was qualified on every job in the plant
  • Expanded fiberglass mats (pull fibers apart to make them expand in size before processing through furnace oven)
  • Relieved each individual for breaks while I performed their duties
  • Trained all new hires
  • Operated forklift, motorized tow dollies, crain hoist's
  • Emptied hoppers with forklift
  • Oversaw daily operations at site, keeping team production moving at an optimal pace
  • Ensured to meet our quota each day
  • Worked under very humid conditions 120 to 130 degrees in plant
  • Maintained safe and clean work place
Education
Expected in 2004
High School Diploma:
Fairfield Union High School - 6675 Cincinnati Zanesville Rd NE, Lancaster, OH 43130
GPA:
  • Shop/ drafting classes and courses 
  • Coursework in Mechanical Drawing and Computer Aided Drafting and Design
  • Coursework in Basic Communication and Employability Skills
  • Coursework in Reading Plans and Site Layout

By clicking Build Your Own Now, you agree to our Terms of Use and Privacy Policy

Disclaimer
Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

73Average

Resume Strength

  • Personalization
  • Target Job

Resume Overview

School Attended
  • Fairfield Union High School
Job Titles Held:
  • Home Improvement Sub Contractor
  • Owner/ Operator
  • Site Supervisor
  • Trainer/Lead Expander
Degrees
  • High School Diploma