LiveCareer
LiveCareer
  • Dashboard
  • Jobs
  • Resumes
  • Cover Letters
  • Resumes
    • Resumes
    • Resume Builder
    • Resume Examples
      • Resume Examples
      • Nursing
      • Education
      • Administrative
      • Medical
      • Human Resources
      • View All
    • Resume Search
    • Resume Templates
      • Resume Templates
      • Nursing
      • Education
      • Medical
      • Human Resources
      • Customer Service
      • View All
    • Resume Services
    • Resume Formats
    • Resume Review
    • How to Write a Resume
    • CV Examples
    • Resume Objectives
  • Cover Letters
    • Cover Letters
    • Cover Letter Builder
    • Cover Letter Examples
      • Cover Letter Examples
      • Education
      • Medical
      • Human Resources
      • Customer Service
      • Business Operations
      • View All
    • Cover Letter Services
    • Cover Letter Templates
    • Cover Letter Formats
    • How to Write a Cover Letter
  • Jobs
    • Mobile App
    • Job Search
    • Job Apply Tool
    • Salary Calculator
    • Business Letters
    • Job Descriptions
  • Questions
  • Resources
  • About
  • Contact
  • 0Notifications
    • Notifications

      0 New
  • jane
    • Settings
    • Help & Support
    • Sign Out
  • Sign In
Member Login
  • LiveCareer
  • Resume Search
  • Murab, Leabub & Arab Contractors
Please provide a type of job or location to search!
SEARCH

Murab, Leabub & Arab Contractors Resume Example

Resume Score: 80%

Love this resume?Build Your Own Now
MURAB, LEABUB & ARAB CONTRACTORS
Summary

Seasoned Construction Site Engineer able to manage simultaneous responsibilities to keep construction running smoothly. Excellent planner and problem solver versed in site preparation and day-to-day management.

Project Engineer experienced in spearheading civil Bridge Construction, Erosion control projects. Successful at leading design and construction operations to maximize efficiency and minimize costs. Strong surveying, pattern analysis, and project management skills.

Skills
  • Safety awareness
  • Construction quality standards
  • Project management experience
  • Project coordination
  • Technical expertise
  • Ability to analyze surveys
  • Team management
  • IT skills
  • Erosion and sedimentation control
  • Analytical problem solving
  • Stress analysis
Experience
Murab, Leabub & Arab Contractors | 09/1989 to 11/1997Site Supervisor - Lagos, Lagos Nigeria
  • Planned and executed Project
  • Successfully led key projects which resulted in controlling erosion and flooding.
  • Successfully led the pipe laying project in Lagos metropolitan under Leabub construction.
  • Led the construction of offices complex and residential building in various project site across Nigeria.
Site Engineer | 11/1997 to 11/2009Dekit Construction Limited - Abuja, Abuja, Nigeria
  • Completed site surveys, marked locations and oversaw construction of various projects.
  • Coordinated with other engineers and construction professionals to manage various stages of construction projects.
  • Provided technical advice to project workers to apprise of issues and implement proactive solutions.
  • Reviewed construction activities for compliance with health and safety requirements.
  • Answered technical concerns and devised solutions to resolve site and engineering problems.
  • Supervised and monitored project subcontractors and labor force.
  • Directed engineering-related activities at project sites.
  • Managed work processes for contractors to maintain project schedules.
  • Implemented safety and accident prevention programs prior to start of each project, conducting tailgate meetings daily.
  • Surveyed sites, collected measurements and assessed project conditions.
  • Surveyed project sites to establish reference points to guide construction.
  • Advised project manager regarding construction material costs and quantity calculations.
  • Developed and implemented engineering solutions to variety of project and design issues.
Project Engineer | 11/2009 to 10/2011Dekit Construction Limited - Abuja, Abuja Nigeria
  • Conducted onsite inspections and prepared takeoffs for engineering project costing.
  • Developed and implemented improved database tools to estimate project scopes and costs.
  • Developed, coordinated and monitored all aspects of production.
  • Reduced waste by designing and implementing efficient project designs using cost-effective materials and timelining.
  • Developed and implemented engineering solutions to variety of project and design issues.
  • Coordinated with project installation group to ensure appropriate technical support during project execution.
  • Provided onsite training and addressed issues quickly to drive projects towards completion.
  • Conducted conductibility assessments, which involved independent, in-depth appraisals of construction bid documentation to assure coordination, alleviate issues and remove redundancy.
  • Tested soils and materials to assess adequacy for supporting foundations, concrete and other materials.
  • Provided technical support to engineers and customers.
  • Ensured that all health, safety and quality assurance process controls were initiated and observed by crew members.
  • Identified methods that would effectively alleviate concerns regarding design, construction and materials.
  • Computed loads and material stresses to determine optimal design specifications for foundations and bridge spans.
  • Compared installations against drawings and project specifications to ensure compliance.
  • Designed presentations of work.
  • Surveyed sites, collected measurements and assessed project conditions.
Project Manager | 10/2011 to 09/2017Lopek Engineering & Construction Limited - Lagos, Lagos Nigeria.
  • Devised implementation plans, including cost-benefit and ROI analyses.
  • Established key issues in need of resolution and project performance metrics to set planning objectives.
  • Completed thorough risk assessments and deployed management and response strategies to prevent roadblocks.
  • Updated project plans based on changing objectives, specifications and staff availability.
  • Oversaw budgets for project, tracked expenses and timeline's and communicated with key stakeholders on milestones.
  • Made changes to project scope and cost and implemented most effective change management processes to keep project up-to-date.
  • Met project benchmarks while reducing costs through introduction of enhanced implementation strategies.
  • Provided updates and managed inquiries for delivery of quality products and services.
  • Kept project teams on-task with proactive control of budgets, schedules and scopes.
  • Trained and coached key team members on production techniques to establish expectations and ensure compliance with quality guidelines.
  • Outlined work plans, assessed resources and determined timeline's for projects.
  • Maintained close connection with project personnel to quickly identify and resolve problems.
  • Developed new analytics tool to allow senior management to understand impact of each project.
  • Inspired team members by fostering positive environment and boosting employee confidence.
  • Maintained high quality standards by educating general contractors on quality control.
  • Defined project deliverable and monitored status of tasks.
  • Coordinated construction planning, material resources and staff scheduling to ensure on-time, under-budget completion for the projects.
  • Oversaw adherence to project timeline's and budget constraints.
  • Monitored team progress and enforced deadlines.
  • Improved project completion time by multitasking on heavy equipment.
  • Supervised crew to facilitate top quality and achievement of project milestones.
  • Conducted technical and customer meetings to increase communication and strengthen internal and external relationships.
  • Decreased process discrepancies, proactively inspecting performance and site safety while monitoring project status.
  • Scheduled material deliveries, equipment repair and shipment transportation.
Education and Training
Adamawa State University - - Mubi Nigeria | Post Graduate DiplomaGeneral Management, 11/2005
Yaba College of Technology - - Yaba Lagos Nigeria | Higher National DiplomaBuilding Technology, 06/1995
Federal Polytechnic Ilaro - - Ilaro Ogun State Nigeria | National Diploma09/1991
Accomplishments
  • Construction of Pako baruwa road in Ipaja Lagos
  • Construction of Foworogi Bridge at Ibadan Oyo State
  • Construction of Ogbese Bridge Linking Okeluse and ogbese in Ondo and Edo State Nigeria
  • Responsible for construction of Ikorodu Mile 12 Pedestrian bridge along the corridor of BRT
Certifications
  • Corporate Member Nigeria Institute of Building (NIOB)
  • Member Council of Register Builder of Nigeria (CORBON)
Build Your Own Now

DISCLAIMER

Resumes, and other information uploaded or provided by the user, are considered User Content governed by our Terms & Conditions. As such, it is not owned by us, and it is the user who retains ownership over such content.

Resume Overview

Companies Worked For:

  • Site Supervisor
  • Dekit Construction Limited
  • Lopek Engineering & Construction Limited

School Attended

  • Adamawa State University
  • Yaba College of Technology
  • Federal Polytechnic Ilaro

Job Titles Held:

  • Murab, Leabub & Arab Contractors
  • Site Engineer
  • Project Engineer
  • Project Manager

Degrees

  • Adamawa State University - Mubi Nigeria | Post Graduate Diploma
    Yaba College of Technology - Yaba Lagos Nigeria | Higher National Diploma
    Federal Polytechnic Ilaro - Ilaro Ogun State Nigeria | National Diploma

Create a job alert for [job role title] at [location].

×

Advertisement

About
  • About Us
  • Privacy Policy
  • Terms of Use
  • Sitemap
Help & Support
  • Work Here
  • Contact Us
  • FAQs
Languages
  • EN
  • UK
  • ES
  • FR
  • IT
  • DE
  • NL
  • PT
  • PL
Customer Service
customerservice@livecareer.com
800-652-8430 Mon- Fri 8am - 8pm CST
Sat 8am - 5pm CST, Sun 10am - 6pm CST
  • Stay in touch with us
Site jabber winner award

© 2021, Bold Limited. All rights reserved.