Livecareer-Resume
Jessica
Claire
resumesample@example.com
(555) 432-1000,
Montgomery Street, San Francisco, CA 94105
:
Professional Summary
 TX/RAN roll Out Implemetations] with 9 years of experience in Field of Telecommunications. Areas of expertise include Transmission and BTS Implementations,configuration and Integrations.
Talented Telecoms professional with an extensive background in electrical engineering, specializing in roll out implementations,project coordination, corrections and acceptance procedures.
 However. Having a Results-oriented Electrical Engineer known as a consistent team player with skilled technical abilities.
Skills
  • Underground electrical systems
  • Expertise in troubleshooting [Network performance]
  • Leadership
  • Strong presentation skills expecially on acceptance process
  • Creative problem solving
  • Project Management
  • Site roll out implementations
  • Team player
  • RBS 6000 series PDH and SDH roll out Implementations
Education
FEDERAL UNIVERSITY OF TECHNOLOGY-AKURE AKUR, ONDO STATE, NIGERIA Expected in 2006 Bachelor of Science : ELECTRONICS/TELECOMMUNICATIONS - GPA :
UNIVERSITY OF LAGOS Yaba LAGOS, AKOKA Expected in 2005 ADVANCE DIPLOMA : PROJECT MANAGEMENT - GPA : RBS 2216/2116 Installation & Verification (LZU 108 /6731/6732).August 2006      (Ericsson) iRBS 2216V2/RBS 2116V2 Configuration and Commissioning September 2009               (MTN NIGERIA) iHarris True Point T 5000 series          December 2009                                                     (MTN NIGERIA) iDXX 6325 and DXX 6340 Craft Terminal Installation and commissioning                          (MTN NIGERIA) iHarris stratex Architecture Modules 1 & 2 series                                                                (MTN NIGERIA) iSATETY CLIMBING TRAINING                                                                                         (ABB & MTN NIGERIA) iRBS 6102/6101 &BBS/BBU/GBF Installation Training June 2012 LZU 108 7642              (Ericsson)  
, Expected in 2005 2001 2001 1995 Post Graduate Diploma : - GPA :

Design, maintain, and repair devices and systems that transmit data. Telephones, televisions, and the Internet are among the most familiar instruments of telecommunication.
Areas of study include computer networking, communications networks and systems, controls and signals, circuits, fiber optics, and wireless systems and technology.

, Expected in Electronics/Telecoms EngineeringUniversity of Technology - AKURE, ONDO STATE, Nigeria Higher : - GPA :
, Expected in National Diploma (HND) : Electrical Engineering Electronics/Telecommunica - GPA : CONTROL ENGINEERING
ELECTRONICS DESIGNS
THERMODYNAMICS
ADVANCE CIRCUIT THEORY
MATHEMATICS
TELECOMUNICATIONS THEORY GSM EVEOLUTIONS
OptionYaba College of Technology , Expected in Diploma : Electronics/Telecoms' Engineering - GPA : ELECTRICAL ENGINEER
WAEC TECHNICAL COURSE C FINALS
CITY & GUILD IN ELECTRICAL INTERMEDIATE
ASSOCIATION OF ELECTRICAL ENGINEER
, Expected in YABA,LAGOS, LAGOS, NIGERIA HIGHER NATIONAL DIPLOMA 1999 TO 2001 IN ELECTRONICS /TELECOMMUNICATION ENGINEER-UPPER CREDITORDINARY NATIONAL DIPLOMA 1995 TO 1998 IN ELECTRICAL/ELECTRONICS ENGINEERING-UPPER CREDIT : - GPA :
, Expected in Diploma : Electrical / Electronic Engineering Upper Cr - GPA :
Work History
Bickford Senior Living - TX/ RAN INTEGRATION ENGINEER
Crystal Lake, , 07/2013 - Current

  Mini link Traffic Node Swap/aggregations activities and upgrade of SBL   to Release 5.0.1 for capacity upgrade both on SDH and 32E1 PDH links.
Mini-link TN Backbone Capacity upgrade implementing 2 X(1+1) XPIC   configurations to convey 2X75E1 with frequency reuse.
Mini-link TN Super PDH upgrade to 32X2E1 at 8 respective regions and   swapping of Harris Mega star link.
XPD's and CCDP test on the Backbone on 2(1+1) XPIC configurations on   the capacity upgrade to optimize the backbone links (CCDP's) results .
Clean up and the acceptance to the customer MOOV and the MS   team of the network for the SIKA and RAN 2012/2013 project.
Backbone link with PDH links acceptance Clean up and acceptance   procedure .
RBS 6000 roll out swaps acceptance and HARRIS Megga Star swap-out  to   ERICSSON.
 Clean up and acceptance on MLTN and RBS 6000 series on SIKA and RAN 2013 project

Knauf Insulation Gmbh - REGIONAL REAM LEAD ON MANAGED SERVICES
Inwood, , 04/2013 - 07/2013

Co-ordination, planning and supervision of Field Maintenance   Technicians (O&M) to their respective site allocations.
Support and Knowledge Transfer to the Field maintenance engineer in   some major outage in the respective Supervision of ASP's (Vendor) on passive for the provision of servicing, maintenance both Power Electro-Mechanical aspect and distribution of fuel to the site generators on sites in the region.
Cleaning of the Transmission network connectivity alarms on Airtel Sierra-   lone both on Ericsson ML TN and NEC Paso- link.
Clearing of Hardware alarms on RBS 2206,2207,6101,6102 cabinets on 2G on all Airtel Sites Correction on Transmission nodes, Software upgrade on their TN Transmission node both on physical Installation and software respectively
.Cabinet expansion on the existing Cabinet on RBS 2000 series and RBS   6000 series on 2G Supervisions.
 configuration of new sites on 2G cabinet upgrades on RBS 6000 and clearing of CF alarms at sites.Corrective and preventive maintenances on the 3G

ERICSSON AB IVORY COAST - SITE SUPERVISOR ON 3G RAN/TX INTEGRATION ENGINEER
City, , 09/2012 - 01/2013
  • Mini link Traffic node swap activities and upgrade of the node on Release 4.4.2 for capacity upgrade and Ethernet configuration for 3G.-MN TN Ethernet Configuration wit Ethernet .Transport routing with ETU and packet switches routing.
  • 3G.-Supervision on RBS 6000 series implementation and 6101(2G) Capacity upgrade on different sectors.-Supervision of swap activities of RBS2216V2 to RBS 6101 for both 3G/2G.
  • Supervision, Integration & commissioning of new Nodes, loading of site scripts such OAM, Site Equipment and Transport Network (TN) - using Element Manager and moshell for clearing Alarms on 3G-Implementations of both 2G and 3G on a single RBS6101 cabinet Clean up for acceptance to the customer and Operation and maintenance of the network both 2G and 3G sites on the existing alarms on site.-Impacting the knowledge on RBS 6000 Swap activities to the locals and 3G commissioning-Acceptance procedure to the customer for both New sites and swapped sites inclusIve.
ERICSSON AB GHANA - ACCRA - SITE SUPERVISOR ON 2G/3G RAN ENGINEER
City, , 2012 - 06/2012
  • Installation and commissioning of RBS 6000 series with PBC- 6200/BBS2116 cabinet for a new project roll-out release and expansion/Upgrade on the WRAN network.*Site inspection during the installation process, working closely with sub- contractors/ASP's to ensure installation process is according to ERICSSON standard.*Supervision of Installation and commissioning of RBS6101, RBS 6102 2G Expansion on existing both RBS 2116V2, RBS 6101 and RBS6102, PBC6200, BBS2116V2 on different capacities.
  • Supervision of Installation and commissioning of RBS 6601 on IBS on Customers Buildings with SSC-02 Battery Back-up system.
  • Swapping of RBS 2000 series to RBS 6000 series (i.e.
  • RBS 6101 and RBS 6102) and also commissioning of both 2G and 3G on one RBS 6000 cabinet.
  • And Use of EMERSON rectifier BBS SSC-02 and PBC-2 depend on different Capacities*Perform Connectivity Test for Element Manager Telnet Connection and Serial Connection for 3G*Integration & commissioning of new Nodes, loading of site scripts such.
ERICSSON SENEGAL - SITE SUPERVISOR ON 2G RAN ENGINEER
City, , 09/2011 - 2012
  • ON RBD 2111V2 AND RBS 6000 SERIES ERICSSON AG SENEGAL ON MTN LONE STAR PROJECT - LIBERIA Implementation, configuration and Integration of RBS 2000 series upgrades with the combination of RBS 2116V2 with RBS 2111V2 with its (wimax) optic fiber connectivity for the desired configuration on TG synchronization.*Implementations ,configuration, Integrations Training of RBS 2111V2,PBC-02 BBS and Modification of BBS2116V2 with the Locals Technicians*Implementation, configuration and Integrations of RBS 6101 with the Training of Locals Lone star Technicians on (8+8+8) upgrades configurations.*Transmission connectivity for the E1 on respective sites upgrades implemented on Mini-Link TN*TG synchronization with different RBS 2000 series version for desired configuration.
ERICSSON SEMEGAL - RBS & ML TN SITE SUPERVISOR
City, , 06/2011 - 10/2011
  • ERICSSON AB SENEGAL ON MOOV IVORY COAST - ABIDJAN Manage and Support the Authorized Service Provider (ASP) teams during site implementations.*Organize and Coordinate the sites installations with the Project Manager, Customer and Authorized Service Provider.
  • Network deployment (Sites Coordinator, project planning for RBS 2116V2, 2216V2, BBS2116V2, ML TN and Integration of Transmission circuits for operations of network on the planned network connectivity on the Backbone for MOOV "Big Bang Project in COTE DI'VOIRIE (Abidjan).*Configurations and cross connecting of E1 for the DCN and I.P Address parameters allocated for respective links in the network.*Coastal Backbone upgrades implementation and Traffic Routing of all the respective E1 to another BSC.*Densification projects Implementation of RBS upgrades on different configuration and 1800MHZ RBS implementations*Coordinating order equipments & accessories for both SDH and PDH link installations & upgrades.*Migration of Network traffic fr.
ERICSSON SENEGAL - RBS & ML TN SITE SUPERVISOR
City, , 01/2011 - 07/2011
  • ERICSSON AB SENEGAL ON MOOV TOGO PROJECT - LOME,TOGO *Manage and Support the Authorized Service Provider (ASP) teams during site implementations.
  • Organize and Coordinate the sites installations with the Project Manager, Customer and Authorized Service Provider.*Network deployment ( Sites Coordinator, project planning for RBS 2111V2 with SSC-02 Cabinet,RBS2116,RBS2216,RBS2106,BBS2116V2 ,Ericsson Mini-Link TN 2P,6P and 20P nodes respectively for MOOV "Big Bang Project in Togo)*Implementations and configurations of the back- bone Connectivity including the Mux's plan designed for the whole network connectivity of MOOV Big Bang TOGO project as Planned by the TND.*Network Operations and Maintenances both on E1 routing connectivity's and RBS 2000 Families Solutions..*Configurations and cross connecting of E1 for the DCN and I.P Address parameters allocated for respective links in the network*Ensure that the Installation technicians work is in accordance with the SID procedures and with.
ERICSSON AB SENEGAL - RBS & ML TN SITE SUPERVISOR
City, , 07/2010 - 2011
  • ERICSSON AB BENIN - COTONOU Organize and Coordinate the installation with the Project Manager, Customer and Authorized Service Provider.*Network deployment ( Sites Coordinator, project planning for RBS,ML TN and Marconi OMS 1600 series for MOOV "Big Bang Project in Benin)*Ensure that the Installation technicians work is in accordance with the company procedures and with respect to customer's directives.*Ensure that the installation is followed and that correct methods, instructions, checklists, tools and reports are done accordingly.*Provisional Site acceptance from Authorized Service Provider (ASP) in contributing all the necessary inputs to the site built.*Act and report of wrong installation execution and correcting it immediately Cross-Connection (Routing) of E1 from the Backbone (OMS1600 series) to the terminal sites Mini-link TN.*Configuration of RBS2116V2, RBS2106, BBS2116V2 and Mini-Link Traffic Node.*Test and Integrate BTS and Microwave equipments ML TN 2P, 6P and 20P.
MTN NIGERIA CPG IBADAN REGION - IBADAN REGION - TX COORDINATOR
, , 06/2009 - 07/2010
  • Site readiness for Point to Point (PTP) and Point to multiple Point (PMP) radios in planning for new sites and Upgrade requirement.*Commissioning & Integration of all DXX nodes FP4 &PDH upgrades.*Implementation and commissioning of DXX 6300 series and 8600 series according to the W.A released specification.*O&M of all transmission links in Benin MSC and assist the field Network Maintenance Engineers *Coordinate the release of relevant WAs from TX planning &Topology units for all upgrades.*Cross connecting of E1 for both 2G(2216,2116,2116v2 and2216v2) and 3G(3106,3206) monthly Site built on SPDH and PDH radios*Fiber implementations Integration for Third Parties (Private Telephone Operators) in Benin MSC Fiber ODF.*Coordinating order equipment & accessories for \PMP &WIMAX TX installation & upgrades for the Region (Benin).*Coordinating order equipments & accessories for both SDH and PDH link installations & upgrades for the Region*Marconi Long haul Civil inspection, Implementation and Integration to the network.
AFGHAN WIRELESS COMMUNICATION COMPANY -
, , 01/2008 - 06/2009
  • Integration of Transmission circuits for operations of network on the job/work orders (jumpering).Implementation and commissioning of Site Auditing for Swapping of Network upgrade both on RBS2000,BBS2000 &RBS3000 family, MINILINK ERICSSON & Harris Stratex Equipments.Project supervision, co-ordination, and implementation on both BTS, Transmission, jump ring/cross-connection from DXX to the new sites and existing sites (upgrade) connectivity and site integrations.Technical Site Survey for all new and existing sites.
  • Installation and configuration of Mini-link E and traffic node (IP base).
  • Implementation of I.B.S (Indoor Building Solution) Project Distributing Antennae System at Muritala Mohammed International Airport, Etiebet Building, UBA building Marina and also use of Cell extender for Zain projects.Implementation and commissioning of RBS 2206 &RBS 2216 /RBS2106& RBS 2116 (outdoor) Ericsson on 900MHZ& 1800MHZ.Swapping of RBS 2202 to RBS 2206 & RBS 2216 on (900MHz&1800MHZ) on both Celtel.
AFGHAN WIRELESS COMMUNICATION COMPANY - Operations Microwave Engineer
City, , 05/2007 - 11/2007
  • O&M Access &Transmission KUNDUZ Province Operations, preventive and corrective maintenance of both PDH radios such as SIAE, STRATEX and SIEMENS both with different traffic capacity and different frequency.Conducted realignment orientation as well as fine tuning of the Microwaves link to have good and desirable receive signal level.Conducted preventive, corrective and predictive maintenance for both PDH and SDH radio SIAE, High Density systems of Marconi, Nera, SIAE (AL & EL Series), Siemens, Harris Eclipse, NEC equipment.Performed monitoring performance such as BER TESTER Installation and commissioning of PDH and SDH microwave radio such as SIAE EL and Al series in both traffic capacity and backbone (STM-1).Installation and commissioning of PDH microwave radio Eclipse stratex equipments.Activation/Mapping of E1 through the Matrix of Add/Drop Multiplex unit (ADM-C) SIAE EQUIP.from SDH link (west) to SDH link (east) and cross connected to the PDH link and Subscribers for their Radio networ.
- BTS /TRANSIMMISION ENGINEER SUPERVISOR
, , 05/2006 - 05/2007
  • AGATE TELECOMMUNICATIONS - LAGOS,NIGERIA BTS /TRANSMISSION IMPLEMENTATION OF RADIO BASE STATION General BTS/TRANSMISSION with Battery Backup implementation within Nigeria and other West Africa countries as an expatriate on behalf of ERICSSON.Installation of various RBS like RBS2202, RBS2206, RBS2207,BBS2212,BBS2116 as well as latest third generation (3G) micro RBS like 3306 and macro RBS like 3206 etc, power cabling, grounding and termination of jumper cables.Evaluation, acceptance and inventory of all new equipments at the site before implementation to meet the schedule period specified by C.P.A Installation of outdoor RF feeders and termination, performance of various reliability test such as DTF test, insertion cable loss and return loss (VSWR) using Arintsu site master S331D type (DTF,VSWR) and wave guide installation.Direction/positioning of Microwave antenna using analogue compass and Global positioning system (GPS) Supervision of installation and commissioning of Ericsson Minilink ante.
NA - Transmission/RBS Engineer Supervisor
, , 08/2004 - 06/2006
  • Lagos BTS Installer with its BBS 2000 series and Transmission Implementations ERICSSON MINILINK- E, Traffic Node (TN) High Capacity Equipments such as 0.3.0,0.6, 1.2,1.8,2.4 M Antennas with 7,8,13,15,23,GHZ RADIO (this involve both PDH and SDH system) Implementations of RBS2000 FAMILY such as RBS 2202,2206,2207,2309 and RBS 3000 FAMILY such as 3206, 3202 (3G Series according to the Commissioning Manual).Point To Point Microwave Link Implementation and Alignment Installation and Maintenance of Dual Polarised Feed and Adjustment Antenna RF Configuration (to Include Antenna And Power) Ensure That All BTS, Transmission And Ancillary Equipments Are Installed According To Recommended Standards And Specification.Enforcement of Safety Rules and Safety Devices on the Site.
  • Pre-Survey and Post-Survey of Site - Check orientation of Antenna.
  • Experts in Telecoms Implementation both on both RBS and Point to Multi point in Sierra Leone on Ericsson project in CELTEL Sierra Leone for Six Months on Roll out Proje.
FADCO NIGERIA LIMITED - BTS/Installation Engineer
, , 05/2003 - 08/2004
  • Installation of Mini link E and Radio Transceiver Radio Base Station.
  • Performed Site master test for 900M/HZ, 1800M/HZ Feeder cables.
  • Installation of Ericsson Micro Wave (Mini link E 7, 8, 13, 15 and 23 GHz).
  • Making of feeder connector, jumper installation, feeder earthing, Base station earthing, and batteries backup installation.Installation of Roof Top Radio Base Stations.
  • Installation of BBS 2000 series back-up system of -48V Installation of Masts in range of (41) m SWE-SITE.
- Graduate Engineer
, , 02/2002 - 03/2003
  • CHEVRON TEXACO NIGERIA LIMITED NYSC - Lagos Preventive, Predictive and Corrective Maintenance in All Electrical Appliances and Equipment.Ability to operate & work on Computer Software and Hardware Troubleshooting and Maintenance of Large AC and DC Electric Motors, Steam Boiler Plant Water and Air Pump.Performance of various tests on Electrical Installation and Building such As Insulation Test, Continuity, Ohm Value and Earthing Value Measurement.PROFESSIONAL TRAININGS/COURSES RBS 2216/2116 Installation & Verification (LZU 108 /6731/6732).August 2006 (Ericsson) RBS 2216V2/RBS 2116V2 Configuration and Commissioning September 2009 (MTN NIGERIA) Harris True Point T 5000 series December 2009 (MTN NIGERIA) DXX 6325 and DXX 6340 Craft Terminal Installation and commissioning(MTN NIGERIA) Harris stratex Architecture Modules 1 & 2 series (MTN NIGERIA) SATETY CLIMBING TRAINING (ABB & MTN NIGERIA) RBS 6102/6101 &BBS/BBU/GBF Installation Training June 2012 LZU 108 7642(Ericsson) CONTACT DETAIL: 17,OKUNNOWO ST.
Accomplishments
  • Name: Claire NOSIRU TAIWO +22898624028,+2348096800372,+2348028742597 Nationality:NIGERIAN Summary of working experience: Experiences in Transmission Implementations both on PDH and SDH links,Transmission swaps,aggregations and Transmission upgrades on Ericsson ML TN,ML E.BTS Supervisions, configurations ,upgrades and swap of RBS 2000 cabinet to RBS 6000 series on 2G and 3G respectively.
  • Dedicated RAN and TX Access Supervisors with excellent technical, analytical and communication skills demonstrated by 8 years+ of experience.with several project MAnaged on Roll-Out, Network maintenance and Closure of Projects such as ATLANTIC Big bang MOOV project in BENIN,TOGO and Ivory Coast respectively .and Other Telecoms related works Subcontractor management i.e.
  • evaluation, Supervision, control, Training and provision of needed materials for site implementations.
  • Facilitates Site engineering Installation documents for Subcontractors in AiIRTEL GHANA project , SIERRIA-LEONE on Network maintenance and 3G projects in AIRTEL GHANA and MOOV project in IVORY COAST.
  • SKILLS Project managementTeam player Training designed Sites (Roll-out) Strong presentation skills implementationsTelecoms Transmission's implementations on PDH and LeadershipSDH RBS 6000 series training on 2G and 3G 9Ericsson Training) ACCOMPLISHMENTS Project Management Supervised project Implementations effort to ensure projects were completed in ERICSSON standards with quality on time and within budget constraints.Project Coordination Network Corrections ,Supervision,coordinations with hard work on Network performance to optimize the network and project set-up support to the communications staffs on Managed Serviced.

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

Disclaimer

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

How this resume score
could be improved?

Many factors go into creating a strong resume. Here are a few tweaks that could improve the score of this resume:

66Fair

resume Strength

  • Length
  • Personalization
  • Target Job

Resume Overview

School Attended

  • FEDERAL UNIVERSITY OF TECHNOLOGY-AKURE
  • UNIVERSITY OF LAGOS
  • OptionYaba College of Technology

Job Titles Held:

  • TX/ RAN INTEGRATION ENGINEER
  • REGIONAL REAM LEAD ON MANAGED SERVICES
  • SITE SUPERVISOR ON 3G RAN/TX INTEGRATION ENGINEER
  • SITE SUPERVISOR ON 2G/3G RAN ENGINEER
  • SITE SUPERVISOR ON 2G RAN ENGINEER
  • RBS & ML TN SITE SUPERVISOR
  • RBS & ML TN SITE SUPERVISOR
  • RBS & ML TN SITE SUPERVISOR
  • TX COORDINATOR
  • Operations Microwave Engineer
  • BTS /TRANSIMMISION ENGINEER SUPERVISOR
  • Transmission/RBS Engineer Supervisor
  • BTS/Installation Engineer
  • Graduate Engineer

Degrees

  • Bachelor of Science
  • ADVANCE DIPLOMA
  • Post Graduate Diploma
  • Electronics/Telecoms EngineeringUniversity of Technology - AKURE, ONDO STATE, Nigeria Higher
  • National Diploma (HND)
  • Diploma
  • YABA,LAGOS, LAGOS, NIGERIA HIGHER NATIONAL DIPLOMA 1999 TO 2001 IN ELECTRONICS /TELECOMMUNICATION ENGINEER-UPPER CREDITORDINARY NATIONAL DIPLOMA 1995 TO 1998 IN ELECTRICAL/ELECTRONICS ENGINEERING-UPPER CREDIT
  • Diploma

By clicking Customize This Resume, you agree to our Terms of Use and Privacy Policy

*As seen in: