LiveCareer-Resume

quarry manager mining engineer resume example with 12+ years of experience

Jessica Claire
Montgomery Street, San Francisco, CA 94105 609 Johnson Ave., 49204, Tulsa, OK
Home: (555) 432-1000 - Cell: - resumesample@example.com - : - -
Summary

Ambitious Mining Engineer with exceptional experience in the mining industry and management, looking to find a company in the area where my education and experience could be an asset.

Skills
  • Materials estimating
  • Job site management
  • Team management
  • Safety oversight
  • Operational improvement
  • Team building
  • Equipment optimization
  • Maintenance scheduling
  • Mine design
  • Production scheduling
Experience
03/2016 to 07/2020
Quarry Manager/Mining Engineer Evolent Health, Inc. Detroit, MI,
  • Developed all safety and operating procedures used to optimize the quality and production of quarry blocks.
  • Helped with equipment purchasing based on the current state, and future predictions, of the companies demand for production.
  • Train employees in operating and safety procedures.
  • Delegate and monitor tasks to each employee based on personal skill set.
  • Set performance indicators and make adjustments to equipment to achieve desired quality and consistency.
  • Analyze job site daily to mitigate risks for workers and visitors.
  • Purchase and maintain inventory of all parts, tools and fluids.
  • Minimize downtime by effectively scheduling, performing, and monitoring preventive maintenance while working with vendors, technicians and employees to reduce time lost during breakdowns.
  • Collaborate with managers, and the sales team to determine short and long term production requirements
  • Report project progress and make adjusts to maintain scheduling.
  • Keep detailed inventory of material on hand and designate end use for the material based on quality, size, color, veining and current projects.
  • Develop short and long term mine plans based on current production needs and long term goals.
  • Coherently communicate plans with employees to improve employee motivation and maximize team productivity,
  • Estimated materials, equipment and labor requirements to complete projects within budget and timeline requirements.
  • Strive to set the standard for safety and quality in the dimensional stone industry.
08/2015 to 03/2016
Project Manager Csc West Orange, NJ,
  • Collaborated with quarry managers to draft project schedules and plans.
  • Prepared the future site of the new facility based on layouts.
  • Ordered, set up and troubleshot utility equipment to meet air, water and electrical requirements of purchased equipment.
  • Schedule equipment and labor with quarry supervisors to have new equipment installed in a safe and timely manner.
  • Dismantled, reassemble and make modifications to a used slabbing saw that still meets industry standards in cut tolerances.
  • Produced the first production projects of the new Phenix Marble Company while gaining a better understanding of the difficulties we were to face in the business endeavor.
  • Develop the safety and operating procedures for the new site based on brief experience and extensive research into the industry.
  • Created a training program for new hires that was more oriented in the stone cutting industry rather than a typical quarry operation.
  • Trained new hires on the safe operation and maintenance of the equipment with an emphasis on material handling and equipment-personnel interaction.
  • Read blueprints to determine production requirements, establish production flow charts and set daily production listing for the crew.
  • Monitor and make changes in daily production sequencing to meet the quality and demand of consumers.
  • Provide adequate quality control and assign limited materials to specified projects or uses to maximize yield and efficiency of operations.
  • Mentor a site foreman to adequately monitor and report on safety concerns, the flow of material, equipment performance and preventative maintenance.
  • Perform breakdown maintenance for Phenix and Willard Quarry.
  • Began planning of the reopening of the historic Phenix Quarry.
05/2015 to 08/2015
Intern Conco Companies City, STATE,
Claire
  • Assisted and learned from the experienced maintenance crew.
  • Performed daily maintenance tasks on the plant.
  • Complete inspections and reports to comply with MSHA regulations.
  • Gained hands on experience with material flow and processes in an aggregate quarry.
  • Minor downtime maintenance projects included conveyor belt splicing, replacing belts, changing idlers, flipping or replacing crusher liners, changing screens, rebuilding a belt tensioner, repair hoppers and replacing flashing.
  • Assist in planning and changing of bearings on primary crusher.
  • Assist in changing bearing on screen deck.
  • Develop new procedure for changing bearings on screen decks.
  • Assisted in rebuilding a tail pulley structure that failed.
04/2008 to 05/2015
Prior Experiences Construction And Factory Laborer City, STATE,
  • Part/Full time laborer and foreman for Claire and Sons construction.
  • Property Manager for Sigma Nu.
  • Factory laborer through Manpower.
  • Sales and customer service representative for Swiss Colony.
  • Server at Colton's Steak House.
Education and Training
Expected in 05/2015 to to
Bachelor of Science: Mining Engineering
Missouri University of Science And Technology - Rolla, MO
GPA:

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Missouri University of Science And Technology

Job Titles Held:

  • Quarry Manager/Mining Engineer
  • Project Manager
  • Intern
  • Prior Experiences

Degrees

  • Bachelor of Science

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: