Professional Summary

My Engineering Co-Op with Total Petrochemicals, provided understanding of the oil and gas industry and developed skills of data analysis and system implementation. I provided an economic analysis case study on the implementation of new sampling systems to account for mass loss. With TIC Southern as a Project Controls Engineer, I learned the construction process for downstream and midstream projects in the oil & gas industry. I developed schedules and proposals using this process on jobs ranging from 10M to 300M dollars. As a Field Engineer for TIC Southern, I managed and supervised piping crews at the GCGV (ExxonMobil /SABIC) Olefin's Recovery Project. Specifically my scope of work was the propylene & ethylene compressor shelter building piping. We planned and managed the install of 6 miles of pipe into a 170ft by 70ft building. This plant is set to be the largest Ethane Cracker in the world at 1.8 MTA. At this project we installed the worlds largest-land based modules and effectively implemented system based turnovers to meet schedule constraints while construction continued on other local systems. Seeking an opportunity to further my skill set incorporating my degree in engineering and knowledge in the oil and gas industry.

Skills
  • Microsoft Excel
  • Primavera P6
  • Power BI
  • Construction Management
  • Refining Process
  • Aspen Pro Process Software
  • Hexagon Smart Completions
  • Navisworks Model Software
  • C++
  • Lean Principles Knowledge
  • Data Analysis
Work History
09/2019 to Current Field Engineer Great Southwestern Construction | Fort Worth, TX,
  • Supervised and managed piping crew of 35 employees in a Propylene & Ethylene compressor shelter.
  • Performed hazard analysis of work during construction and ensure all safety rules and regulations are followed
  • Communicated and monitored quality requirements to crew to reiterate inspection test plan hold points
  • Planned one week and three week schedules for crews and submit material requests based on schedules to establish Just In Time (JIT) management techniques
  • Assisted in creation and execution of system turnover packages using P&ID's to establish boundaries of systems
  • Reported progress of construction, crews performance, and reviewed productivity for accuracy and proper schedule updating.
  • Assisted in creation of purchase orders and approval of vendor invoicing
  • Helped with crew specific tasks such as equipment planning, change orders, daily timesheets, scaffold needs, and engineering issues.
  • Helped ensure project design information are logged and documented in a timely manner.
  • Empower people to use stop work authority to ensure nobody gets hurt
  • Coordinated with all disciplines planning work in similar area to ensure safety and productivity to meet schedule needs.
  • Observed operations to implement actions for improvement and communicated expectations to team to ensure all members of crew are onboard
  • Encouraged feedback from crew on all aspects of work to promote buy in from planning to execution of work
11/2018 to 01/2019 Project Controls Engineer Charah Solutions, Inc. | North Bend, OH,
  • Organized and designed work packages using Advanced Work Packaging (AWP) best practices.
  • Identified tools, equipment, and materials needed for work package scopes.
  • Aligned the created work packages to master schedule and compared estimate costs vs actual costs.
  • Assisted in constructability reviews to establish unit rates and feasibility of engineering and schedule constraints
  • Created estimate schedules In Primavera P6 and drafted estimate proposals for bid submissions
  • Determined contract requirements and milestone dates and created relationships to meet client schedule milestones
  • Created baseline schedules that are resource loaded and used work breakdown structure for formatting
  • Managed and updated schedules to match detailed site operations 90 day and 3 week schedules.
  • Validated baseline schedules by fixing out of sequence relationships after update has been initiated to create accurate as-built schedules.
  • Captured changes and delays to show impacts to work and created an accurate forecast to develop mitigations for any delays.
08/2017 to 06/2018 Process Engineering Co-Op Student Total Petrochemicals & Refining USA Inc. | City, STATE,
  • Reduced mass loss with implementation of a sampling system to account for product loss.
  • Determined mass loss existed through data analysis techniques.
  • Found that 40% of overall loss could be accounted for with a better sampling systems.
  • Researched sampling systems and generated multiple alternatives.
  • Contacted experts on sampling systems and benchmarked peers.
  • Calculated an economic analysis on project to determine best choice overall.
  • Identified best alternative solutions for the company that fit budget and constraints.
  • Learned best practices for loss control in crude, natural gas imports, coke, flare, fuel gas, and inventory changes.
Education
Expected in 05/2018 Bachelor of Science | Industrial Engineering Lamar University, Beaumont, TX GPA:

GPA: 3.4

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Lamar University

Job Titles Held:

  • Field Engineer
  • Project Controls Engineer
  • Process Engineering Co-Op Student