LiveCareer-Resume

assistant installer resume example with 16+ years of experience

JC J S S JS J S S JS J S S JS J S S JS J S S JS J S S JS
Jessica Claire
, , 100 Montgomery St. 10th Floor (555) 432-1000, resumesample@example.com
Summary

Qualified Pipe Welder talented in flux core arc welding, gas tungsten and gas metal arc welding. Trained in high elevation work and experienced working on radio towers, water towers, structural steel and power generation infrastructure. Reputation for outstanding quality welds for difficult projects. Enthusiastic Welder with highly responsible nature and strong commitment to exceeding expectations for each job. Effectively prepare surfaces for welding actions by removing materials and setting up proper equipment. Strong hand tool and large shop equipment experience.

Skills
  • Blueprints and Schematics
  • Welding Skills
  • Welding
  • Repair
  • System Repairs
  • New Construction
  • Machinery
  • Power Tools
  • Residential and Commercial Installations
  • Forklift Operation
  • Hand Tools
  • Worksite Preparation
  • Construction Knowledge
  • Hoisting Equipment
  • Insulation
  • Power Saws
  • Grinders
  • Drill Presses
Experience
2/24/20 to 3/24/21 Assistant Installer Ferguson | North Highlands, CA,
  • Troubleshot malfunctions and diagnosed issues to get equipment back into service quickly and fully.
  • Followed safety guidelines for using tools, equipment and heavy machinery to avoid accidents and injury.
  • Reviewed daily schedules and work orders to determine supplies and materials needed for assignments.
  • Inventoried required material, tools and equipment to record product on-hand or to be ordered.
  • Applied knowledge of carpentry and general construction to complete attractive finish work.
2/14/06 to 1/24/20 Welder Rcn Telecom Services | New York, NY,
  • Sustained safety protocols and promoted proper, cost-effective and accurate handling of equipment and materials.
  • Combined welding techniques, knowledge of metallurgy and engineering requirements to produce quality work.
  • Heated, formed and dressed metal parts with hand tools, torch and arc welding equipment.
  • Scraped off excess spatter and other materials using portable grinders and arc-cutting equipment.
  • Laid out, positioned, aligned and secured parts and assemblies with straightedges and combination square sand calipers.
  • Set up and operated welding equipment to complete all welding projects on-time.
  • Adjusted weld machines to correct settings prior to weld applications for precision and waste reduction.
  • Prepared broken parts for welding by properly grooving and scarfing surfaces.
  • Adjusted gas flow and pressure to create and maintain desired flames.
  • Followed all safety guidelines, including proper machine guarding and lockout and tagout procedures.
  • Inspected chains, hammers and other tools for damage or wear to prevent injuries and accidents.
  • Assembled boiler parts and pressure vessels for structural use.
  • Inspected and repaired components to implement corrective action.
  • Laid out, fitted and fabricated metal components.
  • Conducted precision cutting with power saws, hand shears and chipping knives.
  • Positioned and clamped workpieces together and properly assembled in jigs and fixtures.
  • Cleaned and degreased weld joints and workpieces efficiently.
  • Operated manual and semi-automatic welding equipment to fuse metal segments together.
  • Set up equipment and welded parts according to welding chart specifications and type.
  • Prevented distortion of parts by monitoring fitting, burning and welding processes.
  • Maximized shop organization and equipment lifespan by maintaining equipment.
  • Obtained desired configurations by clamping and tack-welding components.
  • Removed loose materials and thick scale, slag or rust to prepare material surfaces for welding. Strengthened workflow by accurately welding pipe, plate, angle and tube steel connections.
04/2004 to 12/2005 Installer Sierra Concrete Design, Inc. | City, STATE,
  • Installed complete systems at new residential and business construction sites.
  • Troubleshot malfunctions and diagnosed issues to get equipment back into service quickly and fully.
  • Trained [Number] new team members to meet quality and efficiency standards for each project.
  • Removed existing [Type] systems and fixtures to prepare for replacements.
  • Read and comprehended technical documentation, checked measurements and reviewed site conditions to facilitate installation.
  • Demonstrated efficiency and dedication to quality by successfully contributing to over hundreds of completed jobs.
  • Inventoried required material, tools and equipment to record product on-hand or to be ordered.
  • Submitted detailed service order tickets to field supervisors department upon job completion.
  • Reviewed daily schedules and work orders to determine supplies and materials needed for assignments.
  • Delivered exceptional service to customers by answering questions and responding quickly to issues.
  • Maintained inventory of supplies, materials and tools needed to work on job sites.
  • Applied knowledge of carpentry and general construction to complete attractive finish work.
  • Completed daily appointment schedule to drive quality and timely service.
Education and Training
Expected in to to | Welding Technology Orange Coast College, Costa Mesa, CA GPA:

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • Orange Coast College

Job Titles Held:

  • Assistant Installer
  • Welder
  • Installer

Degrees

  • Some College (No Degree)

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: