》》Jessica. Power plant CONTROL OPERATIONS. Leadership+Strategy.

DUTIES:

  • Manage crews 》All Operators, maintenance, electrical , millwright work, and MSHA safety functions
  • Develop and assist regional groups with desk operating procedures.
  • Trained: NERC compliance standards.

》》》STATIONARY ENGINEER 2. Safely started up boilers as needed. Based on demand needs of facilities. Well versed with permissives. On manual and automatic fired high-pressure steam or high temperature hot water boilers and/or gas turbine generator sets and heat recovery steam.

》》》#2 BoilerTender/Building Eng. : Operated and maintained follow through inspections on the regular. Tests boiler water, condensate, cooling tower water, and water from other systems, and adds corrective chemicals.

____________________________

Skills
  • 9 YEARS SUPERVISORY EXPERIENCE : The Leading #1 Operator on graveyard-Shift. Highest available rank inherited supervisory duties when No Dept. Supervisor was available. Over 9yrs stepping in and out supervisory roll.
  • Assisted in developing and implementing safety plans when working in confined spaces.
  • LEADERSHIP+STRATEGY: When there is a need for help. Offering An effective change is the way. Example: Assisted facility, Change strategies to keep Documenting Data, Submitting Timely Reports And Log Updates on time and in regular schedule. Less down time on equipment. Maintenance work orders. Pushed the on point theme.. to the next employee and so on. On the ready.. and on point. RESULT: Smooth Communication Flow. PROACTIVE MAINTENANCE. When Scheduling And Carrying Out Preventive, Predictive And Corrective Maintenance Procedures. ON TIME. LEADS to smooth operations.
  • | NERC || REQUIREMENTS°TRAINED
  • Well versed: MCC/VFD RESETS/Install troubleshooting including the ability to read one-lines, Identify components in control panels. Well versed with automation controls+Pneumatics systems. Led/M Successful
  • PLANNED/SHUTDOWNS: 15yrs experience. Assisted in developing and implementing safety plans when working in confined spaces.
  • TRAINED: w/GAS BURNER REPAIRS/PHOTO EYE UPGRADES. Fire/Hole watch trained. BOILER: Water, Air lockout trained. Electrostatic precipitator Lock out trained.
  • STANDARD OPERATING PROCEDURES: Involved In The Update Of Various SOP Documents. Helped our team members and other stakeholders stay on the same page as us. We then moved forward in a singular, cohesive manner. This Led to many years of Operational success.
  • WATER CHEMISTRY TRAINED: Reliable and proficient when bringing proven chemistry skills in water quality management. Clarifies and purifies water with expert management of automated systems. Maintains equipment and responds promptly when water chemistry LEVELS off point.
  • SUBSTATION MAINT: Fredonia/Hi-Volt SUBSTATION. HELPED W/Maintaining substation inspection program and keep accurate logs on all assigned substations batteries.
  • Assisted certified technicians in wiring and installing control panels for Fredonia Substation. Along with keeping production area clean and organized.
  • Experience in MCC troubleshooting: including the ability to read one-lines, Identify - pincomponents in control panels. Basic computer skills and the ability to follow both written and oral instructions.
  • MAINTENANCE: Air Quality Upgrades. ESP-Electrode Adj-Repairs. GAUGE Glass Repairs. Ro Unit Filter Swap. Air Ejector Condenser Rp/Swap.

___________________________________

》》SKILLS《《

  • Teambuilding
  • Basic Math
  • Critical Thinking
  • Maintenance & Repair
  • Communication
  • First Aid/Cpr
  • Analytical Thinking
  • Teamwork And Collaboration
  • Supervision & Leader
  • Mentoring
  • Training
  • Team Management
  • People Management
  • Powerpoint
  • Training & development
  • Work Planning and Prioritization
  • Data Analysis
  • Blueprints and Schematics
  • Problem Resolution
  • Time Management
  • Project Management
  • Engineering Design
Experience
05/2007 to 06/2022 Jessica Op. SPI Cogeneration Department | City, STATE,
  • Demonstrated Leadership By Making Improvements To Work Processes And Helping To Train Others. Juggled Multiple Projects And Tasks To Ensure High Quality And Timely Delivery.
    •Motivated And Encouraged Team Members To Communicate More Openly And Constructively With Each Other.
  • Maintained Updated Knowledge Through Continuing Education And Advanced Training.
  • Demonstrated Self-Reliance By Meeting And Exceeding Workflow Needs.Achieved Cost-Savings By Developing Functional Solutions To Highlighted Problems Like Fuel Efficiency.
  • Resolved Interpersonal Conflicts By Listening, Finding Common Ground And Building Relationships.Prioritized And Organized Tasks To Efficiently Accomplish Op. Goals.
  • Demonstrated self-reliance and made improvements to work load reduction due to man power being low (COVID19)
  • Increasedv situational training. All with out causing operational problems. Situational training became a major factor in making the most efficient crews/teams.
  • Maintained+Updated knowledge. Through continuing education and advanced training Worked closely with team members to deliver best practices resulting in minimal safety issues. Recorded lowest.
  • Prioritized and organized tasks to efficiently accomplish aw net his i operational goals. Achieved cost-savings by developing functional solutions to highlighted problems like fuel efficiency.

》#1 POWER PLANT CHIEF OPERATOR:

  • Many yrs of experience.. Control power-generating equipment. Natural gas/Bio mass Fuel. Very attentive on all points when taking over Ctrl Rm Op. On the ready for any mechanical failure that could take place. Updating charts periodically, meters, and gauges. Monitoring voltage and electricity flows Turbine/Generator adj when needed. Check equipment and indicators to detect evidence of operating/mech. problems.
  • Situational training and Experience has made me a seasoned Power Plant Operator. I am very well rounded with Control Rm Op: Communication and team-work, team-building and reliability+dedication to the success of all people involved in the Power Plant Operations. What i have found. These together make a strong united front in Power Plant Operations
  • Over 15 Years Of Experience In The Generation Engineering Field. Demonstrated Success In Co-generation Operations, Documenting Data, Submitting Timely Reports And Log Updates. Well-Versed In Scheduling And Carrying Out Preventive, Predictive And Corrective Maintenance Procedures. Familiar With Completing Routine Inspections And Correcting Abnormalities Or Escalating Larger Concerns.
  • #1 Op. Control Room Operator. Boiler-Turbine-generator, Technical Planning And Problem-Solving abilities @ high level due to 15 yrs experience.
  • I Have experience Performing Safe Startups, Monitoring Power Demand And Adjusting Systems To Maintain Output. Background In Renewable Cogeneration And Gas Fired Generation Plants.
07/2022 to 10/2022 Stationary Engineer 2 Sierra Pacific Industries | City, STATE,
  • Operated and maintained steam plant Facility. Rounds + follow through with inspections at regular basis.
  • Maintained order. With steam driven equipment, steam reducing stations, expansion tanks, air compressors, supply and exhaust fans, various kinds of pumps and valves, steam traps, water treatment systems, water heaters and other heating plant auxiliary equipment.

•Operated, Maintained repairs, and inspections reciprocating, centrifugal or absorption central air conditioning machinery including condensers, evaporators, cooling towers, pumps, purge tanks and related equipment.

•Adjusted, maintained, tests, and calibrated boiler and air conditioning machinery and mechanical, electrical or pneumatic control instruments and safety devices.

▪︎well versed with boiler water, condensate, cooling tower water, and water from other systems, and adds corrective chemicals.

05/2007 to 12/2007 #2 Building Engineer/Power Plant Technician SPI COGENERATION DEPARTMENT | City, STATE,

RELIABLE. HARDWORK+DEDICATION

Maint. Work & Vital Op.Training :

  • Hardwork+Team-building paved the way for me. I challenged myself and my Co-workers. To build on whatever understanding we can now. For a greater opportunity will be waiting tomorrow.
  • I also took advantage of filling the #1 op. Position when needed. I took the opportunity as they came. When Co-workers called in||Or just wanted a break.. i was there.. never missed a beat. When my #1op needed me.. i was there

I am well versed with:

  • NERC Requirements||ESP-Electrode Repairs||Water Chemistry Testing||Conveyor Maint. Work||DA System/Repairs||HP-Gauge Glass Repairs||High+Low Tank Sensor Switch Adjustments||w/Shutdown Plant||w/Start-Up Plant||General Maintenance Work||Operating Heavy Equipment.||Sop updates||
  • My Principal Duty: Be the eyes and ears of the team. Keep #1 Control Room Operator in the know of all aspects. As there is many moving parts around us. Control Room Operators are all-round with operations. So they are heard and acknowledged. Hourly Rounds Played a big roll on the long standing of all operations.
  • Team-building led by a couple of my peers and myself in the department. Well it pushed us to have allot of successful years. A great combination of people. We were a team of operators that pushed... and most certainly helped eachother reach that positive limit. Hardwork+Dedication.
  • I added to the #2 Op. Round Check list. Boiler||Turbine||Generator, and some auxiliary equipment.. & control valves were being missed and where not on R4R sheet. The add/Change This led to less down time.
  • I led many Successful & Impactful moments. That were resolved. As an outside ground #2 Operator. I followed orders from #1 Control Room Operator. levels from bottom to the top. Communication is key to success.
01/2007 to 05/2007 #3 Heavy Equipment Operator Company Name | City, State,

Successfully kept equipment in great shape. All equipment and vehicles such as oil changes, filter replacement, greasing all equipment every day, blowing off equipment and filters, checking for anything coming apart, wearing out, and replacing parts when needed.

organized scheduling for clean up duties.

• Guided the crew to complete jobs on time and informed head 》#1 Generation-Engineer Operator of species and wood waste/fuel source allocations and Bio Char Silo Level.
• Taught employee's to operate equipment safely such as wheel loaders, track loaders, excavators, grinders, and screening machines.
• I am highly motivated. I am always successful. In the best at anything i do. No time to waste.
•I organized scheduling for clean up duties. Keeping the work areas clean, safe and clear of debris. Became the normal Operation Zone.
Swept floors and assisted in keeping the work areas clean, safe and clear of debris.
• Performed daily and monthly maintenance of all equipment and vehicles.
• Performed equipment maintenance including repairs, servicing, and installation.

Education and Training
Expected in GED | Skagit Valley College, Mount Vernon, WA GPA:

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Skagit Valley College

Job Titles Held:

  • Jessica Op.
  • Stationary Engineer 2
  • #2 Building Engineer/Power Plant Technician
  • #3 Heavy Equipment Operator

Degrees

  • GED

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: