LiveCareer-Resume

millwright resume example with 20+ years of experience

JC J S S JS J S S JS J S S JS J S S JS J S S JS J S S JS
Jessica Claire
Montgomery Street, San Francisco, CA 94105 (555) 432-1000, resumesample@example.com
Summary

To be engage in Oil & Gas Refining & Petro Chemical Company, in which my skill, proficiencies and my abilities will be enhance.

Technician skilled in troubleshooting technical issues with accuracy and speed. Trained in static and rotating equipment.

Highlights
  • Group Leader
  • Permit receiver
  • Certified Technician
  • MS Office proficient
  • Fluent in English
  • Proficient in repair and maintenance
Accomplishments

Group leader of more than 6 years in static and rotating equipment.

Experience
11/2007 to Current Millwright Cgb | Charleston, MO, KSA
  • Date: 2008 up to December 30, 2014 Work Experienced Summary, Duties & Responsibilities: Do blinding of static equipment during shut down and rotating equipment during removal of pump for replacing mechanical seal, heat ex-changer during cleaning of tube bundle, reactor, dryer, during replacing of C-balls tower for repairing trays and support, drums for replacing demister pod and coalecer and fiber film, installation of any kind of valve and any modification of piping job during emergency shutdown, blinding for furnace for replacing coil tube, adjustment of spring hanger support, cleaning of pilot tip and burner, blinding for flue gas cooler for repair refractory damage and manifold tube, removal of AMU,UMV,ZMV,FV,PV,TV for repair at valve shop and PZV.
  • Repair of steam tracing tube, replacing steam trap mechanism, clean suction strainer of pumps any product material, de-choked sampling point, Flow Transmitter, Pressure Transmitter, and level gauge chamber.
  • Replace mechanical seal, pump bearing, fin fan bearing, fin fan V-belt, adjustment fin fan blade, cooling tower fan blade adjustment, change oil of gear box, pumps, hydraulic pump of double disc slide valve, repair plunger pump, can pump, assisting for repairing of reciprocating compressor and turbine., do alignment pumps and motor, and gear box.
  • With extensive experienced in Testing & Inspection Planning & Execution for Mega Shutdown Turn Around in Rabigh Refining & Petro Chemical Company 2011 with the following response.
  • Assured that all working permits are approved before any task execution will be done.
  • Assured that all required Heavy Equipment are mobilized on the site assignment for work execution.
  • Assured that all Isolation Valve / Battery limit were Isolated & Tagged for safety measure before any job will be executed.
  • Assured that all required Material are prepared & ready for job execution.
  • Responsible in monitoring all daily activities accomplishment of the contractor being.
  • Submitted for Primavera Record for the following Static Equipment: Tower Reactor Driers Drums Heat exchanger With good & excellent experienced in Trouble Shooting & Repair of Rotating equipment during the Plant Operation & caused no delay for the following Plant assigned; Ethane Cracker & HOFCC Monomer I.
  • Working group leader the base crew during start up commissioning of the plant and a permit receiver up to present.
1996 to 11/2007 Machinist II General Atomics | Cherry Hills Village, CO,
  • With 10 years experienced in Sugar Industries as a Mechanic II in Crystal Sugar Company Inc., Philippines.
  • Good experienced in overhauling of centrifugal pump, rotary pump, vertical pump, vacuum pump, reciprocating pump, turbine and compressor, gear boxes, mechanical seal, and do alignment.
  • Preventive maintenance of rotating equipment grease lubrication and oil, splicing and vulcanizing of belt conveyor.
05/1989 to 10/1996 Plumber/Fiberglass Technician Victorias Milling Company Inc NEDCOR | City, STATE,
  • Address: Victorias City, Negros Occidental.
01/1989 to 01/1996 Work experienced summary | , ,
  • With 3 years experienced in Plumber and 3 years experience in fiberglass Technician in Victorias milling Company Inc., Philippines.
  • Good experienced lay out and installing of Plumbing job.
  • Good experienced Fiberglass lamination as followed.
  • RTR Elbow RTR Tank RTR pipe RTR Flanges TRAININGS AND SEMINARS.
  • Work permit Reciever Rabigh Refining & Petro Chemical Company, Rabigh, KSA; Jan.
  • 1, 2011 up to present.
  • Safe Working with Bundle Extractor Pienemann, Rabigh, KSA, Dec.
  • 31, 2010 Safety Orientation, Safety Overview Crystal Sugar company Inc., Philippines, July 08, 2006 Bearings - FAG Bearings Crystal Sugar Company Inc., Philippines, 2006 Lubrication Shell, Castrol, Mobil Crystal Sugar Company Inc., Philippines 2005 Value Formation Seminar.
Education
Expected in 1989 to to Undergraduate | BS in commerce St La Salle University, Victorias City, Negros Occidentel GPA:
Status -
Expected in 1986 to to High School Diploma | secondary Manapla High Scool, Victorias City, Negros Occidental GPA:
Status -
Expected in 1982 to to High School Diploma | primary North Negros Elementery School, Victorias City, Negros Occidentel GPA:
Status -
Skills

Static and Rotating technician in Petro Chemical from 2007-2014, Machinist II in Sugar Industries 1996-2007, Fiberglass technician and plumber 1989-1996

Additional Information
  • Nationality: Filipino Age: 46 yrs old Address: Rabigh, K.S.A. Civil Status: Married

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Your data is safe with us

Any information uploaded, such as a resume, or input by the user is owned solely by the user, not LiveCareer. For further information, please visit our Terms of Use.

Resume Overview

School Attended

  • St La Salle University
  • Manapla High Scool
  • North Negros Elementery School

Job Titles Held:

  • Millwright
  • Machinist II
  • Plumber/Fiberglass Technician
  • Work experienced summary

Degrees

  • Undergraduate
  • High School Diploma
  • High School Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in:As seen in: